Search Criteria
Asset Type                           
Status

Search result: 9 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                              
Type Commodity Costs (2017) Operating Costs (2017)   ⇆   Production
Asset
Mine / Facility
Project
Currency
Commodity
Cash Costs  /  C1
Total Cash Costs / C2
 AISC
 All-in Costs  /  C3
Currency
$/t mined $/t milled
Open Pit
Underground
Combined
Open Pit
Underground
Combined
Direct
Processing
Total
AssetMineProjectCurrencyCodeCommodityCash CostsTotal Cash CostsAISCAll-in CostsCurrency MiningOP MinedUG MinedBlended Op/UG MinedOP MilledUG MilledBlended Op/UG MilledDirectProcessingTotal Milled
Botswana
............................ Subscription required
Botswana
............................ Subscription required
Botswana
............................ Subscription required
  • Diamond
Botswana
............................ Subscription required
Botswana
............................ Subscription required
USD
  • Diamond
  • 238 /carat
USD
34.55
Botswana
............................ Subscription required
Botswana
............................ Subscription required
Botswana
............................ Subscription required
USD
  • Gold
  • 933 /oz
Botswana
............................ Subscription required
Production
Assets:
*** Multi - mine Operation
*    Part of an Operation
Costs:
^   Guidance or Forecast
**   Net of By-Product
` or Eq. - Equivalent
Subscription required - Subscription is required.