Overview
Stage | Production |
Mine Type | Open Pit |
Commodities |
|
Mining Method |
|
Production Start | ...  |
Mine Life | 2044 |
Source:
p. 247,248
Minera Antucoya S.A., is a 70%-owned subsidiary of Antofagasta, and holds the Antucoya operations. Marubeni Corporation, the Antofagasta’s 30% minority partner in Centinela and Antucoya.
Contractors
- Subscription is required.
Summary:
The Antucoya porphyry copper deposit is situated 120 km northeast of Antofagasta in the Early Cretaceous metallogenic belt of the Coastal Cordillera.
The mineralized system is related to granodioritic porphyry (Antucoya porphyry) and dacite porphyry (Buey Muerto porphyry). Late dacitic dikes intrude the former ore-related intrusions and Jurassic andesitic host rocks in a tectonic environment dominated by splays of the Atacama Fault System.
The principal mineralization constitutes a column 350 m thick, composed of atacamite, brochantite, Fe-Cu sulfates, Cubearing limonite, chrysocolla and black oxides, with rare chalcocite and covellite in a thin supergene enrichment blanket.
In the underlying hypogene zone, the mineralization is dominated by chalcopyrite>pyrite>bornite hosted by A- and B veins in potassic alteration, and in C-veins on the periphery of the porphyry intrusions. The pyrite/chalcopyrite ratio is greater in D-veins within a shallow phyllic zone. The Mo distribution is erratic and poorly characterized. The total resource is 1204 Mt at 0.31%CuT, using a 0.15%CuT cut-off.
Summary:
Antucoya is a low-grade, low strip-ratio, oxide deposit located approximately 125 km north-east of the city of Antofagasta.
Conventional open-pit mining method with preliminary drilling and blasting operations is utilized for extraction oxide ore.
There are electric shovels and Front-end loaders used for extraction-and-loading.
The project have source its water (280L/s) from shared sea water pipeline between Antucoya and Centinela.
Source:

- subscription is required.
Flow Sheet:
Summary:

- subscription is required.
Production:
Commodity | Units | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 |
Copper
|
t
| ...... ^ | ......  | ......  | ......  | 72,200 | 80,500 | 66,200 |
All production numbers are expressed as cathode.
^ Guidance / Forecast.
- Subscription is required.
Operational Metrics:
Metrics | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 |
Daily processing rate
| ......  | ......  | 66.5 kt | 74.7 kt | 79.7 kt | 67.6 kt |
- Subscription is required.
Reserves at December 31, 2021:
The ore reserve cut-off grade is 0.16% copper.
The ore resources cut-off grade is 0.15% copper.
Category | Tonnage | Commodity | Grade |
Proven
|
435.9 Mt
|
Copper
|
0.33 %
|
Probable
|
309.6 Mt
|
Copper
|
0.3 %
|
Proven & Probable
|
745.5 Mt
|
Copper
|
0.32 %
|
Measured
|
465.4 Mt
|
Copper
|
0.33 %
|
Indicated
|
388.9 Mt
|
Copper
|
0.3 %
|
Measured & Indicated
|
854.3 Mt
|
Copper
|
0.31 %
|
Inferred
|
337.4 Mt
|
Copper
|
0.26 %
|
Total Resource
|
1,192 Mt
|
Copper
|
0.3 %
|