Search Criteria
Asset Type                           
Status

Search result: 5 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                              
Type Production, Grades and Recovery Rates for 2017
Asset
Mine
Project
Report
Gold Silver Copper Lead Zinc Molybdenum
Metal / Metal in conc.
Head Grade
Recovery Rate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
koz g/t % koz g/t % kt M lbs % % % kt M lbs % % % kt M lbs % % % kt M lbs % % %
AssetMineProjectReportGoldGold HGGold RRSilverSilver HGSilver RRCopper Conc.CopperCopper HGCopper RRCopper CGLead Conc.LeadLead HGLead RRLead CGZinc Conc.ZincZinc HGZinc RRZinc CGMolybdenum Conc.MolybdenumMolybdenum HGMolybdenum RRMolybdenum CG
India
........................ Subscription required
Subscription required
      
      
      
      
      
          
    
    
    
    
    
20  
1.4  
    
    
    
187  
10  
    
    
    
    
    
    
    
India
........................ Subscription required
Subscription required
      
      
      
      
      
          
    
    
    
    
15  
13  
1.2  
69  
41  
65  
71  
5.2  
83.8  
48.9  
    
    
    
    
    
India
........................ Subscription required
Subscription required
      
      
      
      
      
          
    
    
    
    
    
99  
1.7  
    
    
    
1,065  
12.2  
    
    
    
    
    
    
    
India
........................ Subscription required
Subscription required
      
      
      
      
      
          
    
    
    
    
109  
132  
2  
88.1  
55.8  
231  
258  
3.8  
91  
50.9  
    
    
    
    
    
India
........................ Subscription required
Subscription required
      
      
      
      
      
          
    
    
    
    
3  
66  
2.1  
90.5  
    
3  
85  
2.7  
90.2  
    
    
    
    
    
    
Key Personnel
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
¨  Combined production. Please see the Property Profile for details.
Subscription required - Subscription is required.