Asset | Existing Fleet Type | Existing Model | Existing Size | Existing Quantity | Job Title | Name | Profile | Phone | Email |
............................
|
- Drill (blasthole)^
- Excavator^
- Truck (haul)^
|
|
|
|
- Executive General Manager
- Mine Operations Superintendent
- VP Operations
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill jumbo (two boom)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
|
- -
- -
- .................................
 - .................................

|
|
|
- General Manager
- Mining Manager
- Processing Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Drill^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Scissor Lift^
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (underground)^
- Truck (water)^
|
|
- 240 kW
- 114 mm
- 150 kW
- -
- 6.8 m3
- -
- 2 m3
- 3.5 m3
- 50 t
- 42 t
- -
|
|
- Chief Executive Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Director of Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Drill
- Drill
- Explosives Charger
- Loader
- Truck (underground)
|
- Sandvik DD422i DC
- Sandvik DL432i
- Normet Charmec MC 605
- Sandvik Toroâ„¢ LH621i
- Sandvik TH663i
|
|
|
- Acting General Manager
- Managing Director and CEO
- Processing Manager
|
- Jared Murton
- Tony James
- Adit Nugraha
|
|
+61 (8)6183-3200
|
|
............................
|
- Belly-dump truck
- Dragline
- Loader
|
- .................................
 - .................................
 - .................................

|
|
|
- Environmental Engineering Manager
- Operations Manager
- Senior General Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Crane^
- Drill (blasthole)^
- Excavator
- Forklift^
- Loader (FEL)^
- Loader (FEL)^
- Loader (FEL)^
- Tipper truck^
- Truck (haul)^
|
- -
- -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
|
- 110 t
- 250 t
- 60 t
- 140 mm
- -
- 3 t
- -
- 81 t
- 14 t
- 3 t
- 90 t
|
|
- Mine General Manager
- Process Manager
- Procurement Superintendent
- Project Manager - Civil Infrastructure
- Senior Procurement Officer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Jumbo^
- Load-Haul-Dump (LHD)^
- Truck (underground)^
|
|
|
|
- Chief Executive Officer
- Project General Manager / SSE
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Loader
- Rock bolter
- Scoop Tram
- Scoop Tram^
- Telescopic Handler
|
- -
- .................................
 - -
- -
- -
- -
|
|
|
- Logistics Manager
- Safety Director
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Excavator
- Excavator
- Grader
- Loader - Tool Carrier
- Loader (FEL)
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Recovery Methods
- Director Technical Services
- Director, Metallurgy & Processing
- Engineering Manager
- President and CEO
- VP and General Manager
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (blasthole)^
- Excavator^
- Excavator^
- Explosives Charger^
- Grader^
- Loader^
- Personnel Carrier^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
|
|
- General Manager
- Managing Director
- Project Director
- VP Environment & Sustainability
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Engineer
- Director of Processing
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill (blasthole)
- Drill (blasthole)^
- Excavator
- Excavator
- Excavator^
- Grader
- Loader (FEL)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- Caterpillar D9R
- Caterpillar D9GC
- Caterpillar D9R
- Sandvik DP1500i
- Sandvik DP1500i^
- Caterpillar 6015B
- Komatsu PC2000
- Caterpillar 349D^
- Caterpillar 16M
- Caterpillar 777F
- Caterpillar 773E
- Caterpillar 777D
- Caterpillar 777F
|
- -
- -
- -
- -
- -
- 150 t
- 210 t
- -
- -
- -
- -
- 100 t
- -
|
|
- Chief Geologist
- General Manager
- Mine Technical Services Manager
- Operations Manager
- Plant Maintenance Superintendent
- Process Manager
- Supply Chain Superintendent
|
- Bindè Martin ADI
- Herman Prinsloo
- Michée Gnagnon
- Jurie Majoor
- Jean Jacques Kouadio
- Mohamed Traore
- Mireille Tanoh-N’Dri
|
|
+225-22-48-99 00
|
|
............................
|
|
|
|
|
- Consultant - Recovery Methods & Costs
- Operations Manager
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Drill
- Drill
- Jumbo
- Jumbo
- Loader
- Loader
- Truck (underground)
- Truck (underground)
|
- Atlas Copco
- -
- Sandvik
- Sandvik
- Caterpillar
- Caterpillar
- Atlas Copco
- -
|
|
|
- General Manager Operations
- Maintenance Superintendent
- Mine Manager
- Process Manager
- VP, Technical Services
|
- Craig Bradshaw
- Jim Innes
- Bart Jesionek
- Matt McKee-Duff
- Jason Sander
|
|
+61 (0) 8 9088-3822
|
|
............................
|
- Load-Haul-Dump (LHD) - AV ^
- Rockbreaker
|
|
|
|
- Consultant - Infrastructure
- VP Exploration
|
- ..............................
 - ..............................

|
|
............
|
|
|
- Drill
- Drill (blasthole)
- Grader
- Loader
- Load-Haul-Dump (LHD) - EV
- Load-Haul-Dump (LHD) - EV ^
- Shovel
- Truck (haul)
- Truck (underground)
|
- Sandvik DR560
- Sandvik D45KS
- Caterpillar 16M
- Caterpillar 992K/G
- Caterpillar R2900 XE
- Caterpillar R2900 XE^
- Liebherr R9400
- -
- -
|
|
|
- Chief Metallurgist
- General Manager
- Mine Maintenance Superintendent
- Open Pit Mine Manager
- Process Superintendent
- Sr. Manager, Supply Chain
- Sr. Ventilation Engineer
- Technical Services Manager
|
- Evelyn Ofori Atta
- Alex Kofi Annin
- Thomas Alnaa
- Emmanuel Kwaku Kwarteng
- Charles Asare
- Atoapem Frimpong Barimah
- George Alorchie-Apetor
- Emmanuel Kwaku Yeboah
|
|
030-701-1852
|
|
|
- Excavator
- Excavator^
- Loader
- Loader
- Shovel (rope)
- Truck (haul)
- Truck (haul) - AV
- Truck (haul) - AV
|
- Komatsu PC 7000
- Komatsu PC 7000^
- Caterpillar 994F
- LeTourneau L2350
- Komatsu 4100 XPC
- Caterpillar 795F AC
- Komatsu 930E-5
- Komatsu 930E
|
- -
- -
- 18 m3
- 38 m3
- 45 m3
- 313 t
- 290 t
- -
|
|
- Environmental Manager
- General Manager
- Mill Manager
- Mine Technical Services Manager
- Project Manager
- Technical Services Superintendent
|
- Åsa Sjöblom
- Thomas Sundqvist
- Andreas Berggren
- Patrik Gillerstedt
- Johanna Lundin
- Åsa Bergstrand
|
|
+46-970-72-90-00
|
|
|
- Backhoe^
- Bolter^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Explosives Charger^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Shotcreter^
- Telescopic Handler^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (underground)^
|
- -
- -
- -
- -
- -
- -
- Komatsu WA500^
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- -
- -
- -
- -
- 5.6 m3
- 14 t
- -
- -
- -
- -
- -
- -
- -
- 40 t
- -
- 45 t
|
|
|
|
|
+1-(604)-684-2181
|
|
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Dozer (rubber tire)
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Excavator
- Grader
- Loader
- Loader
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- Caterpillar D11T
- Caterpillar D10T
- Caterpillar D9R
- Komatsu D375A
- Caterpillar 844K
- Caterpillar 834K
- Sandvik D55SP
- Epiroc D65
- Hitachi EX3600
- Hitachi EX5600
- Caterpillar 16H/M
- Caterpillar 994 K
- Caterpillar 993K
- Caterpillar 785C
- Caterpillar 793D
- Caterpillar 777D
|
|
|
- General Director
- Maintenance Manager
- Maintenance Planner
- Technical Director
|
- Tony Todd
- Yegor Melnichenko
- Baurzhan Dyussembekov
- Johan Barnard
|
|
+7-727-244-03-53
|
|
............................
|
- Backhoe
- Excavator
- Truck (haul)
|
- -
- -
- .................................

|
|
|
- Chief Metallurgist
- General Manager
- General Manager - Processing
- Health & Safety Superintendent
- Mine Manager
- Process Maintenance Superintendent
- Technology Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
|
|
|
|
- Buyer
- Deputy Mine Manager
- Director of Operations
- Engineering Manager
- General Manager
- Maintenance Manager
- Mining Manager
- Sr. Vice President Engineering & Operations
|
- Heather Eagle
- Phillip Mcgilton
- Glenn Smith
- Tyler Hall
- Craig Dickerson
- John Denny
- Pete Richardson
- Philip K. Saunders
|
|
205-554-6150
|
|
............................
|
- Backhoe^
- Backhoe^
- Crane^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Drill^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader (mini)^
- Loader^
- Tractor trailer^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (stemming)^
- Truck (water)^
|
|
- 11 m3
- 7 m3
- -
- -
- -
- 200 mm
- 140 mm
- -
- -
- -
- 11.5 m3
- -
- -
- -
- -
- 91 t
- 41 t
- 41 t
- -
- -
- -
|
|
- Chief Executive Officer
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Project Controls Manager
- VP Exploration
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Bulldozer^
- Bulldozer^
- Crane^
- Crane^
- Drill^
- Excavator^
- Grader^
- Grader^
- Loader^
- Loader^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (service)^
- Truck (water)^
- Truck (water)^
|
|
- 8 m3
- 180 kW
- 180 kW
- -
- -
- 200 mm
- 6 m3
- 230 kW
- 230 kW
- 8 m3
- 10 m3
- -
- -
- 55 t
- 90 t
- -
- -
- -
- -
|
|
- Chief Executive Officer
- VP, Business Development
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill^
- Loader^
- Shovel (hydraulic)^
- Truck (haul)^
|
|
|
|
- Chief Operating Officer
- President and CEO
- VP Operations
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader^
- Bulldozer^
- Bulldozer^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Rockbreaker^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Costs
- Consultant - Recovery Methods & Costs
- Director of Operations
- Processing Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Director of Operations
- Director of Sustainability and Logistics
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer^
- Drill
- Drill^
- Excavator
- Excavator^
- Grader
- Grader^
- Loader (FEL)
- Loader (FEL)^
- Truck (dump)
- Truck (dump)^
- Truck (water)
- Truck (water)^
|
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- .................................
 - -
- .................................
 - -
|
- 265 kW
- 265 kW
- 172 mm
- 172 mm
- 2.3 m3
- 2.3 m3
- -
- -
- 1.5 m3
- 1.5 m3
- 32 t
- 32 t
- -
- -
|
|
- CEO
- Chief Operating Officer
- GM of Administration & Procurement
- Maintenance Manager
- Mine Manager
- Process Superintendent
- Procurement Officer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Excavator^
- Grader^
- Loader - Tool Carrier^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
|
|
- President and CEO
- VP, Corporate Development
- VP, Health Safety and Environment
|
- ..............................
 - ..............................
 - ..............................

|
 - -

|
............
|
|
............................
|
- Bulldozer
- Bulldozer
- Drill
- Drill
- Excavator
- Excavator
- Grader
- Loader
- Loader
- Loader
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- 15 m3
- 12 m3
- -
- -
- -
- -
- 143 t
- 90 t
- -
|
|
- Technical Services Manager
|
- ..............................

|
|
............
|
|
............................
|
- Crane^
- Deck & Boom Trucks^
- Dozer^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Personnel Carrier^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- -
- -
- .................................
 - -
- -
- .................................
 - -
- -
- -
- -
- .................................

|
- 40 t
- -
- -
- 5 m3
- -
- 12 ft
- 5 m3
- -
- -
- 30 t
- -
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- VP, Project Development
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Excavator
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Environmental Manager
- Maintenance Manager
- Mine Manager
- Process Manager
- Refinery Superintendent
- Senior General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Loader
- Shovel (rope)
- Truck (haul)
|
- Komatsu L1850
- -
- Caterpillar 793
|
|
|
- Engineering Manager
- General Manager Technical Services
- Mining Director
- Plant Manager
- Project Director
- Sr. Production Geologist
- VP Environment & Sustainability
|
- Blaise Potvin
- Alain Brazeau
- Michel Gagné
- Patrick Girard
- Bart Jan Baltus
- Mathieu Doucette
- Grace Barrasso
|
|
+418-287-4700
|
|
|
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Excavator^
- Grader^
- Grader^
- Loader
- Loader^
- Shovel
- Shovel^
- Truck (haul)
- Truck (haul)^
- Truck (water)^
|
- Caterpillar D9^
- Caterpillar D10^
- Caterpillar 834K^
- -
- Caterpillar 24M^
- Caterpillar 16M^
- Caterpillar 994 K
- Caterpillar 992K^
- Caterpillar 6040
- Caterpillar 6040^
- Caterpillar 789D
- Caterpillar 789D^
- -
|
- 436 HP
- 600 HP
- 4.6 m
- -
- 7.3 m
- 4.9 m
- 21 m3
- 11.5 m3
- 22 m3
- 22 m3
- 181 t
- 181 t
- -
|
|
|
|
|
(37410)-546037
|
|
............................
|
- Crane^
- Crane^
- Crane^
- Dozer (crawler)^
- Drill^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Telescopic Handler^
- Telescopic Handler^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
- Truck (water)^
|
- -
- -
- -
- .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - -
- .................................
 - -
|
- 6 t
- 20 t
- 150 t
- -
- -
- 6 m3
- -
- -
- -
- 6.4 m3
- -
- -
- -
- 54 t
- -
- -
- -
|
|
- Chief Executive Officer
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Drill^
- Excavator^
- Loader (FEL)^
- Truck (dump)^
|
- Atlas Copco ROC D7^
- Volvo EC750^
- Caterpillar 986H^
- Volvo A40^
|
|
|
- Chief Operating Officer
- Project Manager
|
- Adrian Costello
- Gidião Mbanze
|
|
+61-8-6381-9050
|
|
............................
|
- Backhoe^
- Continuous Miner^
- Dozer (crawler)^
- Dozer (crawler)^
- Excavator^
- Grader^
- Grader^
- Loader^
- Scraper^
- Scraper^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
- Truck (water)^
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- -
- -
|
|
|
- President and CEO
- Sr. Vice President Operations
- VP Environment & Sustainability
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
- General Manager
- Mine Manager
- Occupational Health & Safety Manager
- Operational Readiness Manager
- Plant Operations Superintendent
- Tailings area Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill jumbo (single boom) - EV ^
- Drill jumbo (two boom) - EV ^
- Loader^
- Loader^
- Truck (haul)^
|
|
|
|
- Chief Development Officer
- Environmental Manager
- General Manager
- Managing Director
- Processing Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor^
- Dozer (crawler)^
- Dozer (crawler)^
- Excavator^
- Grader^
- Loader^
- Loader^
- Scraper^
- Surface miner^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
|
- -
- -
- -
- -
- 14 ft
- 72 inch
- -
- -
- -
- -
- -
- -
- 10,000 gal.
|
|
- Consultant - Costs
- Consultant - Mining & Costs
- President and CEO
- Project Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane
- Drill jumbo (two boom)
|
|
|
|
- Health And Safety Officer
- Project Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter
- Drill
- Drill
- Drill
- Drill jumbo (single boom) - EV
- Explosives Charger
- Loader - AV
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Electrical Superintendent
- Infrastructure and Site Services Manager
- Infrastructure Superintendent
- Maintenance Superintendent
- Mining Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill (blasthole)
- Shovel (hydraulic)
- Shovel (rope) - EV
- Shovel (rope) - EV ^
- Truck (haul)
- Truck (haul) - EV
- Truck (haul) - EV
|
- -
- -
- .................................
 - .................................
 - -
- -
- .................................
 - .................................

|
- 251 mm
- 311 mm
- 29 m3
- 56 m3
- 67 m3
- 370 t
- 300 t
- 370 t
|
|
- Chemical Laboratory Superintendent
- Environmental Manager
- Environmental Superintendent
- Logistics Manager
- Long Term Mine Planning Superintendent
- Maintenance Manager
- Mine Manager
- Mobile Equipment Maintenance Superintendent
- Sr. Operations Manager
- Superintendent Logistics
- Tailings Strategy Manager
- VP, Health Safety and Environment
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Dozer (rubber tire)
- Drill (blasthole) - AV
- Drill (blasthole) - EAV
- Shovel
- Shovel (rope)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - -
- -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- 48 m3
- 35 m3
- 256 tons
- 400 tons
- 320 tons
- 250 tons
- 250 tons
- 400 tons
|
|
- Maintenance Engineering Superintendent
- Metallurgical Superintendent
- Mine Operations Manager
- Plant Maintenance Manager
- Sr. Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dragline
- Drill
- Excavator
- Shovel
- Truck (haul)
- Truck (haul)
|
- -
- -
- -
- -
- -
- .................................
 - .................................

|
|
|
- Director Technical Services
- Health & Safety Manager
- Operations Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Truck (dump)
- Truck (dump)^
- Truck (dump)^
- Truck (haul)
|
- .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- .................................

|
|
|
- Chief Operating Officer
- Consultant - Mining
- Consultant - Recovery Methods
- Crushing Manager
- General Manager Operations
- Logistics Manager
- Managing Director and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Loader (FEL)^
- Loader^
- Truck (dump)^
- Truck (haul)^
|
|
|
|
- CEO
- Consultant - Mining & Costs
- President and CEO
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Concrete sprayer^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Explosives Charger^
- Grader^
- Loader^
- Loader^
- Raise boring rig^
- Trans Mixer^
- Truck (underground)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Exploration Manager
- Managing Director and CEO
- Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Drill
- Drill (blasthole)
- Loader (FEL)
- Shovel (rope) - EV
- Truck (haul)
|
- Epiroc D65
- Caterpillar MD6240
- LeTourneau L2350
- P&H 4100 XPC
- Komatsu 930E
|
|
|
- Chief Operating Officer
- Drilling & Blasting Superintendent
- Logistics Manager
- Maintenance Manager
- Mine General Manager
- Mine Maintenance Superintendent
- Mining Manager
- Planning Manager
- Planning Superintendent
|
- Patricio Mora
- Sergio Barrera Rojas
- Cristian A.
- Alejandro Rojas Basoalto
- Ivo Fadic
- Miguel Angel Gonzalez Gaete
- Alex Calderon
- Sebastian Blanco Retamales
- Emapía Riveras Vergara
|
|
+562-2-798-7000
|
|
............................
|
- Compactor
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Rockbreaker
- Truck
- Truck (haul)
- Truck (haul)^
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Director of Operations
- Mine Manager
- Processing Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Continuous Miner
- Continuous Miner
- Feeder Breaker
|
- .................................
 - .................................
 - .................................
 - -
|
|
|
- Electrical Engineering Manager
- Environmental Superintendent
- General Manager
- Maintenance Manager
- Technical Services Manager
- Ventilation Specialist
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Longwall mining unit - AV
|
|
|
|
- General Manager/SSE
- Health, Safety & Training Superintendent
- Mine Operations Manager
- Technical Services Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Continuous Miner
- Scoop Tram
- Shuttle car
|
|
|
|
- General Manager
- Maintenance Director
- Operations Superintendent
- President and COO
- Safety Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill jumbo (two boom)^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Rock bolter^
- Scissor Lift^
- Telescopic Handler^
- Truck (haul)^
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- -
- -
|
|
|
- Director of Operations
- General Manager
- Geotechnical Superintendent
- Mine Manager
- Mine Superintendent
- Plant Maintenance Planner
- Plant Operations Manager
- Supply Chain Manager
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Backhoe^
- Compactor^
- Crane^
- Crane^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Forklift^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader (mini)^
- Shovel (hydraulic)^
- Tire manipulator^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- 1.4 m3
- -
- 40 t
- 100 t
- 455 kW
- 419 kW
- 171 mm
- 3.8 m3
- 5 t
- 10 t
- 217 kW
- 12 m3
- 5 m3
- 55 kW
- 15 m3
- -
- -
- 144 t
- 41 t
- -
- 35000 l
|
|
- Consultant - Infrastructure
- Consultant - Mining
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Director of Environment & Sustainability
- Site Manager
|
- Calvin Boese
- Bruce Murphy
- Piers Wendlandt
- Kevin Murray
- Cal Craig
- Jim Male
|
|
(907) 452-1941
|
|
|
- Cable bolter^
- Drill (long hole)^
- Jumbo^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Rock bolter^
- Scaler^
- Truck (underground)^
- Truck (underground)^
|
- -
- -
- -
- Caterpillar R1700^
- Caterpillar R2900^
- -
- -
- -
- -
|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- General Manager Operations
- Mining Manager
- Technical Services Manager
|
- Jason Cox
- Brenna J.Y. Scholey
- Evandro Figueiredo Reis Faria
- Celso Lima
- Vitor Ferraz Viana
|
|
+55-(11)-3405-4499
|
|
............................
|
- Drill
- Drill
- Drill
- Loader
- Truck (haul)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Environmental Manager
- Procurement Lead
- Technical & Mine Planning Manager
- Technical Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Recovery Methods & Costs
- General Manager
- Maintenance Planner
- Mining Manager
- Plant Maintenance Planner
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner^
- Rock bolter^
- Scoop Tram^
- Shuttle car - EV ^
|
|
|
|
- Logistics Manager
- Safety Director
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (crawler)^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Loader^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- 400 t
- 150 t
- 150 t
- -
- -
- -
- -
- 250 t
- 250 t
- 250 t
- 250 t
- 250 t
- 100 t
- 250 t
- -
|
|
- Chief Executive Officer
- Exploration Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Dozer^
- Drill (blasthole)^
- Forklift^
- Grader^
- Loader^
- Loader^
- Shovel^
- Shovel^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
|
- 75 t
- 305 HP
- -
- -
- 297 HP
- 14 t
- 270 HP
- 8 t
- 345 HP
- 45000 l
- 50 t
- 7000 gal.
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Director Business Development
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
- -
- -
- -

|
............
|
|
............................
|
- Continuous Miner
- Shuttle car
|
- .................................
 - .................................

|
|
|
- Engineering Manager
- Environmental & Community Superintendent
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Forklift^
- Grader^
- Loader - Tool Carrier^
- Loader (FEL)^
- Loader (FEL)^
- Loader^
- Loader^
- Shovel^
- Tipper truck^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (underground)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- 110 kW
- -
- -
- -
- 285 kW
- -
- -
- -
- -
- 410 kW
- -
|
|
- Engineering Superintendent
- Maintenance Manager
- Mine Planning Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Drill
- Excavator
- Excavator
- Excavator
- Truck (haul)
- Truck (haul)
|
- Sandvik DP1500i
- Caterpillar 374FL
- Caterpillar 395JC
- Caterpillar 349D
- Volvo FMX 84R
- Mercedes Benz Arocs 4151K
|
- -
- 4.2 m3
- 6 m3
- 3.4 m3
- 26 m3
- 24 m3
|
|
- Consultant - Costs
- Consultant - Mining
- Consultant - Recovery Methods
- General Manager - Operations Development
- General Manager Operations
- Infrastructure Superintendent
- Logistics Manager
- Metallurgical Manager
|
- Jason Cox
- Varun Bhundhoo
- Paul Hampton
- Cristovão Teofilo Dos Santos
- Fernando Demuner da Silva
- Roy Petty Durand
- Evelyn Serrano Moromisato
- James Refulio
|
|
+51-(511)-710-5500
|
|
............................
|
- Bulldozer
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Loader
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- 1 m3
- 5.7 m3
- 4.5 m3
- 6.5 m3
- -
- 5 m3
- 6 m3
- 30 t
- 55 t
- 37 t
- -
|
|
- Mine Planning Manager
- Sr. Project Manager
- Supply Chain Director
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill^
- Excavator^
- Grader^
- Loader^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (water)^
|
|
- 264 kW
- 172 mm
- 2.3 m3
- 115 kW
- 1.5 m3
- 32 t
- -
- 9500 l
|
|
- CEO
- Chief Operating Officer
- Consultant - Infrastructure
- Consultant - Mining
- GM of Administration & Procurement
- Procurement Officer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Excavator
- Excavator
- Excavator
- Truck
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 127 mm
- 16.5 m3
- 6.7 m3
- 4.1 m3
- 32 t
- 40 t
- 91 t
|
|
- Health, Safety & Environment Manager
- Senior Buyer
- VP Permitting
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill jumbo (two boom)^
- Grader^
- Loader (FEL)^
- Loader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Raise boring rig^
- Rock bolter^
- Scissor Lift^
- Shotcreter^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- 6.7 t
- 10 t
- -
- -
- -
- -
- -
- -
- -
- -
- 27 t
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Health, Safety & Environment Manager
- VP Permitting
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Bolter
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Jumbo
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader (FEL)
- Scissor Lift
- Scissor Lift
- Truck (boom)
- Truck (dump)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
- Truck (water)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 5.5 m3
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 1
- 1
- 1
- 3
- 1
- 4
- 1
- 2
- 3
- 3
- 5
- 1
- 2
- 2
- 2
- 2
- 2
- 3
- 2
- 3
- 1
- 2
- 3
- 2
- 1
- 2
- 1
- 1
- 4
- 4
- 3
- 1
- 1
- 1
- 2
- 24
- 24
- 1
- -
- 4
- 1
- 2
- 2
|
- Consultant - Mining
- Electrical Superintendent
- Maintenance Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dragline
- Excavator
- Shovel
- Truck (haul)
|
- -
- .................................
 - -
- -
|
|
|
- Mine General Manager
- Mine Planning Superintendent
- Operations Superintendent
- Plant Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
|
|
|
|
- CEO
- Chief Operating Officer
- Consultant - Recovery Methods
- Exploration Manager
- Project Manager
- Technical Services Manager
|
- Graham Arvidson
- Todd Richardson
- Brian McNab
- Tony Standish
- Trevor Smith
- Nigel Dilkes
|
|
+61-8-9321-5594
|
|
............................
|
- Backhoe^
- Bolter^
- Continuous Miner^
- Crane^
- Feeder Breaker^
- Forklift^
- Loader (mini)^
- Loader^
- Scissor Lift^
- Scoop Tram^
- Shuttle car^
- Truck (boom)^
- Truck (haul)^
|
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
|
|
|
- Chief Executive Officer
- President
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill (blasthole)^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (dump)^
|
|
|
|
- Chief Executive Officer
- Environmental & Community Affairs Manager
- President
- Process Manager
- Project Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Compactor^
- Dozer (crawler)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill^
- Explosives Charger^
- Grader^
- Loader - Tool Carrier^
- Loader (FEL)^
- Loader^
- Loader^
- Personnel Carrier^
- Shotcreter^
- Trans Mixer^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (underground)^
- Truck (water)^
|
- -
- Caterpillar D8^
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 20 t
- -
- -
- -
- -
- -
- -
- -
- -
- 17 t
- -
- -
- -
- -
- -
- 40 t
- 50 t
- -
|
|
- Consultant - Mining, Infrastructure & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
- Project Manager
|
- Christopher Bray
- Adam Johnston
- Graham Carman
- Jorge Edgardo Gamarra Urrunaga
|
|
1-604-685-9316
|
|
............................
|
- Backhoe
- Crane
- Crane
- Dozer
- Drill
- Grader
- Loader (FEL)
- Shovel
- Truck (dump)
- Truck (dump)
|
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 28 m3
- 25 t
- 15 t
- -
- -
- -
- -
- 16.5 m3
- 177 t
- -
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Bolter^
- Dozer (crawler)^
- Dozer (crawler)^
- Drill jumbo (two boom)^
- Drill^
- Drill^
- Excavator^
- Explosives Charger^
- Grader^
- Grader^
- Loader^
- Loader^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Shovel (hydraulic)^
- Truck (boom)^
- Truck (boom)^
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - -
- -
- .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- 102 mm
- -
- -
- -
- -
- -
- -
- -
- 17 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 50 t
- -
- -
|
- 1
- 2
- 1
- 1
- 3
- 2
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 5
- 2
- 2
- 1
- 1
- 1
- 1
- 4
- 1
- 2
- 1
- 4
- 1
- 1
|
- Chief Operating Officer
- Consultant - Mining
- Consultant - Recovery Methods
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill^
- Drill^
- Excavator^
- Grader^
- Grader^
- Loader (FEL)^
- Loader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Rock bolter^
- Scissor Lift^
- Shovel (hydraulic)^
- Telescopic Handler^
- Truck (boom)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- -
- -
- -
- 4.2 m blade
- 270 mm
- -
- -
- -
- 152 mm
- 4 m3
- -
- -
- -
- 10 m3
- 6 m3
- 4.5 m3
- -
- -
- -
- 7 m3
- -
- -
- 64 t
- -
- 45 t
- -
|
- 3
- 1
- 3
- 1
- 2
- 2
- 4
- 1
- 1
- 1
- 3
- 3
- 2
- 1
- 4
- 1
- 3
- 5
- 3
- 2
- 3
- 3
- 12
- 3
- 8
- 2
|
- Maintenance Planner
- Operations Manager
- Supply Chain Superintendent
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Loader
- Shovel - EV
- Truck (haul) - AV
|
- -
- -
- .................................

|
|
|
- Maintenance Superintendent
- Mine Manager
- Mine Operations Superintendent
- Processing Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Continuous Miner^
|
|
|
|
- General Manager
- General Manager Operations
- Managing Director
|
- ..............................
 - ..............................
 - ..............................

|
- -
 
|
............
|
|
............................
|
|
- .................................

|
|
|
- Chief Operating Officer
- Director of Mine Maintenance
- Surface Facilities Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Jumbo
- Jumbo
- Loader - AV
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
|
|
|
- Chief Executive Officer
- Chief Operating Officer
- Commercial Manager
- General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill jumbo (single boom)
- Load-Haul-Dump (LHD)
- Scraper
- Truck (dump)
|
|
|
|
- Buyer
- Chief Safety Officer
- Consultant - Costs
- General Manager
- Health, Safety & Environment Manager
- Principal author (consultant)
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Bulldozer^
- Compactor^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Explosives Charger^
- Grader^
- Loader (FEL)^
- Rockbreaker^
- Truck (boom)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- -
- -
|
- -
- -
- 20 t
- -
- -
- -
- -
- -
- -
- -
- -
- 15 m3
- 6000 l
- -
- -
- 15000 l
|
|
- Electrical Superintendent
- Environmental Manager
- Process Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Truck (dump)
- Truck (haul)
|
|
|
|
- Alternate General Manager
- General Manager
- General Manager Operations Planning
- Process Superintendent
- Production Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
- ..............................

|
|
............
|
|
|
- Shovel
- Shovel
- Shovel
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- P&H 2800 XPC
- Hitachi EX5500
- Hitachi EX5600
- Hitachi EX3600
- Komatsu 830E-AC
- Caterpillar 785
- Komatsu 830E D/C
|
|
|
- Chief Metallurgist
- Health, Safety & Training Manager
- Process Maintenance Superintendent
- Technical Services Superintendent
- VP and General Manager
|
- Rodrigo Andrade
- Deanna Hall
- Mark Wilson
- Trent Sweeney
- Joseph Kemp
|
|
(775)-237-5854
|
|
............................
|
- Surface miner
- Truck (water)
- Truck (water)
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Drill
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
- ..............................

|
|
|
|
............................
|
- Dozer (crawler) - EV ^
- Drill (long hole)^
- Excavator^
- Grader - EV ^
- Loader (FEL)^
- Loader^
- Truck (dump)^
- Truck (haul)^
- Truck (water)^
|
- -
- .................................
 - -
- -
- -
- -
- -
- .................................
 - -
|
- 363 kW
- 140 mm
- 6.5 m3
- 178 kW
- 5.7 m3
- 5.7 m3
- 20 t
- 55 t
- -
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
- Supply Chain Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Alternate General Manager
- General Manager Operations
- Metallurgical Superintendent
- Mine Production Superintendent
- Mining / Technical Services Manager
- Mobile Maintenance Superintendent
- Sr. Superintendent of Mine Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Explosives Charger^
- Grader^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Raise boring rig^
- Scaler^
- Scissor Lift^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (underground)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 25 t
- 89 mm
- 22 t
- 4 t
- 10 t
- 15 t
- -
- 30 m
- 8.5 m
- 3 t
- 4000 l
- 4 t
- 45 t
|
|
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Mine Planning Manager
- VP Exploration
- VP, Business Development
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Drilling Manager
- Logistics Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator^
- Loader^
- Truck (dump)^
|
- .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Engineering Manager
- Exploration Manager
- Project and Corporate Development Manager
- Sustainability & Environmental Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Shovel (rope) - EV
- Truck (haul) - EAV
- Truck (haul) - EV
- Truck (haul) - EV
- Truck (haul) - EV
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole) - EV ^
- Drill (blasthole)^
- Grader^
- Loader (FEL)^
- Shovel (hydraulic) - EV ^
- Shovel (hydraulic)^
- Truck (haul)^
|
- -
- -
- -
- -
- -
- -
- -
- -
- .................................

|
- 22 m3
- 25 m3
- 251 mm
- 140 mm
- -
- 19 m3
- 42 m3
- 42 m3
- 300 t
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Director of Environment & Sustainability
- Engineering Manager
- President and CEO
- Sr. Vice President Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator^
- Excavator^
- Excavator^
- Loader (FEL)^
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Executive Officer
- Commercial Manager
- Environmental & Community Superintendent
- General Manager Operations
- Maintenance Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Operating Officer
- Consultant - Mining
- Head of Processing
- Principal author (consultant)
- Technical & Mine Planning Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Truck (dump)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager - Processing
- Managing Director and CEO
- Technical Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Loader
- Loader
- Loader
- Truck (dump)
- Truck (dump)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- 120 t
- 120 t
- 150 t
- -
- -
- -
- -
- -
- -
- -
- 40 t
- -
- 100 t
- -
- 100 t
|
|
- Chief Operating Officer
- Mine Manager
- Plant Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill (blasthole)^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 325 HP
- 325 HP
- 472 HP
- 238 HP
- 6 m3
- 40 t
|
|
- Chief Geologist
- Consultant - Mining
- Consultant - Recovery Methods
- President and CEO
- VP Environment & Sustainability
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer
- Drill (blasthole)
- Drill (blasthole)
- Grader
- Shovel
- Shovel
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (hydraulic)
- Truck (dump)
- Truck (dump)
|
|
- 355 HP
- 300 HP
- 160 mm
- 150 mm
- 140 HP
- 5 m3
- 3.6 m3
- 2.9 m3
- 4.5 m3
- 5 m3
- 60 t
- 31 t
|
|
- General Manager Operations
- Sr. Mine Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Loader
- Loader
- Loader
- Surface miner
- Surface miner
- Surface miner
- Truck (dump)
- Truck (dump)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................

|
- 410 HP
- 950 HP
- -
- 160 mm
- 160 mm
- 1.57 m3
- 2.2 m3
- 4.5 m3
- 5.5 m3
- 9.5 m3
- 8.8 m3
- -
- 1.5 m3
- 6.5 m3
- 6.4 m3
- 6.4 m3
- 4000 mm
- 4000 mm
- -
- -
- -
- 28000 l
|
- 14
- 1
- 1
- 3
- 4
- 1
- 1
- 1
- 4
- 2
- 2
- 4
- 1
- 2
- 2
- 1
- 3
- 1
- 9
- 22
- 20
- 6
|
- General Manager Operations
|
- ..............................

|
|
............
|
|
|
- Alimak climber^
- ANFO Loader^
- Deck & Boom Trucks^
- Drill jumbo (single boom)^
- Drill jumbo (two boom)^
- Drill^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Rock bolter^
- Scissor Lift^
- Shotcreter^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
|
|
- -
- -
- -
- -
- -
- 4 inch
- -
- 8 cu. yd
- 6 cu. yd
- 4 cu. yd
- 2.5 cu. yd
- -
- -
- -
- -
- -
- -
- 50 t
- 30 t
|
|
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- General Manager Operations
|
- Matt O'Neill
- Andrew MacKenzie
- Andy Holloway
- Thomas Lethbridge
|
|
807-735-2077
|
|
............................
|
- ANFO Loader^
- Crane^
- Dozer (rubber tire)^
- Dozer^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Drill (blasthole)
- Drill (blasthole)
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Loader
- Loader
- Loader
- Loader
- Loader
- Shovel (rope)
- Shovel (rope)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 800 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 6
- 12
- 14
- 4
- 1
- 3
- 5
- 1
- 2
- 3
- 2
- 3
- 2
- 1
- 4
- 2
- 1
- 1
- 5
- 13
- 5
- 1
- 5
- 1
- 3
- 2
- 5
- 1
- 135
- 36
- 10
|
- Commercial Manager
- Long Term Mine Planning Superintendent
- Plant Manager
- Process Manager
- Process Operations Manager
- Procurement Manager
- Project Director
- Safety Superintendent
- Senior HSE Manager
- Sr. Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter^
- Compactor^
- Dozer (crawler)^
- Drill (blasthole)^
- Grader^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
|
- -
- -
- -
- 127 mm
- -
- 6.4 m3
- 7 m3
- -
- 10 m3
|
|
- Chief Operating Officer
- Managing Director
|
- ..............................
 - ..............................

|
- -

|
............
|
|
............................
|
|
- .................................
 - .................................
 - .................................

|
|
|
- Environmental & Community Manager
- General Manager/SSE
- Maintenance Superintendent
- Managing Director and CEO
- Process Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor^
- Dozer^
- Drill (blasthole)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- .................................
 - -
|
- 10 t
- -
- 89 mm
- -
- -
- -
- 2.5 t
- -
- -
- 60 t
- -
- -
- -
|
|
- CEO
- Chief Development Officer
- Consultant - Mining, Infrastructure & Costs
- Consultant - Recovery Methods
- General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dragline
- Dragline
- Shovel
- Shovel
- Shovel
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager
- Maintenance Manager
- Manager - Coal Preparation
- Safety Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Crane^
- Dozer (crawler)^
- Dozer^
- Drill (blasthole)^
- Drill^
- Drill^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader (mini)^
- Telescopic Handler^
- Truck (boom)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
- Truck^
- Truck^
|
- -
- -
- .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 1.1 cu. yd
- 50 tons
- 436 HP
- -
- -
- -
- -
- 2 cu. yd
- 2.5 tons
- 16 ft
- 14 cu. yd
- 7 cu. yd
- 4 tons
- 10 tons
- 100 tons
- -
- 20,000 gal.
- 36 tons
- -
|
|
- Chief Geologist
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- General Manager
- President and CEO
- VP, Engineering & Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck (haul)
- Truck (haul)
|
|
- -
- -
- 6 cu. yd
- 4 cu. yd
- 3 cu. yd
- 1.5 cu. yd
- 13 t
- 26 t
|
|
- Chief Geologist
- VP Exploration
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Operating Officer
- General Manager
- Sr. Operations Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Excavator^
- Truck (haul)^
|
|
|
|
- Commercial Manager
- Deputy Mine Manager
- General Manager - Mine Projects
- General Manager Mining
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Deck & Boom Trucks^
- Deck & Boom Trucks^
- Dozer (crawler)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Loader^
- Tire manipulator^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (stemming)^
- Truck (water)^
|
- .................................
 - -
- -
- .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- .................................

|
- 40 t
- -
- 200 t
- -
- -
- 10 m3
- 4 m3
- -
- -
- 11 m3
- 4 m3
- -
- -
- 90 t
- -
- 15 t
- -
|
|
- CEO
- Chief Geologist
- Consultant - Infrastructure
- Consultant - Mining
- Executive VP
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill (long hole)
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Forklift
- Grader
- Loader (FEL)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scissor Lift
- Trans Mixer
- Truck (boom)
- Truck (fuel / lube)
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- -
- -
- -
- -
- -
- 8 cu. yd
- 6 cu. yd
- 3.5 cu. yd
- 2 cu. yd
- 1.5 cu. yd
- -
- -
- -
- -
- 35 t
- 45 t
- 50 t
|
|
- Director of Environment & Sustainability
- Mill Manager
- Mining Superintendent
- Sr. Mine Engineer
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Loader (FEL)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - -
- -
- -
|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- President and CEO
|
- ..............................
 - ..............................
 - ..............................

|
  - -
|
............
|
|
............................
|
- Backhoe loader^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Excavator^
- Explosives Charger^
- Grader^
- Jumbo - EV
- Jumbo^
- Loader^
- Loader^
- Loader^
- Truck (haul)^
- Truck (underground)^
|
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
|
- -
- -
- -
- 120 t
- -
- -
- -
- -
- 7 m3
- 5 m3
- -
- 90 t
- 60 t
|
|
- Chief Operating Officer
- General Manager
- Health & Safety Manager
- Managing Director and CEO
- Mining Manager
- Processing Manager
- Procurement Manager
- Underground Mine Manager
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill (blasthole)^
- Excavator^
- Grader^
- Truck (haul)^
- Truck (water)^
|
|
|
|
- Head of HSE & Quality
- Sr. Project Engineer
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dragline
- Drill
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Truck
- Truck (fuel / lube)
- Truck (haul)
- Truck (water)
|
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- .................................
 - -
- -
- -
|
|
|
- Environmental Superintendent
- General Manager
- Health & Safety Manager
- Maintenance Superintendent
- Mine Planning Superintendent
- Mining Manager
- Project Superintendent
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Load-Haul-Dump (LHD)^
- Truck (dump)^
|
|
|
|
|
- ..............................

|
|
|
|
............................
|
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole) - EV ^
- Drill (blasthole)^
- Drill^
- Excavator^
- Excavator^
- Loader (FEL)^
- Shovel (hydraulic)^
- Shovel (rope) - EV ^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
|
- 450 kW
- 325 kW
- 370 kW
- 305 mm
- 228 mm
- 144 mm
- 3.8 m3
- 3 m3
- 22 m3
- 22 m3
- 34 m3
- 231 t
- 40 t
- 170,000 l
|
|
- CEO
- Consultant - Costs
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Dozer (rubber tire)^
- Drill^
- Grader^
- Loader (FEL)^
- Truck (dump)^
|
- -
- -
- .................................
 - -
- .................................
 - -
|
|
|
|
|
|
............
|
|
............................
|
|
|
|
|
- CEO
- Chief Development Officer
|
- ..............................
 - ..............................

|
|
............
|
|
|
- Drill
- Drill jumbo (single boom)
- Drill jumbo (single boom)^
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Explosives Charger^
- Loader - Tool Carrier
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)^
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)^
|
- -
- -
- -
- -
- -
- -
- -
- Caterpillar R2900
- Caterpillar R1700
- -
- -
- Caterpillar AD60
- Caterpillar AD63
- -
- Caterpillar AD60
- Caterpillar AD60^
|
- -
- -
- -
- -
- -
- -
- -
- 17 t
- 14 t
- 3 t
- 3 t
- 60 t
- 63 t
- 55 t
- 60 t
- 60 t
|
|
- Chief Operating Officer
- Environmental Manager
- General Manager
- Mine General Manager
- Mining Manager
- Processing Manager
|
- Aaron Rankine
- Alex Ruschmann
- Ben McAllister
- Stasi Capsanis
- Wayne Gough
- Mark Atta-Danso
|
|
+61-8-9278-6500
|
|
............................
|
- Locomotive - EV ^
- Truck (dump)^
|
|
|
|
- Chief Operating Officer
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- President and CEO
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Surface miner
- Truck (water)
- Truck (water)
- Truck (water)
|
|
|
|
- General Manager
- General Manager Operations
- Managing Director
|
- ..............................
 - ..............................
 - ..............................

|
- -
- -

|
............
|
|
............................
|
- Bulldozer^
- Crane^
- Deck & Boom Trucks^
- Drill (blasthole)^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Hammer crusher^
- Jumbo^
- Loader^
- Loader^
- Loader^
- Loader^
- Personnel Carrier^
- Telescopic Handler^
- Tractor trailer^
- Truck (dump)^
- Truck (dump)^
- Truck (service)^
- Truck (water)^
- Truck^
|
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - -
- .................................
 - .................................

|
- -
- -
- -
- 152 mm
- -
- 300 t
- 150 t
- 190 t
- 90 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 94 t
- 64 t
- -
- -
- -
|
- 14
- 2
- 2
- 24
- 7
- 5
- 3
- 2
- 3
- 4
- 2
- 5
- 1
- 1
- 2
- 10
- 11
- 2
- 1
- 70
- 10
- 2
- 3
- 4
|
- Consultant - Mining, Infrastructure & Costs
- Consultant - Recovery Methods
- Executive VP
- Metallurgical Manager
- Mine Planning Manager
- Mine Production Manager
- Plant Operations Manager
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Dozer
- Loader
- Truck (dump)
- Truck (dump)
|
|
- 428 HP
- -
- 330 HP
- 400 HP
- 350 HP
|
|
- Chief Operating Officer
- Director, Projects
- Environmental Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Cable bolter
- Drill
- Drill
- Grader
- Jumbo
- Load-Haul-Dump (LHD)
- Scissor Lift
- Shotcreter
- Telescopic Handler
- Trans Mixer
- Truck (boom)
- Truck (haul)
- Truck (underground)
|
- -
- -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- -
- .................................

|
|
|
- General Superintendent
- Safety Manager
- Vice President, Maintenance
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Shuttle car
|
- .................................
 - -
|
|
|
- Development Manager
- Environmental Manager
- Maintenance Manager
- Mine Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator^
- Excavator^
- Truck (dump)^
- Truck (dump)^
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Executive Director & CEO
- Health, Safety & Environment Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Loader
- Loader
- Truck (haul)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
|
- -
- -
- 4.633 m blade
- 150 mm
- 229 mm
- -
- -
- -
- 4.677 m blade
- 4.267 m blade
- -
- -
- 65 t
- 56781 l
- 30283 l
|
|
- Environmental Manager
- Fleet Maintenance Manager
- Mining Manager
- Process Plant Superintendent
- Processing Manager
- Underground Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Continuous Miner^
- Continuous Miner^
- Truck (water)
|
|
|
|
- General Manager
- General Manager Operations
|
- ..............................
 - ..............................

|
 - -
|
............
|
|
............................
|
- Bolter
- Drill
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)^
- Drill jumbo (single boom)
- Drill^
- Loader (FEL)
- Loader^
- Load-Haul-Dump (LHD)
- Rockbreaker
- Scoop Tram
- Shotcreter
- Shotcreter^
- Telescopic Handler
- Trans Mixer^
- Truck (dump)^
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 36 t
- 31 t
|
|
- Health, Safety & Environment Manager
- Mechanical Superintendent
- Mining Manager
- Operations Manager
- Process Plant Manager
- Superintendent Logistics
- UG Maintenance Planning Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Bulldozer
- Excavator
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Truck (dump)
- Truck (dump)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................

|
|
|
- Chemical Laboratory Superintendent
- Senior Maintenance Planner
- Sr. Maintenance Superintendent
- Supply Chain Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Chemical Laboratory Manager
- Procurement Superintendent
- Senior Maintenance Planner
- Sr. Maintenance Superintendent
- Supply Chain Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer (crawler)^
- Grader^
- Loader (FEL)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - -
- -
|
|
|
- CEO
- Chief Operating Officer
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Bolter
- Drill
- Drill
- Drill (long hole)
- Explosives Charger
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Scaler
- Scaler
- Shotcreter
- Shotcreter
- Trans Mixer
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Environmental Manager
- Executive VP and Chief Development Officer
- General Manager
- Plant Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Concrete sprayer^
- Crane^
- Crane^
- Forklift^
- Jumbo^
- Loader (mini)^
- Loader^
- Loader^
- Loader^
- Personnel Carrier^
- Scissor Lift^
- Shotcreter^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
|
- -
- -
- -
- 20 t
- 55 t
- 3 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
|
- Chief Executive Officer
- Chief Operating Officer
- Principal author (consultant)
- Project Development Manager
- Safety Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Deputy Operations Manager
- Logistics Manager
- Mining Manager
- Occupational Health Manager
- Project Manager / Mining Manager
- Technical Manager - Process
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Compactor^
- Dozer (crawler)^
- Drill (blasthole)^
- Excavator^
- Grader^
- Loader - Tool Carrier^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
|
- -
- -
- -
- 165 mm
- 6.7 m3
- -
- -
- 11.5 m3
- 22 m3
- 20 t
- -
- 144 t
- 64 t
- -
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Director of Environment & Sustainability
- Environmental Manager
- President and COO
- Sr. Vice President Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Scoop Tram
- Truck (underground)
|
- .................................
 - .................................

|
|
|
- Head of Mine Operations
- Mine Manager
- Mine Operations Manager
- Mining Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- CEO
- Operations Support Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dragline
- Dragline
- Dragline
- Dragline
- Shovel
- Shovel
- Shovel
- Shovel
- Shovel
- Shovel
- Shovel
- Shovel
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 165 cu. yd
- 167 cu. yd
- 168 cu. yd
- 169 cu. yd
- 50 cu. yd
- 65 cu. yd
- 36 cu. yd
- 84 cu. yd
- 53 cu. yd
- 84 cu. yd
- 68 cu. yd
- 53 cu. yd
- 84 cu. yd
- 240 tons
- 255 tons
- 255 tons
- 255 tons
- 320 tons
- 360 tons
- 400 tons
|
- 3
- 1
- 1
- 1
- 3
- 2
- 4
- 3
- 1
- 1
- 3
- 3
- 1
- 37
- 14
- 32
- 1
- 17
- 16
- 2
|
- Chief Operating Officer
- Dragline Maintenance Planner
- Maintenance Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer
- Drill^
- Excavator
- Excavator
- Excavator
- Loader
- Truck (dump)
- Truck (dump)
- Truck (dump)^
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- .................................

|
- -
- -
- -
- -
- -
- -
- -
- 150 t
- 50 t
- 150 t
- 200 t
- -
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Personnel Carrier^
- Shovel (hydraulic)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- 475 HP
- 570 HP
- 215.9 mm
- -
- 3 m3
- 16 ft
- 10.7 m3
- -
- 9 m3
- -
- 90 t
- -
- 45000 l
|
|
- CEO
- Consultant - Mining
- VP, Processing & Metallurgy
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe
- Cable reel truck^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Drill - EV ^
- Drill^
- Drill^
- Excavator
- Excavator
- Excavator^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Grader^
- Loader (FEL)^
- Loader^
- Loader^
- Scissor Lift^
- Shovel - EV ^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)
- Truck (water)^
|
- .................................
 - -
- -
- .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - -
- .................................
 - -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- .................................
 - -
- .................................
 - .................................

|
- 400 t
- 10 t
- 30 t
- 450 kW
- 325 kW
- 250 mm
- 140 mm
- 200 mm
- 34 m3
- -
- 4.5 m3
- 3 m3
- 22 m3
- 5 t
- 5.5 m blade
- 4.9 m blade
- -
- 12 m3
- 7 m3
- -
- 34 m3
- -
- -
- 240 t
- 40 t
- 140 t
- 240 t
- -
- -
- -
|
- 2
- 1
- 1
- 4
- 4
- 3
- 2
- 5
- 1
- 1
- 2
- 2
- 3
- 1
- 4
- 1
- -
- 1
- 2
- 1
- 3
- 2
- 3
- 5
- 2
- 3
- 28
- 4
- 1
- 3
|
- Consultant - Costs
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- General Manager Operations
- Metallurgical Manager
- Sr. Project Engineer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dragline
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager
- Maintenance Manager
- Maintenance Superintendent
- Mine Scheduling Superintendent
- Regional General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- -
- .................................
 - .................................

|
|
|
- General Manager Operations
- Logistics Manager
- Maintenance Superintendent
- Managing Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Loader (air)
- Load-Haul-Dump (LHD)
- Locomotive - EV
- Rockbreaker
- Truck (dump)
|
|
|
|
- Mine General Manager
- Mine Planning Manager
- Procurement Specialist
- Underground Mine Manager
- Ventilation Engineer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill^
- Grader^
- Loader (FEL)^
- Truck (dump)^
- Truck (water)^
|
|
- 580 HP
- -
- 297 HP
- 16 cu. yd
- 100 tons
- 12000 gal.
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)^
- Dozer (rubber tire)
- Dozer (rubber tire)^
- Drill (blasthole)
- Drill (blasthole) - EV
- Drill (blasthole)^
- Excavator
- Excavator
- Excavator
- Grader
- Grader^
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader - Tool Carrier
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)^
- Shovel - EV
- Truck
- Truck
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (haul)^
- Truck (service)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 240 t
- 240 t
- 240 t
- 28 m3
- 240 t
- -
- -
- 240 t
- 90 t
- 240 t
- -
- -
|
- 1
- 4
- 2
- 2
- 1
- 4
- 2
- 3
- 1
- 2
- 4
- 4
- 2
- 1
- 1
- 2
- 2
- 1
- 1
- 2
- 2
- 2
- 1
- 4
- 2
- 14
- 1
- 22
- 3
- 12
- 5
- 1
|
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Deputy Mine Manager
- Director, Projects
- General Manager Operations
- Mine Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Continuous Miner
- Feeder Breaker^
- Personnel Carrier^
- Shearer^
- Shuttle car^
|
|
|
|
- Deputy Mine Manager
- Director of Operations
- Engineering Director
- General Manager
- Maintenance Manager
- Mining Manager
- Sr. Vice President Engineering & Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Chief Operating Officer
- Procurement Manager
- Safety Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Excavator^
- Excavator^
- Truck (dump)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Executive Officer
- Engineering Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill (long hole)
- Drill (long hole)^
- Drill^
- Loader
- Loader^
- Load-Haul-Dump (LHD)
|
|
|
|
- Chief Executive Officer
- Chief Operating Officer
- Consultant - Mining & Costs
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Truck (haul)
|
- .................................
 - .................................
 - -
|
|
|
- Deputy Process Manager
- Maintenance Manager
- Production Planning Manager
- Sr. Mine Engineer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Drill
- Excavator
- Excavator
- Loader
- Rockbreaker
- Truck (dump)
- Truck (fuel / lube)
- Truck (water)
|
|
- -
- 100 mm
- 3 m3
- 2 m3
- 1.5 m3
- -
- 35 t
- 20,000 l
- 20,000 l
|
|
|
- ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Exploration Manager
- Managing Director
- Project Services Manager
- Regional General Manager
- Technical Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Bulldozer
- Bulldozer
- Dozer (rubber tire)
- Dozer (rubber tire)
- Drill
- Drill
- Drill
- Drill - AV ^
- Drill - AV ^
- Grader
- Grader
- Loader
- Loader
- Shovel
- Shovel (hydraulic) - EV
- Shovel (rope) - EV
- Truck (dump) - AV
- Truck (haul) - AV
- Truck (haul) - AV
- Truck (water)
|
- Caterpillar D11
- Caterpillar D10T
- Caterpillar 854G
- Caterpillar 834H
- Atlas Copco DML
- Atlas Copco PV235
- Epiroc D65
- Epiroc PV-231^
- Epiroc SmartROC D65^
- Caterpillar 24H/M
- Caterpillar 16H
- Caterpillar 994
- Caterpillar 966H
- Caterpillar 330
- Hitachi EX3600
- Bucyrus-Erie 495
- Caterpillar 785C
- Caterpillar 793F
- Caterpillar 793D
- Caterpillar 785
|
|
|
- Environmental Superintendent
- General Manager
- Maintenance Superintendent
- Managing Director
- Metallurgy Superintendent
- Mining Manager
- Process Operations Manager
|
- Tessa Purcell
- Chris Dark
- Damien Martin
- Mia Gous
- Nengah Sandi
- Tim White
- Jen Stewart
|
|
+61-8-9883-3232
|
|
............................
|
- Dozer
- Drill
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Scraper
- Truck (haul)
- Truck (service)
- Truck (water)
|
- -
- .................................
 - -
- .................................
 - -
- -
- -
- -
- -
- -
|
|
|
- CHPP Manager
- Commercial Manager
- Deputy General Manager
- Environmental Superintendent
- Maintenance Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Alimak climber^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Truck (underground)^
|
- -
- .................................
 - .................................
 - -
|
|
|
- Environmental Manager
- General Manager
- Health And Safety Officer
- Ventilation Officer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill
- Drill
- Jumbo
- Jumbo
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck
- Truck (dump)
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 10 ft
- 4 ft
- 4 ft
- 16 ft
- 4 ft
- 2 cu. yd
- 3 cu. yd
- 6 cu. yd
- 1.5 cu. yd
- 3.5 cu. yd
- -
- 30 t
- 30 t
- 20 t
- 15 t
- 10 t
|
|
- Chief Operating Officer
- Mine General Manager
- Process Plant Manager
- VP Operations & Country Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Loader - EAV
- Truck (haul)
- Truck (underground)
- Truck (underground) - AV
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager
- Maintenance Manager
- Mine Manager
- Mine Planning Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Bolter
- Bolter
- Crane
- Drill
- Drill
- Drill jumbo (single boom)
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Grader
- Jumbo
- Personnel Carrier
- Scissor Lift
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (haul)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
- -
- 12 ft
- 12 ft
- -
- 16 ft
- 16 ft
- -
- -
- 14 ft
- -
- 12 ft
- -
- -
- 7.5 cu. yd
- 7.5 cu. yd
- 9.8 cu. yd
- 6.1 cu. yd
- 8 cu. yd
- 6.1 cu. yd
- 14 m3
- 14 m3
- 14 m3
- 30 tons
- -
- -
|
- 1
- 1
- 1
- 1
- 2
- 3
- 2
- 1
- 2
- 1
- 1
- 2
- 1
- 2
- 2
- 2
- 1
- 1
- 2
- 20
- 2
- 2
- -
- 1
- 1
|
- Chemical Laboratory Manager
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Maintenance Manager
- Maintenance Superintendent
- Project Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill
- Scissor Lift
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Engineer
- Chief Executive Officer
- Mine Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
 - -

|
5116449190
|
|
............................
|
- Bulldozer^
- Compactor^
- Crane^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Personnel Carrier^
- Tractor trailer^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- -
- -
|
- -
- -
- 40 t
- -
- 4.5 m3
- -
- -
- -
- -
- -
- 15000 l
- 26 t
- -
- 25000 l
|
|
- Country Manager
- Environmental Manager
- Maintenance Manager
- Plant Maintenance Superintendent
- Project Manager
- Sr. Mine Engineer
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Dozer (rubber tire)
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Loader
- Loader
- Loader
- Loader
- Loader
- Tipper truck
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- 200 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 90 t
- 90 t
- 90 t
- 90 t
- -
|
- 4
- 1
- 2
- 1
- 1
- 10
- 3
- 2
- 2
- 2
- 2
- 1
- 2
- 2
- 1
- 1
- 1
- 6
- 2
- 10
- 3
- 27
- 1
|
- General Manager
- General Manager Operations
- Mine Planning Superintendent
- Mine Technical Services Manager
- Mining Manager
- Operations Manager
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................

|
|
|
- Deputy General Manager
- Deputy Process Manager
- Health, Safety & Environment Manager
- Mechanical Maintenance Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe & Rock Breaker^
- Dozer (crawler)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
- Truck^
|
- -
- -
- -
- -
- .................................
 - -
- -
- .................................
 - -
- .................................
 - -
- -
- -
|
- -
- 325 HP
- 5 inch
- -
- 4.4 m3
- 2.1 m3
- 12 ft
- 4.4 m3
- -
- 40 t
- -
- -
- -
|
|
- Chief Operating Officer
- Consultant - Recovery Methods & Costs
- Director of Operations
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cassette Truck
- Grader
- Jumbo
- Load-Haul-Dump (LHD)
- Scissor Lift
- Truck (boom)
- Truck (underground)
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager
- Mine Superintendent
- Technical Services Manager
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Excavator
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- -
- -
- .................................
 - -
- -
- -
|
|
|
- Consultant - Mining
- Environment & Rehabilitation Manager
- General Manager Health & Safety
- Head of Mine Operations
- Head of Projects
- Principal author (consultant)
- Production Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter^
- Dozer^
- Drill^
- Explosives Charger^
- Grader^
- Jumbo^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Rock bolter^
- Scissor Lift^
- Shotcreter^
- Tractor trailer^
- Trans Mixer^
- Truck (service)^
- Truck (underground)^
- Truck^
|
|
- -
- -
- 114 mm
- -
- -
- -
- 15 t
- 14 t
- -
- -
- -
- -
- -
- -
- -
- -
- 63 t
- 145 t
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
- Site Manager
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Loader (FEL)
- Shovel
- Truck (haul)
|
|
|
|
- General Manager
- Maintenance & Services Manager
- Maintenance Planner
- Maintenance Superintendent
- Mine Manager
- Processing Superintendent
- Safety Superintendent
- Sr. Mine Engineer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Grader
- Truck (haul)
- Truck (haul)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
- -
- 115 mm
- 5.4 m3
- 6.4 m3
- 12 m3
- -
- 50 t
- 100 t
|
|
- Maintenance Manager
- Principal author (consultant)
- Procurement Officer
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Bulldozer^
- Compactor^
- Drill^
- Grader^
- Loader (FEL)^
- Loader^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (water)^
|
|
- 7 m3
- 2 m3
- -
- -
- -
- 4.9 m blade
- 13 m3
- 7 m3
- 15 m3
- 95 t
- 50 m3
|
|
- Consultant - Infrastructure
- Consultant - Recovery Methods & Costs
- Environmental Manager
- Mining Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Loader (FEL)
|
- .................................
 - .................................
 - .................................

|
|
|
- Chemical Laboratory Superintendent
- Senior Maintenance Planner
- Sr. Maintenance Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill^
- Drill^
- Explosives Charger^
- Loader^
- Loader^
- Scoop Tram^
- Truck (service)^
- Truck (underground)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Recovery Methods
- Director of Exploration
- President & General Manager
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (rubber tire)^
- Dozer^
- Drill^
- Drill^
- Excavator^
- Grader^
- Loader^
- Shovel^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- General Manager
- Health, Safety & Environment Manager
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable reel truck
- Compactor
- Dozer (crawler)
- Drill
- Drill
- Excavator
- Grader
- Loader (FEL)
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Electrical Superintendent
- Fleet Management Superintendent
- General Director
- Health & Safety Superintendent
- Mine Engineering Superintendent
- Mine Technical Services Manager
- Mining Director
- Plant Maintenance Planning Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Forklift^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Truck (boom)^
- Truck (underground)^
|
|
|
|
- Chief Geologist
- Health, Safety & Training Manager
- Mine Manager
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Loader
- Rockbreaker
- Scoop Tram
|
|
|
|
- Exploration Manager
- General Manager
- President and CEO
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer^
- Dozer^
- Dozer^
- Drill^
- Forklift^
- Grader^
- Loader^
- Loader^
- Loader^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - -
|
- 1.1 cu. yd
- -
- -
- -
- -
- 2.5 tons
- -
- -
- -
- -
- 5 tons
- -
- -
- -
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Engineering & Projects Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Environmental Manager
- Executive General Manager
- Mine Operations Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer (crawler)
- Excavator
- Grader
- Scraper
- Truck (haul)
- Truck (water)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Executive Officer
- Engineering Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- CEO
- Drilling & Blasting Superintendent
- Fixed Plant Operations Manager
- General Manager Operations
- Managing Director
- Mine General Manager
- Mine Operations Manager
- Mineral Resource Manager
- Mobile Equipment Maintenance Manager
- Production Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Truck (haul)^
|
|
|
|
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator^
- Excavator^
- Truck (haul)
- Truck (haul)^
|
- .................................
 - .................................
 - -
- -
|
|
|
- Chief Development Officer
- General Manager Exploration
- HSE & Community Manager
- Managing Director and CEO
- Processing Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill jumbo (two boom)^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Scissor Lift^
- Truck (haul)^
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill
- Drill (long hole)
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Explosives Charger
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Personnel Carrier
- Scissor Lift
- Shotcreter
- Trans Mixer
- Truck (fuel / lube)
- Truck (haul)
- Truck (water)
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
|
- -
- -
- -
- -
- -
- -
- 10 cu. yd
- 8 cu. yd
- -
- -
- -
- -
- -
- 50 t
- -
|
|
- Fixed Plant Operations Superintendent
- General Manager
- Logistics Manager
- Mill Manager
- Mill Operations Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Environmental & Permitting Manager
- President
- Underground Mine Engineer
|
- ..............................
 - ..............................
 - ..............................

|
- -
 - -
|
............
|
|
|
- Bolter
- Continuous Miner
- Continuous Miner^
- Shuttle car
|
|
|
|
- Purchasing Manager
- Vice President, Concentrating
- VP Safety
- VP, Engineering
|
- Chris Stover
- Van Davis
- Aaron Price
- Bob Cline
|
|
+1-681-207-7263
|
|
............................
|
- Backhoe^
- Crane^
- Dozer (crawler)^
- Drill^
- Grader^
- Loader^
- Shovel^
- Tire manipulator^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- .................................

|
- 1.5 m3
- 25 t
- -
- 251 mm
- 164 kW
- 1.5 m3
- 11 m3
- -
- -
- 13000 l
- 91 t
- -
- 50 tons
|
|
- Exploration Manager
- President and CEO
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill (long hole)^
- Drill jumbo (two boom)
- Drill jumbo (two boom)^
- Drill jumbo (two boom)^
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)^
- Rock bolter^
- Rock bolter^
- Truck (haul)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Executive Officer
- Consultant - Costs
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
 - -
 - -
|
............
|
|
............................
|
- Backhoe
- Compactor
- Dozer
- Dozer (rubber tire)^
- Dozer^
- Drill (blasthole)^
- Excavator
- Grader
- Loader
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)
- Truck (water)^
|
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- .................................

|
- -
- -
- -
- -
- -
- 110 m
- -
- -
- -
- 40 t
- -
- 23000 l
- -
- 27000 l
|
|
- Chief Operating Officer
- General Manager
- Head of Procurement and Supply Chain
- Managing Director and Senior VP
- Sr. Mine Engineer
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (dump)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Managing Director and CEO
|
- ..............................

|
|
|
|
|
- Shovel (rope)
- Shovel (rope)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- P&H 2800XPA
- P&H 4100 XPC
- Caterpillar 797F
- Komatsu 830E
- Komatsu 930E
- Komatsu 960E
- Bucyrus-Erie
|
- 28 m3
- 57 m3
- 360 t
- 210 t
- 275 t
- 327 t
- 210 t
|
|
- Chief Engineer
- Consultant - Mining & Costs
- Maintenance Superintendent
- Mine Manager
|
- Jorge Vazquez
- Danny Tolmer
- Alejandro Marquez
- Christian Torrecillas
|
|
(645)332-8079
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Drill
- Drill
- Grader
- Grader
- Grader
- Grader
- Loader (FEL)
- Loader (FEL)
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (rope) - EV
- Truck (fuel / lube)
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 4
- 1
- 3
- 5
- 2
- 5
- 2
- 2
- 1
- 1
- 2
- 1
- 2
- 2
- 1
- 1
- 2
- 1
- 1
- 1
- 1
- 2
- 2
- 1
- 1
- 2
- 33
- 6
- 9
- 7
- 13
- 4
- 1
- 1
|
- Environmental & Community Manager
- Operations Manager
- Planning Superintendent
- Production Superintendent
- Project Manager
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Bulldozer
- Bulldozer
- Compactor
- Excavator
- Excavator
- Grader
- Loader
- Loader
- Loader
- Shovel
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- 4.5 t
- -
- -
- -
- -
- -
- 14 t
- 23 t
- 70 t
- 50 t
- 40 t
|
|
|
- ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Country Manager
- Engineering Manager
- Geotechnical Manager
- Mining Manager
- Process Plant Manager
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator^
- Jumbo
- Truck (haul)
- Truck^
|
|
|
|
- Head of Engineering
- Managing Director and CEO
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Drill^
- Jumbo
- Jumbo^
- Loader^
- Loader^
- Personnel Carrier^
- Telescopic Handler^
- Truck (dump)^
- Truck (underground)
- Truck (underground)^
|
- -
- -
- -
- -
- -
- .................................
 - -
- -
- .................................
 - .................................
 - -
|
|
|
- Chief Executive Officer
- Chief Geologist
- Chief Metallurgist
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Mine General Manager
- Process Manager
- VP, Business Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Backhoe & Rock Breaker^
- Bolter^
- Drill (long hole)^
- Drill jumbo (single boom)^
- Drill jumbo (two boom)^
- Drill^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Shotcreter^
- Telescopic Handler^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
|
|
- -
- -
- -
- -
- -
- -
- -
- -
- 4 t
- 10 t
- 14 t
- -
- -
- -
- -
- -
- -
- -
- 40 t
- 30 t
- -
|
|
- Area Manager, Plant Operations
- Consultant - Recovery Methods
- Deputy Maintenance Manager
- Deputy Mine Manager
- Maintenance Planner
- Mine Manager
- Purchasing Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill
- Drill (long hole)
- Forklift
- Grader
- Load-Haul-Dump (LHD)
- Truck (dump)
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Compactor^
- Dozer^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (dump)^
|
- -
- .................................
 - -
- -
- -
- -
|
|
|
- Chief Executive Officer
- Consultant - Recovery Methods
- Managing Director
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Grader
- Loader
- Truck (dump)
- Truck (haul) - AV ^
- Truck (service)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- General Manager
- Managing Director
- Technology Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Excavator^
- Grader^
- Loader^
- Truck (dump)^
- Truck (dump)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- -
|
|
|
- Consultant - Mining & Costs
- General Manager
- Managing Director
- Technology Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Dragline^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - -
- -
- -
- -
|
- -
- -
- -
- -
- 500 t
- 350 t
- 40 t
- -
- 240 t
- 180 t
- -
- 100 t
|
|
- General Manager - Operations Development
- General Manager Operations
- GM Environment & Community Relations
- Sustainability & Environmental Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Drill^
- Excavator^
- Forklift^
- Grader^
- Hammer crusher^
- Loader^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 74 HP
- 30 t
- 354 HP
- 215 HP
- 5.5 inch
- 15.6 t
- 6 t
- 218 HP
- 360 HP
- 13.7 t
- 34 t
- 3000 l
- 42 t
- 228 kW
- 20,000 l
|
|
- Chief Executive Officer
- Chief Geologist
- Consultant - Infrastructure
- Consultant - Recovery Methods & Costs
- President
- Sr. Vice President Strategy
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Bolter
- Drill
- Drill
- Drill
- Drill
- Drill
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Truck (dump)
- Truck (dump)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Deputy Project Manager
- Electrical Superintendent
- Head of Projects
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill (blasthole)^
- Drill (blasthole)^
- Grader^
- Loader^
- Shovel^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - -
- -
- .................................
 - -
- -
- -
- -
|
- -
- 250 mm
- 165 mm
- -
- 12 m3
- 15 m3
- 90 t
- 90 t
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer (crawler)^
- Drill (long hole)^
- Drill^
- Drill^
- Grader^
- Grader^
- Jumbo^
- Loader^
- Rock bolter^
- Rockbreaker^
- Scissor Lift^
- Scoop Tram^
- Scoop Tram^
- Scoop Tram^
- Shotcreter^
- Shovel (hydraulic) - EV ^
- Trans Mixer^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (underground)^
- Truck (water)^
|
|
- -
- -
- -
- 203 mm
- 140 mm
- -
- 14 ft
- -
- 40.5 cu. yd
- -
- -
- -
- 4 cu. yd
- 11 cu. yd
- 6 cu. yd
- -
- 46 cu. yd
- -
- -
- 320 tons
- 55 tons
- -
|
- 2
- 8
- 7
- 12
- 2
- 1
- 3
- 5
- 2
- 7
- 1
- 9
- 2
- 6
- 4
- 2
- 4
- 2
- 4
- 52
- 11
- 1
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- President and CEO
- Project Superintendent
- Sr. Project Engineer
- Sr. Vice-President, Project Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter^
- Compactor^
- Drill (long hole)^
- Explosives Charger^
- Grader^
- Jumbo^
- Loader - Tool Carrier^
- Loader^
- Loader^
- Rock bolter^
- Rockbreaker^
- Shotcreter^
- Truck (underground)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Electrical Maintenance Superintendent
- Fixed Plant Maintenance Manager
- Fixed Plant Operations Superintendent
- General Manager Operations
- Metallurgical Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Load-Haul-Dump (LHD) - AV
|
|
|
|
- Development Manager
- Development Superintendent
- Electrical Maintenance Superintendent
- Fixed Plant Maintenance Manager
- General Manager Operations
- Health, Safety & Environment Manager
- Maintenance Superintendent
- Metallurgical Superintendent
- Processing Manager
|
- Nicholas Fryer
- Owen Wells
- Shehan Fernando
- Johan Botha
- Tom Lukeman
- Greg Taylor-Adams
- Jarrad Haynes
- Campbell Haines
- Rami Ghattas
|
|
02-6392-2300
|
|
............................
|
|
|
|
|
- Manager - Operating Technology
- Managing Director
|
- ..............................
 - ..............................

|
 - -
|
............
|
|
............................
|
- Drill
- Drill
- Drill jumbo (single boom)
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Loader
- Loader - AV
- Load-Haul-Dump (LHD) - AV
- Rock bolter
- Truck (haul)
- Truck (haul)
|
|
|
|
- Chief Operating Officer
- Mine Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill^
- Grader^
- Load-Haul-Dump (LHD)^
- Truck (dump)^
|
|
|
|
- Consultant - Mining
- General Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)^
- Dozer (crawler)^
- Dragline
- Excavator
- Excavator
- Excavator
- Loader
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Environmental & Community Manager
- Environmental Superintendent
- General Manager Operations Planning
- Maintenance & Engineering Manager
- Mine Planning Manager
- Mining Manager
- Mining Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Dozer
- Excavator
- Grader
- Loader (FEL)
- Truck (dump)
- Truck (water)
|
|
|
|
- Mine Manager
- Technical Services Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Electrical Engineering Manager
- GM Environment & Community Relations
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill (blasthole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Truck (haul)^
- Truck (haul)^
- Truck (underground)^
|
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
|
- 49 t
- -
- 102 mm
- -
- 250 t
- 100 t
- 16 inch
- 15 t
- 90 t
- 40 t
- 55 t
|
|
- Chief Executive Officer
- Exploration Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill (blasthole)^
- Drill (blasthole)^
- Excavator^
- Grader^
- Loader^
- Rockbreaker^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
|
- 231 kW
- 187 mm
- 121 mm
- 6.7 m3
- 221 kW
- 14.5 m3
- -
- 91 t
- 50,000 l
|
|
- Chief Operating Officer
- Environmental Superintendent
- General Manager
- Mine Superintendent
- Process Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Backhoe
- Bulldozer
- Bulldozer
- Compactor
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Grader
- Loader
- Loader
- Scissor Lift
- Scoop Tram
- Scoop Tram
- Truck (boom)
- Truck (dump)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
|
|
- Maintenance Manager
- Maintenance Planner
- Process Plant Manager
- Purchasing Manager
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Dozer (crawler)
- Drill
- Drill
- Drill
- Grader
- Grader
- Loader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Shovel
- Shovel
- Shovel - EV
- Truck (haul)
- Truck (underground) - AV ^
- Truck (water)
|
- Caterpillar D10T
- Atlas Copco PV235
- Cubex
- Atlas Copco DML
- -
- -
- LeTourneau
- Caterpillar 994
- P&H L-1850
- Caterpillar 6050
- Hitachi EX5600
- Caterpillar RH340
- Caterpillar 793F
- -
- Caterpillar 777
|
- -
- -
- -
- -
- 14 ft
- 16 ft
- -
- -
- -
- -
- -
- -
- 240 t
- 60 t
- -
|
|
- General Manager
- Mine Engineering Superintendent
- Mine General Superintendent
- Mine Technical Services Manager
- Sr. Mine Engineer
|
- Patrick Mercier
- Pierre-Olivier Richard
- Serge Arseneault
- Patrick Fiset
- Emmanuel Ferragne
|
|
819-757-2225
|
|
............................
|
- Dozer (crawler)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
|
|
- 4.7 m blade
- 270 mm
- 160 mm
- 6.7 m3
- 4.3 m blade
- 33 m3
- 20 m3
- 38 m3
- 290 t
- 227 t
- 40 t
|
|
- CEO
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)^
- Dozer (rubber tire)
- Dozer^
- Dozer^
- Drill
- Drill
- Drill
- Drill (blasthole)
- Drill (blasthole)^
- Drill^
- Drill^
- Drill^
- Drill^
- Excavator
- Excavator
- Excavator^
- Grader
- Grader
- Jumbo
- Loader
- Loader
- Loader (FEL)
- Loader (FEL)
- Loader^
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Shovel (hydraulic)^
- Shovel (rope)
- Shovel (rope)
- Shovel (rope)^
- Truck (haul)
- Truck (haul)
- Truck (haul)^
- Truck (underground)
- Truck (underground)
- Truck (underground)^
- Truck (water)
- Truck (water)
- Truck (water)^
- Truck^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 12 m3
- -
- -
- -
- -
- -
- 9 m3
- 16 m3
- -
- -
- -
- 17 t
- -
- -
- 43 m3
- 28 m3
- -
- 237 t
- -
- -
- 60 t
- 30 t
- -
- -
- -
- -
- -
|
- 6
- 2
- 1
- 5
- 4
- -
- 5
- 3
- 3
- 7
- 2
- 2
- 5
- 7
- 1
- 1
- 2
- 1
- 3
- 1
- 16
- 1
- 2
- 3
- 3
- 2
- 7
- 4
- 1
- 2
- 3
- 2
- 55
- 14
- 38
- 19
- 8
- 1
- 5
- 1
- 2
- 2
|
- Director Technical Services
- Mine Maintenance Manager
- Occupational Health & Safety Manager
- Project Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor^
- Dozer (crawler)^
- Dozer (crawler)^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
|
|
|
- CEO
- Chief Operating Officer
- Consultant - Costs
- Consultant - Infrastructure
- Consultant - Mining
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer^
- Drill (blasthole)^
- Drill^
- Forklift^
- Grader^
- Grader^
- Grader^
- Loader (FEL)^
- Loader^
- Shovel (hydraulic)^
- Tire manipulator^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
- Truck^
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 3.1 m3
- 1.1 m3
- 19 t
- 4.9 m blade
- 3.9 m blade
- 3.3 m blade
- 4.9 m blade
- 349 mm
- 100 mm
- -
- 7.3 m blade
- 4.9 m blade
- 4.3 m blade
- 21 m3
- 7 m3
- 29 m3
- -
- -
- 91 t
- 38 t
- 220 t
- 19000 l
- -
|
- 3
- 1
- 1
- 2
- 3
- 2
- 3
- 4
- 4
- 3
- 2
- 2
- 2
- 1
- 1
- 4
- 1
- 2
- 19
- 6
- 30
- 3
- 1
|
- Chief Operating Officer
- Consultant - Costs
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- General Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Grader
- Jumbo
- Loader
- Loader
- Loader
- Shotcreter
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Business Improvement Manager
- Chief Operating Officer
- Environmental Superintendent
- Fixed Plant Maintenance Superintendent
- General Manager Operations
- Geotechnical Superintendent
- HSE and Training Manager
- Logistics Manager
- Processing Superintendent
- Project Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe & Rock Breaker
- Crane
- Deck & Boom Trucks
- Dozer (crawler)
- Drill (long hole)
- Drill jumbo (two boom)
- Grader
- Grader
- Loader
- Loader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Rock bolter
- Scissor Lift
- Telescopic Handler
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- -
- .................................
 - -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................

|
- -
- 22 t
- -
- -
- -
- -
- -
- -
- -
- -
- 6 cu. yd
- 8 cu. yd
- 3.5 cu. yd
- 3.5 cu. yd
- 2 cu. yd
- -
- -
- -
- -
- 40 t
- 50 t
- 30 t
- 30 t
|
|
|
|
|
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dragline
- Dragline
- Excavator
- Excavator
- Grader
- Truck (dump) - EV
- Truck (haul)
- Truck (service)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
|
|
- Environmental Superintendent
- General Manager/SSE
- Mining Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Loader (FEL)^
- Loader (FEL)^
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Drill^
- Loader (FEL)^
- Scoop Tram^
- Shotcreter^
- Truck (dump)^
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Drill
- Drill (long hole)
- Loader
- Loader
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Metallurgist
- Environmental & Community Manager
- General Manager Operations
- Maintenance Superintendent
- Process & Maintenance Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Executive Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer (rubber tire)^
- Dozer^
- Drill - EAV ^
- Drill (blasthole) - EAV ^
- Grader^
- Loader (FEL)^
- Shovel - EV ^
- Truck (haul) - EAV ^
- Truck (water)^
|
|
- 400 t
- 50 t
- 120 t
- 30 m
- -
- 35 t
- 16 m3
- 600 t
- 240 t
- 150 t
|
|
- Environmental & Community Affairs Manager
- Environmental & Permitting Manager
|
- ..............................
 - ..............................

|
|
............
|
|
|
|
|
|
|
- Executive General Manager
- Health, Safety & Training Manager
- Maintenance Superintendent
- Process Manager
|
- Andrew Vella
- Nic Kelly
- Louis le Roux
- Andrew Hodgson
|
|
07-3153-2200
|
|
............................
|
|
- .................................
 - .................................

|
|
|
- Chief Executive Officer
- Chief Geologist
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Bolter^
- Compactor^
- Dozer (crawler)^
- Dozer (crawler)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader (mini)^
- Loader^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Telescopic Handler^
- Truck (boom)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
|
- -
- -
- .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
|
- 110 kW
- 93 kW
- -
- -
- -
- 74 kW
- 110 kW
- 5 t
- 168 kW
- -
- -
- -
- 110 kW
- 10 t
- 170 kW
- 110 kW
- 5 t
- 160 kW
- -
- 110 kW
- 160 kW
- 170 kW
- 50 t
- 110 kW
|
- 1
- 4
- 1
- -
- -
- 4
- 5
- -
- 1
- 2
- 1
- 3
- 2
- 11
- 2
- 4
- -
- 4
- 1
- -
- 1
- 2
- 11
- 1
|
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- Environmental Superintendent
- General Manager
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Drill
- Drill jumbo (two boom)
- Scoop Tram
- Truck (underground)
|
- Sandvik DL421
- Sandvik DD321
- Sandvik LH514
- Sandvik TH540
|
|
|
|
|
|
+1-877-294-8998
|
|
............................
|
- Backhoe^
- Compactor^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Shovel (hydraulic)^
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- 30 t
- 580 HP
- 200 HP
- 554 HP
- 94 t
- 20 t
- -
- 237 HP
- 8 m3
- 1.5 m3
- 44 t
- -
- 8000 l
- 12 t
- 20,000 l
|
|
- CEO
- Chief Operating Officer
- Consultant - Mining, Infrastructure & Costs
- Country Manager
- Executive VP
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
|
|
............................
|
- Bolter
- Dozer
- Dozer (rubber tire)
- Drill
- Drill (long hole)
- Excavator
- Grader
- Jumbo
- Loader
- Loader (FEL)
- Personnel Carrier
- Shovel
- Truck (haul)
- Truck (haul) - EV ^
- Truck (water)
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
|
|
- 32
- 20
- 6
- 12
- 11
- 2
- 11
- 15
- 38
- 9
- 73
- 11
- 78
- 40
- 12
|
- Environmental Manager
- General Manager
- General Manager - Processing
- Health, Safety & Training Manager
- Metallurgical Manager
- Metallurgical Superintendent
- Mineral Resource Manager
- Plant Manager
- Process Superintendent
- Underground Maintenance Superintendent
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Backhoe^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Grader^
- Loader (FEL)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
|
- -
- 5 cu. yd
- -
- -
- 4.75 inch
- -
- 6.5 cu. yd
- -
- 45 tons
- -
|
|
- Consultant - Mining & Costs
- President and CEO
|
- ..............................
 - ..............................

|
|
............
|
|
|
|
- Caterpillar 6015B
- Caterpillar 785
|
|
|
- Environmental Manager
- General Manager
- Sr. General Manger / Head of Operations
|
- Mauricio Acevedo Vidal
- Brock Johnston
- John Haynes
|
|
928-473-3518
|
|
............................
|
|
|
|
|
- Health and Safety Director
- Mine General Manager
- Safety Superintendent
- Sr. Operations Manager
- Sr. Plant Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Shuttle car
|
|
|
|
- Director of Mine Maintenance
- Safety Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer (crawler)^
- Drill (blasthole)^
- Excavator^
- Forklift^
- Grader^
- Grader^
- Loader^
- Shovel (hydraulic)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
|
|
|
- Consultant - Mining
- Consultant - Mining & Costs
- President and CEO
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Loader
- Loader
- Shovel
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Metallurgist
- General Manager
- Mine Maintenance Manager
- Mine Production Manager
- Mobile Equipment Maintenance Superintendent
- Occupational Health & Safety Superintendent
- Purchasing Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Excavator
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Area Manager
- Business Improvement Manager
- Chief Operating Officer
- Electrical Engineering Manager
- Engineering Manager
- Environmental Superintendent
- Site Facilities Superintendent
- Sr. Procurement Manager
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer^
- Drill^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Rockbreaker^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (service)^
- Truck (water)^
|
|
- 1 cu. yd
- 68 t
- 5.5 inch
- 4.3 m blade
- 16 cu. yd
- 8 cu. yd
- 5.4 t
- 2000 gal.
- 36 t
- 1.8 t
- 0.91 t
- 8000 gal.
|
|
- President and CEO
- Sr. Project Manager
- VP, Health Safety and Environment
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill
- Drill (long hole)
- Excavator
- Explosives Charger
- Grader
- Jumbo
- Loader
- Loader - Tool Carrier
- Load-Haul-Dump (LHD)
- Truck (service)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Environmental Superintendent
- Maintenance Superintendent
- Mine General Manager
- Mining Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter
- Cable bolter
- Drill
- Drill
- Drill (long hole)
- Explosives Charger
- Explosives Charger
- Loader
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Alternate Underground Manager
- Deputy Managing Director
- Mine General Manager
- Process Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer
- Dozer
- Dozer^
- Drill (long hole)
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator^
- Grader
- Grader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)^
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Personnel Carrier
- Rockbreaker
- Truck
- Truck
- Truck (dump)
- Truck (dump)
- Truck (fuel / lube)
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)^
- Truck (service)
- Truck (service)
- Truck (service)^
- Truck (water)
- Truck (water)
- Truck (water)^
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 360 HP
- 325 HP
- 215 HP
- 360 HP
- -
- -
- -
- 7 m3
- 7 m3
- 3.5 m3
- 2.3 m3
- 1.8 m3
- 3.1 m3
- 2 m3
- 7 m3
- 5.5 m
- 4.3 m
- 11.5 m3
- 7 m3
- 3.2 m3
- 4.4 m3
- 11.5 m3
- 5.3 m
- 3.1 m
- 4.6 m
- -
- -
- -
- -
- 55 t
- 41 t
- -
- -
- 63 t
- 92.2 t
- 30 t
- 40 t
- 26 t
- 92.2 t
- -
- -
- -
- -
- -
- -
|
- 2
- 2
- 2
- 2
- 5
- 2
- 5
- 2
- 1
- 2
- 2
- 2
- 2
- 1
- 1
- 2
- 3
- 1
- 2
- 1
- 1
- 1
- 13
- 2
- 1
- 47
- 1
- 2
- 1
- 4
- 14
- 2
- 1
- 8
- 4
- 12
- 2
- 1
- 9
- 2
- 1
- 3
- 2
- 1
- 1
|
- General Manager Exploration
- Mine Captain
- Production Manager
- VP and General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Truck - EV
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................

|
- 110 t
- 70 t
- 250 mm
- 127 mm
- 34 m3
- 29 m3
- 65 t
- 19 m3
- 60 t
- 250 t
|
|
- Engineering Manager
- General Manager Mining
- Mine Infrastructure Manager
- Mine Maintenance Manager
- Mine Operations Manager
- Planning Manager
- Production Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- ANFO Loader^
- Cable bolter^
- Compactor^
- Deck & Boom Trucks
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Personnel Carrier^
- Rock bolter^
- Rockbreaker^
- Scaler^
- Scissor Lift^
- Shotcreter^
- Telescopic Handler^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 8.6 m3
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 51 t
- -
|
- 2
- 2
- 2
- 1
- 2
- 3
- 3
- 1
- 2
- 2
- 22
- 2
- 3
- 3
- 9
- 2
- 4
- 2
- 2
- 6
- 2
- 2
- 3
- 4
- 2
|
- Chief Executive Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Project Manager
- VP, Environmental, Social, and Governance
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Bulldozer
- Bulldozer
- Dozer (crawler)
- Dozer (rubber tire)
- Dozer (rubber tire)
- Drill
- Grader
- Grader
- Loader (FEL)
- Loader (mini)
- Shovel
- Shovel (hydraulic) - EV
- Shovel (rope) - EV
- Truck (haul)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 1.8 cu. yd
- 455 kW
- 664 kW
- -
- 396 kW
- 637 kW
- -
- 4.9 m
- -
- 50 cu. yd
- -
- 38 cu. yd
- 55 cu. yd
- 73 cu. yd
- 300 t
- 75000 l
- -
|
|
- Environmental Superintendent
- Executive General Manager Operations
- Maintenance Manager
- Mine Manager
- Plant Operations Superintendent
- Tailings area Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Drill^
- Excavator^
- Grader^
- Loader^
- Loader^
- Shovel (hydraulic)^
- Shovel (rope) - EV ^
- Truck (dump)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
- Komatsu D475A^
- Komatsu D375A^
- Komatsu WD900^
- P&H 320XPC^
- Epiroc SmartROC D65^
- Epiroc SmartROC T45^
- Komatsu PC360LC-11^
- Komatsu GD825A^
- Komatsu WA1200-6^
- Komatsu WA800-3^
- Komatsu PC8000^
- P&H 4100 XPB/XPC^
- Komatsu HM400^
- Komatsu 980E^
- Komatsu HD1500^
- -
|
- 664 kW
- 455 kW
- 637 kW
- 314 mm
- 178 mm
- 114 mm
- 1.96 m3
- 209 kW
- 20 m3
- 11 m3
- 42 m3
- 67.6 m3
- -
- 370 t
- 144 t
- 30,000 gal.
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Head of Engineering
- VP, Environment and Permitting
- VP, Projects
|
- Daniel Roth
- John Marek
- Laurie Tahija
- Paul Hosford
- Shena Shaw
- Jeff Eng
|
|
1-867-668-5704
|
|
............................
|
- Continuous Miner
- Continuous Miner^
- Loader
- Rock bolter
- Rock bolter^
- Scoop Tram
- Scoop Tram^
- Shuttle car - EV
|
- -
- -
- .................................
 - -
- -
- -
- -
- -
|
|
|
- Logistics Manager
- Safety Director
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Backhoe^
- Bulldozer^
- Bulldozer^
- Crane^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- Caterpillar 432F^
- Caterpillar D8T^
- Caterpillar D6T^
- -
- Caterpillar 834H^
- Sandvik Leopardâ„¢ DI650i^
- Caterpillar 374^
- Komatsu PC350^
- -
- Caterpillar 140 M^
- Caterpillar 966^
- Volvo FMX^
- Scania G500 B 8X4^
- Volvo FMX^
|
- -
- -
- -
- 30 t
- -
- -
- 70 t
- 35 t
- -
- -
- -
- 8000 l
- 42 t
- 20,000 l
|
|
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- VP Operations
|
- Marcus Brewster
- Ricardo Reis de Paula
- Porfirio Cabaleiro Rodriguez
- Fernanda Bretas
|
|
+1-480-794-1244
|
|
............................
|
- Backhoe^
- Compactor^
- Crane^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Forklift^
- Forklift^
- Grader^
- Hammer crusher^
- Loader^
- Loader^
- Loader^
- Personnel Carrier^
- Shovel (hydraulic)^
- Tire manipulator^
- Tractor trailer^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................

|
- 1.3 cu. yd
- 7.5 ft
- 80 tons
- 600 HP
- 620 HP
- 225 mm
- 9 inch
- 6 cu. yd
- 33 tons
- 16 tons
- 16 ft
- -
- 28 cu. yd
- 10 cu. yd
- 32 cu. yd
- -
- 44.5 cu. yd
- -
- 160 tons
- 40 tons
- 8000 gal.
- 250 tons
- 61 tons
- -
- 32000 gal.
|
- 1
- 1
- 1
- 5
- 2
- 4
- 3
- 1
- 1
- 1
- 3
- 1
- 2
- 1
- 2
- 25
- 3
- 1
- 1
- 1
- 1
- 24
- 3
- 2
- 2
|
- Consultant - Costs
- Consultant - Recovery Methods
- Environmental & Permitting Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Excavator
- Grader
- Scraper
- Truck (haul)
- Truck (water)
|
|
|
|
- Chief Operating Officer
- Environmental & Community Superintendent
- Processing Manager
- Procurement Manager
- Production Superintendent
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer (crawler)
- Dozer (crawler)
- Dragline
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Loader
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- 400 t
- 400 t
- 400 t
- 600 t
- 200 t
- -
- -
- -
- -
- -
- -
|
|
- Environmental Manager
- General Manager Operations
- Health, Safety & Security Manager
- Maintenance Superintendent
- Mine Planning Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Bolter^
- Concrete sprayer^
- Excavator^
- Jumbo^
- Jumbo^
- Loader (FEL)^
- Loader^
- Loader^
- Scaler^
- Scoop Tram^
- Scoop Tram^
- Telescopic Handler^
- Trans Mixer^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
- -
- -
- 250 l
- 2.4 m3
- -
- -
- 4.3 cu. yd
- -
- 5 cu. yd
- -
- 4.2 cu. yd
- 6 cu. yd
- -
- 4 m3
- 15 m3
|
|
- Chief Operating Officer
- Concentrator Manager
- Consultant - Mining, Infrastructure & Costs
- Consultant - Recovery Methods
- Laboratory Manager
- Plant Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Dragline Maintenance Planner
- Engineering Manager
- Operations Manager
- President
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill
- Drill
- Drill
- Drill - AV
- Excavator
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Shovel
- Shovel (rope) - EV
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul) - AV
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 360 t
- 360 t
- 330 t
- 230 t
- 230 t
- 240 t
- -
|
|
- Concentrator Manager
- General Manager
- Mine Development Manager
- Plant Maintenance Manager
- Plant Maintenance Planning Superintendent
- Tailings area Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Feeder Breaker
- Loader
- Loader
- Personnel Carrier
- Shearer
- Shuttle car
|
- .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................

|
|
|
- Health, Safety & Environment Director
- Technical Services Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (crawler)^
- Grader^
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Shovel^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Director of Operations
- Environmental Manager
- HSE & Quality Manager
- Mine Production Manager
- Planning Manager
- Purchasing Manager
- Technical Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Chief Operating Officer
- Environmental Manager
- Facilities Maintenance Manager
- Haulage Superintendent
- Mining Superintendent
- Production Manager
- Project Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Excavator
- Grader
- Jumbo
- Jumbo
- Jumbo
- Loader
- Loader
- Loader
- Loader
- Scoop Tram
- Scoop Tram
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Telescopic Handler^
- Tire manipulator^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- 460 HP
- 354 HP
- 10 inch
- 6 inch
- 8 inch
- 15 m3
- 49 t
- 2.5 t
- 14 ft
- 11 m3
- 4 t
- -
- 28 t
- -
- 90 t
- -
- 15000 l
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Environmental Superintendent
- President and CEO
- Project Controls Manager
- Senior Mining Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Bulldozer^
- Drill (blasthole)^
- Grader^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
|
|
- 310 HP
- 240 HP
- 152 mm
- 145 HP
- 10.7 m3
- 5.2 m3
- 78.3 t
- 44326 l
- -
- 9500 l
|
|
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- President and CEO
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Excavator
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
|
|
|
- Engineering Manager
- Exploration Manager
- Mine Superintendent
- Technical Services Manager
- VP Operations
|
- Ricardo Caycho
- Juan Carlos Sarmiento Arias
- Rafael Guerrero Valqui
- Julio Torres
- Ronald Diaz Vásquez
|
|
+511-706-0430 or 0400
|
|
............................
|
- Drill
- Drill
- Scoop Tram
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Operations Manager
- Operations Superintendent
- Plant Maintenance Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill^
- Loader (FEL)^
- Truck (haul)^
|
|
|
|
- Consultant - Mining
- President
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Crane^
- Deck & Boom Trucks^
- Dozer^
- Dozer^
- Dozer^
- Excavator^
- Grader^
- Loader (FEL)^
- Rockbreaker^
- Truck (haul)^
- Truck (water)^
- Truck (water)^
|
- -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - -
- -
|
- -
- 50 t
- 17 t
- 230 kW
- 300 kW
- -
- -
- 4.9 m blade
- 13 m3
- -
- 91 t
- -
- 3000 gal.
|
|
- Chief Operating Officer
- Consultant - Recovery Methods & Costs
- President and CEO
|
- ..............................
 - ..............................
 - ..............................

|
|
|
|
............................
|
- Concrete sprayer^
- Drill^
- Drill^
- Explosives Charger^
- Grader^
- Loader^
- Telescopic Handler^
- Trans Mixer^
- Truck (underground)^
- Truck^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- VP Exploration
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Bolter
- Bolter
- Compactor
- Dozer
- Drill
- Drill
- Excavator
- Excavator
- Forklift
- Grader
- Jumbo
- Jumbo
- Loader (FEL)
- Raise boring rig
- Scaler
- Scaler
- Scissor Lift
- Scoop Tram
- Scoop Tram
- Trans Mixer
- Truck (boom)
- Truck (boom)
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 35 t
- 52 t
|
- 6
- 3
- 7
- 2
- 3
- 6
- 2
- 6
- 4
- 4
- 1
- 2
- 9
- 2
- 6
- 6
- 6
- 5
- 14
- 10
- 1
- 3
- 5
- 1
- 42
- 26
|
- General Manager Mining
- Health, Safety & Environment Manager
- Maintenance Manager
- Plant Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader
- Bolter
- Bolter
- Cable bolter
- Concrete sprayer
- Drill (long hole)
- Drill (long hole)
- Explosives Charger
- Grader
- Jumbo
- Loader
- Loader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Personnel Carrier
- Scaler
- Scaler
- Scissor Lift
- Telescopic Handler
- Telescopic Handler
- Trans Mixer
- Truck (fuel / lube)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- 135 kW
- 135 kW
- -
- -
- 33 kW
- 33 kW
- -
- -
- -
- 5.3 m3
- 4.1 m3
- 14 t
- 7 t
- 15 t
- -
- -
- -
- 4.5 t
- 4 t
- 4.082 t
- 5.6 m3
- 140 l
- 40 t
|
|
- Consultant - Infrastructure
- Consultant - Recovery Methods
- Principal author (consultant)
- Supply Chain Superintendent
- Technical Services Manager
- Technical Services Superintendent
- VP, Corporate Development
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Loader (FEL)
- Shovel
- Shovel
- Truck (dump)
- Truck (dump)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Electrical Maintenance Superintendent
- Engineering Project Manager
- General Manager
- Maintenance Manager
- Maintenance Planner
- Mine Manager
- Sr. Manager, Supply Chain
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Bolter
- Bulldozer
- Concrete sprayer
- Deck & Boom Trucks
- Drill
- Drill (blasthole)
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Excavator
- Grader
- Grader
- Loader
- Loader
- Loader
- Loader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scissor Lift
- Telescopic Handler
- Tipper truck
- Tractor trailer
- Trans Mixer
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (service)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
- 38 mm
- 36 mm
- -
- -
- 20 t
- -
- 4 inch
- 3 inch
- 3 inch
- 51 mm
- 51 mm
- 51 mm
- 4 m3
- -
- -
- 4 m3
- 4 m3
- 4 m3
- -
- 6 cu. yd
- 3.5 cu. yd
- 3.5 cu. yd
- 6 cu. yd
- -
- -
- 20 t
- 50 t
- -
- -
- 50 t
- 45 t
- 40 t
- 20 t
- -
- 30,000 l
- -
|
- 5
- 2
- 2
- 2
- 1
- 1
- 3
- 1
- 2
- 1
- 3
- 3
- 3
- 2
- 1
- 1
- 1
- 1
- 1
- 3
- 1
- 1
- 2
- 2
- 7
- 4
- 1
- 2
- 2
- 2
- 4
- 1
- 2
- 2
- 1
- 1
|
- Chemical Laboratory Superintendent
- Health, Safety & Environment Manager
- Health, Safety & Environment Superintendent
- Plant Manager
- Technical Services Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Excavator
- Loader (FEL)
- Load-Haul-Dump (LHD)
- Truck (haul)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
|
- -
- -
- -
- -
- -
- -
- 37.5 t
- 5.5 m3
- -
- 40 t
- 30 t
|
|
- Engineering Superintendent
- Environmental Superintendent
- General Manager
- Health & Safety Manager
- Mine General Manager
- Mine Operations Manager
- Plant Maintenance Planner
- Plant Maintenance Superintendent
- Plant Operations Manager
- Superintendent UG Development
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Compactor^
- Crane^
- Crane^
- Dozer^
- Dozer^
- Dozer^
- Drill^
- Excavator^
- Excavator^
- Forklift^
- Forklift^
- Grader^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader^
- Tractor trailer^
- Truck (boom)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
|
- -
- 117 kW
- 30 t
- 40 t
- 447 kW
- 223 kW
- -
- 89 mm
- 6.7 m3
- 3 m3
- 4 t
- 2.5 t
- 4.9 m blade
- 4.4 m blade
- 7 m3
- 4.5 m3
- -
- 55 t
- 17 t
- -
- -
- 41 t
- -
- -
|
|
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Drill (blasthole)
- Grader
- Loader (FEL)
- Shovel (hydraulic)
- Shovel (rope) - EV
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
|
- -
- -
- -
- -
- 21 m3
- -
- -
- 300 t
- 380 t
- 380 t
- 250 t
|
|
- Buyer
- General Manager - Processing
- Maintenance Manager
- Maintenance Planner
- Mine Maintenance Superintendent
- Process Maintenance Superintendent
- Superintendent Concentrator Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- President and CEO
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Development Superintendent
- General Manager
- Managing Director
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)^
- Dozer (rubber tire)
- Dozer (rubber tire)^
- Drill
- Drill
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Excavator^
- Excavator^
- Grader
- Grader
- Grader^
- Loader
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)^
|
- Caterpillar D9
- Caterpillar D9
- Caterpillar D10
- Caterpillar D10
- Caterpillar D10^
- Caterpillar 834
- -
- Epiroc SmartROC D65
- Atlas Copco ROC L8 RC
- Epiroc FlexiROC D65
- Atlas Copco DML
- Hitachi EX5500
- Hitachi EX2500
- Hitachi EX2600
- -
- -
- Caterpillar 16M
- Caterpillar 16H
- -
- Caterpillar 993
- Caterpillar 785C
- Caterpillar 777G
- Komatsu 930
- Komatsu 730
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 2.9 m3
- 34 m3
- -
- -
- -
- 17 m3
- -
- -
- -
- -
- 240 t
|
- 2
- 2
- 3
- 4
- 2
- 1
- 1
- 3
- 1
- 6
- 2
- 2
- 2
- 3
- 1
- 1
- 3
- 3
- 2
- 2
- 13
- 6
- 7
- 7
- 11
|
- Director of Environment & Sustainability
- Mine Operations Manager
- Plant Maintenance Manager
- Plant Operations Manager
- Supply Chain Manager
|
- Marcos Lewin
- Igor Alberto Melo Souza
- Lucas Paes
- Alderney Moreira
- Artur Fabrini Costa
|
|
+55-62-3383-3900
|
|
............................
|
- Excavator
- Excavator
- Excavator
- Truck (haul)
|
|
|
|
- Buyer
- Deputy Maintenance Manager
- Mining Manager
- Processing Manager
- Production Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Director of Operations
- General Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Drill (blasthole)
- Excavator
- Excavator
- Grader
- Loader
- Truck (dump)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Mine Planning Superintendent
- Process Maintenance Superintendent
- Process Operations Superintendent
- Processing Manager
- Surface Mining Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill (long hole)
- Grader
- Loader
- Loader (FEL)
- Loader (FEL)^
- Loader^
- Personnel Carrier
- Personnel Carrier^
- Rockbreaker
- Rockbreaker^
- Shotcreter
- Trans Mixer
- Trans Mixer^
- Truck (underground)
- Truck (underground)^
- Truck (water)
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
|
|
|
- Consultant - Recovery Methods
- Director of Operations
- Director, Metallurgy & Processing
- Production Manager
- Technical Services Superintendent
- VP and General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Bolter^
- Drill (long hole)^
- Drill jumbo (single boom)^
- Drill jumbo (two boom)^
- Explosives Charger^
- Forklift^
- Grader^
- Loader^
- Loader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Scissor Lift^
- Truck (boom)^
- Truck (underground) - EV ^
- Truck (underground)^
- Truck^
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 7.27 t
- 10 t
- 9.6 t
- -
- -
- 42 t
- 30 t
- -
|
|
- Chief Operating Officer
- Consultant - Costs
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Managing Director
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Jumbo
- Loader
- Truck (dump)
|
|
|
|
|
|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Grader^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- -
|
- -
- -
- 203 mm
- -
- 7 m3
- 7 m3
- 64 t
- 55 m3
|
|
- Consultant - Recovery Methods & Costs
- Environmental & Permitting Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader^
- Bolter^
- Bulldozer^
- Cable bolter^
- Cassette Truck^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill^
- Explosives Charger^
- Grader^
- Grader^
- Loader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Shotcreter^
- Trans Mixer^
- Truck - EV ^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- 74 kW
- -
- 121 kW
- 150 kW
- 121 kW
- -
- 121 kW
- 110 kW
- -
- 150 kW
- -
- 315 kW
- 256 kW
- 110 kW
- 110 kW
- -
- 150 kW
- 50 t
- 150 kW
- 150 kW
- -
- 50 t
- -
|
- 1
- 7
- 1
- 1
- 1
- 3
- 6
- 3
- 2
- 1
- 1
- 1
- 15
- 1
- 1
- 4
- 1
- 1
- 1
- 1
- 1
- 1
- 8
- 1
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - -
|
|
|
- Chief Geologist
- Health & Safety Manager
- Maintenance Superintendent
- Metallurgy Superintendent
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader
- Backhoe loader
- Compactor
- Compactor
- Crane
- Crane
- Crane
- Dozer
- Drill (long hole)
- Drill (long hole)
- Excavator
- Forklift
- Grader
- Grader
- Jumbo
- Loader
- Loader
- Loader
- Loader
- Loader - Tool Carrier
- Loader (mini)
- Telescopic Handler
- Trans Mixer
- Truck
- Truck (dump)
- Truck (dump)
- Truck (service)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 1
- 1
- 2
- 1
- 3
- 1
- 1
- 4
- 6
- 3
- 4
- 1
- 3
- 2
- 9
- 3
- 7
- 8
- 1
- 7
- 1
- 1
- 1
- 1
- 25
- 5
- 1
|
- Chief Engineer - Design, Ventilation Systems
- Consultant - Mining, Infrastructure & Costs
- Executive VP
- General Manager
- Mine Operations Manager
- UG Maintenance Planning Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Dragline
- Truck (water)
- Truck (water)
|
- -
- .................................
 - -
- -
|
|
|
- General Manager
- General Manager Operations
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator - EV
- Truck (haul) - AV
- Truck (haul) - EV
- Truck (haul) - EV
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Engineering Superintendent
- Fixed Plant Operations Superintendent
- Mine General Manager
- Operational Technology Superintendent
- Production Superintendent
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill
- Loader
- Load-Haul-Dump (LHD)^
- Scoop Tram
- Truck (underground) - AV
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Engineer
- Development Manager
- Mine Production Superintendent
- Operations Manager
- Plant Operations Manager
- Refinery Manager
- Sr. Manager, Supply Chain
- Underground Mine Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
55-2322100
|
|
|
- ANFO Loader
- Bolter
- Concrete sprayer
- Crane
- Excavator
- Jet boring unit
- Jumbo - EV
- Loader (mini)
- Personnel Carrier^
- Roadheader
- Scissor Lift
- Scoop Tram
- Scoop Tram^
- Telescopic Handler
- Trans Mixer
- Truck (service)^
|
|
|
|
- Chief Metallurgist
- General Manager
- HSE & Quality Manager
- Operations Manager
- Senior Maintenance Planner
- VP, Technical Services
|
- Biman Bharadwaj
- Kirk Lamont
- Trent Hamilton
- Imre Bartha
- John Lindberg
- Lloyd Rowson
|
|
(306)-956-6200
|
|
............................
|
- Drill (long hole)^
- Drill^
- Grader^
- Jumbo^
- Load-Haul-Dump (LHD)^
- Scissor Lift^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................

|
|
|
- Chief Metallurgist
- Consultant - Mining
- Managing Director
- Operations Manager
- Study Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Bulldozer^
- Drill jumbo (single boom)^
- Drill jumbo (two boom)^
- Scoop Tram^
- Scoop Tram^
- Truck (dump)^
|
- -
- -
- .................................
 - .................................
 - -
- -
- .................................

|
- -
- -
- -
- -
- 3.5 cu. yd
- 2 cu. yd
- 25 t
|
|
- Country Manager
- Maintenance Superintendent
- Mine Operations Superintendent
- Mine Planning Superintendent
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Crane^
- Dozer^
- Grader^
- Loader^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
|
|
- Consultant - Mining, Infrastructure & Costs
- VP, Technical Services
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Shovel (rope)
- Truck (dump)
- Truck (dump)
|
- -
- -
- .................................
 - -
- -
|
|
|
- CHPP Superintendent
- Commercial Manager
- Director of Operations
- Electrical Engineering Manager
- Environmental & Community Manager
- Maintenance & Engineering Manager
- Operations Manager/SSE
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Shovel (hydraulic)
- Truck (haul)
|
|
|
|
- Chief Metallurgist
- Health & Safety Manager
- Operations Superintendent
- Planning Superintendent
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Bulldozer^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader^
- Truck (dump)^
- Truck (dump)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- Environmental Manager
- Managing Director and CEO
- Mine Manager
- Production Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator - EV
- Truck (haul) - AV
|
- .................................
 - .................................

|
|
|
- General Manager
- Mining Manager
- Mobile Maintenance Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dragline
- Dragline
- Excavator
- Excavator
- Truck (dump)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- General Manager
- Plant Manager
- Safety Manager
- Senior Maintenance Planner
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Cable bolter^
- Drill jumbo (two boom)^
- Drill^
- Explosives Charger^
- Forklift^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Raise boring rig^
- Rockbreaker^
- Scissor Lift^
- Shotcreter^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (underground)^
|
|
- -
- -
- -
- 100 mm
- -
- -
- -
- 12.5 t
- 17 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 65 t
|
|
- Consultant - Mining
- Consultant - Recovery Methods
- Engineering Director
- Environmental Manager
- Process Plant Director
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Dozer (rubber tire)^
- Drill^
- Drill^
- Drill^
- Drill^
- Excavator
- Excavator^
- Grader^
- Loader (FEL)
- Shovel (rope)
- Truck (dump)^
- Truck (haul)
- Truck (haul)
- Truck (water)^
|
- Caterpillar D10^
- Caterpillar D11^
- Caterpillar 834^
- Caterpillar 854^
- Furukawa HCR 1500^
- Epiroc D65^
- Epiroc PV351 / MD6640^
- Epiroc PV271^
- Liebherr R9350
- Liebherr R 9100^
- Caterpillar 16M^
- LeTourneau L2350
- P&H 4100 XPC
- Caterpillar 740B^
- Caterpillar 777G
- Liebherr T 284
- Caterpillar 785^
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 40 t
- 100 t
- 360 t
- -
|
|
- Chief Engineer
- Electrical Superintendent
- Environmental Superintendent
- General Manager
- Materials & Logistics Superintendent
- Mill Superintendent
- Mine Development Manager
- Mine Technical Manager
- Process Plant Manager
- Procurement Superintendent
|
- Ravi Pillay
- Boris Ostap Batista Jaramillo
- Agustina Inés Varela
- Alan Delaney
- Zafer Unlu
- Joseph Kasaji
- Japie Vorster
- Randy Van Order
- Okan Altun
- Carlos Velasco
|
|
507-294-5700
|
|
............................
|
|
- .................................

|
|
|
- Electrical Superintendent
- Engineering Manager
- General Manager Operations
- Managing Director and CEO
- Mining Manager
- Operations Manager
- Sr. Mine Engineer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Bulldozer^
- Compactor^
- Crane^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader^
- Loader^
- Personnel Carrier^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
|
- 325 kW
- -
- 117 kW
- 36 t
- 144 mm
- 5 m3
- 3 m3
- 4.9 m blade
- 4.3 m3
- 7 m3
- 4.5 m3
- -
- -
- 41 t
- -
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Executive General Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Grader^
- Loader^
- Shovel^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- -
- -
- 229 mm
- 76 mm
- 4.5 m3
- -
- 11.5 m3
- 15 m3
- 144 t
- 75 m3
|
|
- Exploration Manager
- Sustainability & Environmental Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Bulldozer
- Bulldozer
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Grader
- Hammer crusher
- Loader (FEL)
- Truck
- Truck (dump)
- Truck (fuel / lube)
- Truck (fuel / lube)
- Truck (water)
|
- -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- -
- -
- -
- 2.4 m3
- -
- -
- 5.6 m3
- -
- 22 m3
- 5000 gal.
- -
- 5000 gal.
|
|
- General Superintendent
- Maintenance Superintendent
- Mine Planning Superintendent
- Mine Superintendent
- Occupational Health & Safety Superintendent
- Site Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter^
- Drill (long hole) - EV ^
- Drill (long hole) - EV ^
- Drill jumbo (two boom) - EV ^
- Drill^
- Explosives Charger^
- Grader^
- Loader^
- Load-Haul-Dump (LHD)^
- Rockbreaker^
- Shotcreter^
- Telescopic Handler^
- Trans Mixer^
- Truck (fuel / lube)^
- Truck (underground)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- 115 mm
- 102 mm
- -
- -
- -
- 3.66 m blade
- -
- 15 t
- -
- -
- 4 t
- 5.6 m3
- -
- 45 t
- -
|
|
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- President and CEO
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Excavator
- Grader
- Loader
- Truck
- Truck (haul)
- Truck (water)
|
|
|
|
- Health, Safety & Environment Manager
- Operations Manager
- Plant Manager
- Production Superintendent
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Director of Operations
- General Manager
- Project Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Loader (FEL)
- Shovel
- Shovel
- Shovel
- Shovel (hydraulic)
- Shovel (hydraulic)
- Truck (dump) - EV
- Truck (haul)
- Truck (haul)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- 73 cu. yd
- 73 cu. yd
- 79 cu. yd
- -
- -
- -
- -
- -
|
|
- Engineering Superintendent
- Mine Planning Superintendent
- Mine Production Superintendent
- Process Manager
- Process/Metallurgical Manager
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dragline
- Drill
- Excavator
- Grader
- Shovel (hydraulic)
- Shovel (hydraulic)
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- Drilling & Blasting Superintendent
- Environmental & Community Manager
- General Manager Operations
- Maintenance Superintendent
- Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (crawler)^
- Drill^
- Drill^
- Excavator^
- Loader (FEL)^
- Loader^
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
|
- 450 kW
- 325 kW
- 250 mm
- 200 mm
- 22 m3
- 7 m3
- 14 m3
- 34 m3
- 4.5 m3
- 2 m3
- 230 t
- 91 t
- 40 t
- 120,000 l
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Maintenance Manager
- Technical Services Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
|
|
............
|
|
............................
|
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- -
- -
|
- 50 t
- 448 HP
- 347 HP
- -
- 148 HP
- -
- 12.2 m3
- -
- 90 t
- -
- 10,000 gal.
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Excavator
- Excavator
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- General Manager Operations
- Mining Projects Manager
- Operations Manager
- Permitting and Tailings Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (crawler)^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader (FEL)^
- Scraper^
- Scraper^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- -
|
- -
- -
- 12.9 ft
- 14.2 ft
- 17.3 ft
- 3 cu. yd
- 4.5 cu. yd
- 16 ft
- 12 ft
- 6 cu. yd
- 29 cu. yd
- 29 cu. yd
- 32 tons
- -
- -
- 3000 gal.
- 8000 gal.
|
|
- Consultant - Mining & Costs
- President and CEO
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill jumbo (single boom)
- Load-Haul-Dump (LHD)
- Scaler
- Truck (dump)
|
- -
- .................................
 - .................................
 - -
- -
|
|
|
- Process Plant Manager
- Procurement Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Dozer (rubber tire)
- Drill
- Grader
- Loader
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (haul)^
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
- -
- -
- 270 mm
- -
- 19 m3
- 27 m3
- 240 t
- -
- 240 t
- -
|
|
- Drilling & Blasting Manager
- Mine Manager
- Mine Planning Superintendent
- Plant Manager
- Plant Operations Superintendent
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (blasthole)^
- Loader^
- Shovel^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................

|
- -
- 17 cu. yd
- 19.5 cu. yd
- 150 tons
|
|
- President and CEO
- VP Exploration
- VP Operations & Country Manager
- VP Project Evaluations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
|
|
............................
|
- Drill
- Loader (FEL)
- Shovel (rope)
- Shovel (rope)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Engineering Manager
- President
- Safety Manager
- Vice President of Environmental Affairs
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Drill
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scissor Lift
- Truck (dump)
|
|
- -
- -
- -
- 4 cu. yd
- 6 cu. yd
- -
- 15 m3
|
|
- General Manager
- Logistics Manager
- Planning Manager
- Plant Maintenance Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Electrical Engineering Manager
- General Manager - Operations Development
- General Manager Operations
- Sustainability & Environmental Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill (blasthole)^
- Grader^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (dump)^
|
|
- 63 kW
- 200 mm
- 115 kW
- 4.5 cu. yd
- 4.5 cu. yd
- 60 tons
|
|
- President and CEO
- VP, Technical Services
|
- ..............................
 - ..............................

|
|
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Dragline
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Grader
- Loader
- Loader
- Shovel (rope) - EV
- Shovel (rope) - EV
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- 57 m3
- -
- 34 m3
- 29 m3
- 23 m3
- 14 m3
- -
- -
- -
- -
- -
- 64 m3
- 43 m3
- 360 t
- 220 t
- 180 t
|
|
- Director - HSE
- Executive General Manager - Operations
- Mine Production Superintendent
- Operations Manager/SSE
- Production Superintendent
- Technical Services Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Load-Haul-Dump (LHD) - EV
- Rockbreaker
- Truck (haul)
- Truck (haul)
|
- .................................
 - -
- -
- -
|
|
|
- Chief Geologist
- Director of Operations
- Fixed Plant Maintenance Superintendent
- General Manager
- Mobile Maintenance Superintendent
- Process Superintendent
- Production Superintendent
- Refinery Manager
- Refinery Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill^
- Explosives Charger^
- Explosives Charger^
- Forklift^
- Forklift^
- Grader^
- Grader^
- Loader (FEL)^
- Loader^
- Load-Haul-Dump (LHD) - EV ^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Personnel Carrier^
- Rock bolter^
- Rockbreaker^
- Scissor Lift^
- Scissor Lift^
- Shotcreter^
- Shovel (hydraulic)^
- Trans Mixer^
- Truck (boom)^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
- Truck^
- Truck^
- Truck^
- Truck^
|
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
|
- -
- -
- -
- 251 mm
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 25 m3
- -
- 10.7 m3
- 8.6 m3
- -
- -
- -
- -
- -
- -
- -
- 16 m3
- -
- -
- -
- -
- -
- 136 t
- -
- -
- 51 t
- -
- -
- -
- -
- -
|
- 1
- 6
- 1
- 2
- 2
- 2
- 4
- 2
- 2
- 1
- 2
- 4
- 1
- 2
- 1
- 10
- 2
- 2
- 6
- 3
- 4
- 2
- 2
- 1
- 1
- 2
- 2
- 2
- 2
- 2
- 23
- 2
- 3
- 4
- 3
- 2
- 2
- 2
- 2
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Operations Manager
- President and CEO
- VP Exploration
- VP Operations & Country Manager
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Grader^
- Loader^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 410 HP
- 354 HP
- -
- -
- 2 cu. yd
- 14 ft
- 19 cu. yd
- 100 tons
- 10,000 gal.
|
|
|
- ..............................

|
|
............
|
|
|
- Backhoe
- Cable reel truck
- Crane
- Crane
- Crane
- Crane
- Crane
- Dozer (crawler)
- Drill (blasthole)
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Shovel (hydraulic)
- Shovel (hydraulic) - EV
- Tire manipulator
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (service)
- Truck (water)
- Truck (water)
|
- Caterpillar 420D
- Caterpillar 980C
- -
- -
- -
- -
- -
- Komatsu D375A
- Atlas Copco DML
- Atlas Copco PV271
- Epiroc PV-351
- Komatsu PC400
- Komatsu PC490
- Komatsu PC200
- Hitachi ZX350
- Caterpillar 16M
- Caterpillar 988
- Komatsu WA600
- Komatsu WA180
- Caterpillar 994 K
- Komatsu PC4000
- Komatsu PC8000
- Caterpillar 980G
- -
- Euclid R260
- Komatsu 830E
- -
- Caterpillar 773
- -
|
- -
- -
- 275 t
- 80 t
- 28 t
- 18 t
- 8.5 t
- 22 m3
- -
- -
- -
- -
- -
- -
- -
- 290 HP
- -
- -
- -
- -
- 22 m3
- 42 m3
- -
- -
- 220 t
- 220 t
- -
- -
- -
|
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 6
- 1
- 3
- 2
- 1
- 1
- 1
- 2
- 4
- 1
- 2
- 2
- 1
- 1
- 3
- 1
- 2
- 3
- 34
- 3
- 3
- 2
|
- Environmental Manager
- Health & Safety Manager
- Mill Maintenance Superintendent
- Mine Operations Manager
- Supply Chain Superintendent
- VP Operations
|
- Colleen Hughes
- Jeff Zmurchyk
- David Keyworth
- Greg Wolbeck
- Cory Forcier
- John Ritter
|
|
(250)-295-0123
|
|
............................
|
- Compactor^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - -
- -
- .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- 44 cu. yd
- 250 tons
- -
|
|
- Chief Operating Officer
- Consultant - Costs
- Consultant - Mining
- Consultant - Recovery Methods
- Head of Engineering
- Sr. Technical Services Manager
- Sr. Vice President Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Dozer (crawler)^
- Drill jumbo (single boom) - EV ^
- Drill jumbo (two boom) - EV ^
- Grader^
- Loader^
- Loader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Shotcreter^
- Telescopic Handler^
- Truck (boom)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (underground)^
- Truck (water)^
|
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- 147 HP
- -
- 75 HP
- 150 HP
- -
- 5 cu. yd
- 4 m3
- 3.9 cu. yd
- 1.7 cu. yd
- -
- 147 HP
- -
- 147 HP
- 147 HP
- 40 t
- 147 HP
- 33 t
- 5000 gal.
|
|
- Consultant - Mining, Infrastructure & Costs
- President
- President and CEO
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter - EV ^
- Cable bolter^
- Continuous Miner^
- Drill jumbo (two boom)^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Rockbreaker^
- Scaler^
- Scissor Lift^
- Shotcreter^
- Tractor trailer^
- Truck (fuel / lube)^
- Truck (underground)^
|
|
|
|
- CEO
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Project Director
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Backhoe^
- Bulldozer^
- Compactor^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Shovel^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- 156 mm
- 127 mm
- -
- -
- 19 m3
- 22 m3
- 140 t
- 5000 gal.
- 5000 gal.
|
|
- Chief Operating Officer
- Consultant - Infrastructure
- Consultant - Mining
- Engineering Manager
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Grader^
- Loader^
- Loader^
- Truck (haul)^
|
|
- 455 kW
- 165 mm
- 165 mm
- 29 m3
- 163 kW
- 23 m3
- 14.5 m3
- 186 t
|
|
- Consultant - Recovery Methods & Costs
- Director, Project Development
- General Manager Sustainability
- Sr. Vice President Operations
- VP Exploration
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dragline
- Drill
- Excavator
- Shovel
- Truck (haul)
|
- -
- -
- -
- -
- -
- .................................

|
|
|
- Director Technical Services
|
- ..............................

|
|
............
|
|
............................
|
- Compactor
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Truck (dump)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- 4 inch
- 2.4 m3
- -
- -
- 4.5 m3
- 40 t
|
|
- General Manager
- Mine Planning Superintendent
- Planning Manager
- Plant Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Drill^
- Jumbo^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Truck (dump)^
|
- -
- .................................
 - -
- .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Consultant - Recovery Methods
- General Manager - Operations & Projects
- VP, Business Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Deck & Boom Trucks
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Drill (blasthole)
- Drill (blasthole)
- Drill (long hole)
- Drill jumbo (two boom)
- Excavator
- Excavator
- Grader
- Grader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader - Tool Carrier
- Rock bolter
- Shovel
- Shovel
- Tire manipulator
- Trans Mixer
- Truck (boom)
- Truck (fuel / lube)
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (service)
- Truck (service)
- Truck (service)
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (water)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 35 cu. yd
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 48 cu. yd
- 77 cu. yd
- -
- -
- -
- -
- -
- 400 tons
- 345 tons
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 1
- 2
- 8
- 2
- 7
- 1
- 5
- 2
- 3
- 2
- 3
- 3
- 3
- 6
- 3
- 3
- 1
- 1
- 2
- 1
- 5
- 4
- 2
- 2
- 3
- 1
- 2
- 3
- 19
- 30
- 9
- 1
- 2
- 1
- 5
- 5
- 2
- 3
- 3
- 3
- 1
|
- Engineering Superintendent
- Geotechnical Manager
- Health, Safety & Training Manager
- Maintenance Planning Superintendent
- Mine Operations Superintendent
- Process Superintendent
- Study Manager
- Supply Chain Manager
- Technical Services Superintendent
- Underground Maintenance Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Managing Director and CEO
- Project Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill jumbo (single boom)
- Loader - Tool Carrier
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Telescopic Handler
- Trans Mixer
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
|
|
- Consultant - Mining
- Consultant - Recovery Methods
- Electrical Superintendent
- Executive VP and Chief Development Officer
- General Manager
- Mine Superintendent
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Forklift^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 250 t
- 433 kW
- 372 kW
- 251 mm
- 355 kW
- 295 kW
- 10 t
- 30 t
- 221 kW
- 19 m3
- 6.5 m3
- 34 m3
- 4000 gal.
- 227 t
- 20,000 gal.
|
|
- Consultant - Mining & Costs
- President and CEO
- VP, Project Development
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Compactor^
- Crane^
- Dozer (crawler)
- Dozer (crawler)^
- Drill - AV
- Drill - AV ^
- Drill - AV ^
- Excavator^
- Excavator^
- Forklift^
- Forklift^
- Grader^
- Loader
- Shovel - EV
- Telescopic Handler^
- Truck (fuel / lube)^
- Truck (haul) - AV
- Truck (haul) - AV ^
- Truck (service)^
- Truck (water)^
|
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................

|
- -
- -
- 40 t
- -
- -
- -
- -
- -
- -
- -
- 5 t
- 10 t
- -
- -
- -
- -
- -
- -
- 212 t
- -
- -
|
|
- Area Manager
- Buyer
- Chief Operating Officer
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Mill Manager
- Mill Superintendent
- Mine Manager
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill
- Feeder Breaker
- Loader
- Personnel Carrier
- Scaler
|
- -
- -
- -
- .................................
 - -
- -
|
|
|
- Chief Operating Officer
- Maintenance & Reliability Manager
- Maintenance Planner
- Purchasing Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Drill^
- Drill^
- Grader^
- Loader (FEL)^
- Loader^
- Rockbreaker^
- Shovel (hydraulic)^
- Tire manipulator^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul) - AV ^
- Truck (water)^
|
|
- 3 m3
- 4 m3
- 450 kW
- 325 kW
- 370 kW
- 50 mm
- 165 mm
- 144 mm
- 216 kW
- 12 m3
- 4 m3
- -
- 12 m3
- -
- 40 t
- -
- 90 t
- 12000 gal.
|
|
- Consultant - Mining
- Consultant - Mining, Infrastructure & Costs
- Consultant - Recovery Methods & Costs
- President and COO
- Sr. Vice President Technical Services
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill^
- Drill^
- Excavator^
- Excavator^
- Loader^
- Rockbreaker^
- Tire manipulator^
- Truck (haul) - AV ^
|
|
- 228 mm
- 165 mm
- 22 m3
- 12 m3
- 18 m3
- -
- -
- 227 t
|
|
- Consultant - Infrastructure
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- President and COO
- Sr. Vice President Technical Services
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter
- Dozer (crawler)
- Drill
- Drill
- Drill (long hole)
- Drill (long hole)
- Excavator
- Excavator
- Explosives Charger
- Grader
- Grader
- Loader
- Loader
- Loader
- Loader - Tool Carrier
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Truck (dump)
- Truck (dump)
- Truck (underground)
- Truck (underground)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 18.5 t
- -
- -
- -
- -
- -
|
|
- General Manager Operations
- General Manager Projects
- Maintenance Manager
- Maintenance Superintendent
- Open Pit Mine Manager
- Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill jumbo (two boom)^
- Excavator^
- Excavator^
- Explosives Charger^
- Loader - Tool Carrier^
- Loader^
- Loader^
- Truck (haul)^
- Truck (underground)^
- Truck (underground)^
|
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
- -
- -
- 100 t
- 200 t
- -
- -
- 10 t
- 12 t
- 100 t
- 40 t
- 42 t
|
|
- Consultant - Mining
- Development Manager
- Exploration Manager
- Managing Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Bottom dump hauler
- Crane
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Dragline
- Drill
- Excavator
- Grader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Scraper
- Tractor trailer
- Truck (boom)
- Truck (boom)
- Truck (dump)
- Truck (fuel / lube)
- Truck (haul)
- Truck (water)
|
- -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - -
- -
- -
- -
- -
- .................................
 - .................................

|
- 3 cu. yd
- 240 tons
- 75 tons
- 600 HP
- 850 HP
- 200 HP
- 752 HP
- 75 cu. yd
- -
- 18 cu. yd
- 290 HP
- 30 cu. yd
- 18 cu. yd
- 6 cu. yd
- 600 HP
- 200 tons
- -
- -
- 15 tons
- -
- 100 tons
- -
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe
- Drill
- Drill
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Jumbo
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Raise boring rig
- Rock bolter
- Rock bolter
- Scaler
- Scissor Lift
- Scissor Lift
- Telescopic Handler
- Telescopic Handler
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - -
- .................................

|
- -
- 16 ft
- 16 ft
- -
- -
- -
- -
- -
- -
- 4.6 m3
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 7 m3
- 14 m3
- -
- -
- 18 m3
|
- 2
- 2
- 1
- 1
- 2
- 1
- 1
- 7
- 7
- 10
- 7
- 1
- 5
- 10
- 2
- 1
- 1
- 1
- 2
- 7
- 20
- 1
- 50
- 2
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Mine Captain
- Mine General Manager
- Plant Maintenance Manager
- Process Plant Superintendent
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill jumbo (two boom)
- Explosives Charger
- Explosives Charger
- Grader
- Loader
- Loader
- Loader
- Loader
- Loader
- Truck (fuel / lube)
- Truck (underground)
- Truck (underground)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Commercial Manager
- Environmental & Community Manager
- Processing Superintendent
- Sr. Mine Engineer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Excavator
- Loader (FEL)
- Truck (haul)
- Truck (water)
|
- -
- .................................
 - -
- -
- -
|
|
|
- Maintenance Manager
- Operations Manager
- Plant Manager
- Sr. Maintenance Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor^
- Crane^
- Dozer^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Loader^
- Personnel Carrier^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
- Truck^
- Truck^
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - .................................

|
- -
- 50 t
- -
- 127 mm
- 5.8 m3
- -
- -
- 6.4 m3
- -
- -
- -
- -
- -
- -
- 47 t
- -
|
|
- CEO
- Consultant - Infrastructure
- Consultant - Recovery Methods & Costs
- President and COO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill - EV ^
- Drill^
- Excavator - EV ^
- Excavator - EV ^
- Excavator^
- Grader^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader (FEL)^
- Loader (FEL)^
- Shovel (rope) - EV ^
- Truck (dump)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 6 m3
- 6 m3
- 600 HP
- 800 HP
- 300 HP
- 600 HP
- -
- 114 mm
- 17 m3
- 34 m3
- -
- 14 t
- 18 t
- 50 t
- 10 t
- 10 t
- 20 t
- 60 m3
- 40 t
- 290 t
- 120 t
- 150 t
- 150 t
|
- -
- -
- 4
- 10
- 9
- 2
- 6
- 1
- 2
- 2
- 6
- 3
- 4
- 2
- 1
- 1
- 2
- 3
- 94
- 56
- 33
- 2
- 1
|
- Consultant - Costs
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- VP Environment & Sustainability
- VP, Corporate Development
- VP, Projects
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Cable bolter^
- Drill - EV ^
- Drill jumbo (two boom)^
- Drill^
- Grader^
- Loader^
- Personnel Carrier^
- Scissor Lift^
- Scoop Tram^
- Scoop Tram^
- Shotcreter^
- Truck (boom)^
- Truck (underground)^
|
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 8 cu. yd
- 3 cu. yd
- -
- -
- 40 t
|
|
- Chief Executive Officer
- Chief Operating Officer
- Consultant - Infrastructure
- Consultant - Mining
- Exploration Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
|
|
............................
|
- Scoop Tram - EV
- Truck (underground) - EV
|
- .................................
 - .................................

|
|
|
- Business Support Superintendent
- Director of Operations
- Mine Technical Services Manager
- Operational Readiness Manager
- Project Lead
- Ventilation Specialist
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Grader^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (service)^
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Loader
- Shovel (hydraulic)
- Truck (haul)
- Truck (haul) - EV
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Geologist
- Chief Mining Engineer
- Mine Operations Superintendent
- Mine Technical Services Manager
- Process Manager
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill jumbo (single boom)^
- Drill jumbo (two boom)^
- Grader^
- Loader^
- Scissor Lift^
- Scoop Tram^
- Scoop Tram^
- Truck (underground)^
|
|
- -
- -
- -
- -
- -
- -
- 6 cu. yd
- 3.5 cu. yd
- 30 t
|
|
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Executive VP
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Environmental & Permitting Manager
- President
- Underground Mine Engineer
|
- ..............................
 - ..............................
 - ..............................

|
- -
 - -
|
............
|
|
............................
|
- Backhoe^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Grader^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Tractor trailer^
- Truck (dump) - EV ^
- Truck (dump)^
- Truck (haul)^
- Truck (water)^
|
- -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- .................................
 - -
|
- 5 m3
- 850 HP
- 600 HP
- 450 HP
- 37.5 tons
- 28 m3
- -
- -
- 20 m3
- 15 m3
- 95 t
- 227 t
- 36 t
- 95 t
- 135 t
|
|
- Director, Project Development
- Director, Projects
- Managing Director
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter
- Crane
- Drill
- Forklift
- Grader
- Jumbo
- Jumbo
- Loader
- Loader
- Loader
- Loader - Tool Carrier
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scoop Tram
- Shotcreter
- Telescopic Handler
- Truck
- Truck (haul)
- Truck (service)
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 17.2 t
- -
- -
- -
- -
- -
- -
- -
- -
- 63 t
- -
- -
|
|
- Consultant - Mining & Costs
- General Manager
- Mining Manager
- Mining Superintendent
- Mobile Maintenance Manager
- Sr. Ventilation Engineer
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Backhoe
- Bulldozer
- Compactor
- Drill (blasthole)
- Excavator
- Excavator - EV
- Excavator - EV
- Excavator - EV
- Grader
- Loader (FEL)
- Rockbreaker
- Truck (dump)
- Truck (dump)
- Truck (water)
|
- -
- -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- -
|
- -
- 2 m3
- 320 HP
- -
- 140 mm
- 5 m3
- 2.5 m3
- 2.4 m3
- 2.2 m3
- -
- 5 m3
- -
- 100 t
- 50 t
- 50 t
|
|
- Country Director
- Procurement Specialist
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Maintenance Planner
- Maintenance Superintendent
- Senior Maintenance Planner
- Surface Mining Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer
- Dozer
- Dozer
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Drill
- Drill
- Drill
- Drill
- Drill^
- Grader
- Grader
- Grader
- Loader
- Loader
- Loader (FEL)
- Shovel
- Shovel
- Shovel
- Shovel^
- Truck
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)^
- Truck (water)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 2
- 1
- 3
- 3
- 1
- 4
- 5
- 1
- 1
- 1
- 2
- 1
- 5
- 1
- 3
- 1
- 2
- 1
- 1
- 1
- 3
- 2
- 1
- 2
- 2
- 18
- 8
- 2
- 6
- 35
- 2
- 1
- 1
|
- Concentrator Manager
- Director of Operations
- Mine Operations Manager
- Operations Superintendent
- Refinery Superintendent
- Superintendent Concentrator Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Truck (dump)^
- Truck (water)^
|
|
|
|
- Chief Operating Officer
- General Manager
- Managing Director
- Mineral Resource Manager
- Open Pit Mine Manager
- Open Pit Superintendent
- Processing Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill jumbo (two boom)
- Drill jumbo (two boom)^
- Drill^
- Loader - Tool Carrier
- Loader - Tool Carrier^
- Load-Haul-Dump (LHD) - AV
- Load-Haul-Dump (LHD) - AV
- Load-Haul-Dump (LHD)^
- Truck (underground)
- Truck (underground)^
|
- -
- .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - -
- .................................
 - -
|
- -
- -
- -
- -
- -
- -
- 15 t
- 15 t
- 15 t
- 60 t
- 60 t
|
|
- Alternate Underground Manager
- Chief Operating Officer
- Process Manager
- Sustainability & Environmental Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- General Manager
- Maintenance Manager
- Mine Planning Manager
- Mining Manager
- Senior Mining Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor^
- Dozer^
- Drill^
- Excavator^
- Grader^
- Loader^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
- Truck^
|
- -
- -
- -
- .................................
 - -
- -
- -
- .................................
 - -
- -
|
- -
- 200 HP
- -
- 35 t
- 180 HP
- 13 t
- -
- 25 t
- -
- -
|
|
- Country Manager
- President and CEO
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Cable bolter^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Forklift^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Rockbreaker^
- Scissor Lift^
- Shotcreter^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
|
|
- -
- -
- -
- -
- -
- -
- 10 t
- 14 t
- 17 t
- 6.7 t
- -
- -
- -
- -
- -
- -
- -
- 30 t
- 40 t
- -
|
|
- Chief Geologist
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Country Manager
- Deputy General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Operating Officer
- Chief Technical Officer
- Engineering Manager
- Mine Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - -
|
|
|
- Exploration Manager
- Managing Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Grader^
- Shovel (rope) - EV ^
- Truck (haul) - AV ^
- Truck (water)^
|
|
- 5 cu. yd
- 6.4 m blade
- 6.4 m blade
- 15 inch
- 7.3 m blade
- 100 tons
- 400 tons
- 45000 gal.
|
|
- Chief Operating Officer
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dragline - EV
- Dragline - EV
- Dragline - EV
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator^
- Shovel (rope) - EV
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- 114 m3
- -
- 600 t
- -
- -
- -
- -
- -
- -
- -
- 800 t
- -
- 360 t
- -
- -
- -
- -
- -
- -
|
|
- CEO
- Director of Operations
- Drilling & Blasting Superintendent
- Engineering Manager
- Maintenance & Engineering Manager
- Mining Superintendent
- Supply Chain Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe & Rock Breaker^
- Bolter^
- Drill (long hole)^
- Drill jumbo (single boom)^
- Drill jumbo (two boom)^
- Drill^
- Explosives Charger^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Shotcreter^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
|
|
- -
- -
- -
- -
- -
- -
- -
- -
- 4 t
- 10 t
- 14 t
- -
- -
- -
- -
- -
- -
- 30 t
- -
|
|
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Jumbo
- Jumbo
- Loader (FEL)
- Loader (mini)
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck (service)
- Truck (underground)
|
- -
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................

|
- -
- -
- -
- -
- -
- 6 cu. yd
- 3.5 cu. yd
- 6 cu. yd
- -
- 10 tons
|
|
|
|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Drill jumbo (single boom)^
- Drill^
- Scoop Tram^
- Shotcreter^
- Trans Mixer^
- Truck (dump)^
|
|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Dozer^
- Excavator^
- Truck (dump)^
|
|
|
|
- CEO
- GM - Project Development & Strategy
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill jumbo (two boom)^
- Personnel Carrier^
- Scissor Lift^
- Scoop Tram^
- Scoop Tram^
- Truck (underground)^
|
|
|
|
- Consultant - Mining & Costs
- Director Business Development
- Procurement Officer
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill (long hole)
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Truck (dump)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Environmental Manager
- Executive General Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Chief Operating Officer
- General Manager Operations
- Occupational Health & Safety Manager
- Processing Manager
- Superintendent Logistics
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Bulldozer
- Drill
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Grader
- Grader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Scraper
- Scraper
- Scraper
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 250 t
- -
- 220 t
- -
- -
- 150 t
- -
- -
- -
- 190 t
- 190 t
- 150 t
- 190 t
- -
- -
- -
|
- 3
- 3
- 5
- 3
- 2
- 8
- 2
- 2
- 2
- 2
- 4
- 1
- 1
- 1
- 2
- 1
- 3
- 1
- 1
- 1
- 2
- 1
- 1
- 1
- 6
- 3
- 8
- 9
- 1
- 12
- 3
- 2
- 2
|
- Electrical Superintendent
- Fixed Plant Maintenance Superintendent
- Mine Manager/SSE
- Mining Projects Manager
- Production Superintendent
- Senior Maintenance Planner
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Drill
- Grader
- Loader
- Loader
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Geologist
- Chief Operating Officer
- Mobile Maintenance Superintendent
- Operations Manager
- Underground Mining Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager
- Managing Director and CEO
- Operations Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Drill (long hole) - EV ^
- Drill jumbo (two boom)^
- Grader^
- Load-Haul-Dump (LHD) - AV ^
- Personnel Carrier^
- Shotcreter^
- Telescopic Handler^
- Trans Mixer^
- Truck (dump)^
- Truck (service)^
|
- -
- .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- -
- .................................
 - .................................

|
|
|
- Consultant - Mining, Infrastructure & Costs
- Consultant - Recovery Methods & Costs
- Deputy General Manager
- General Manager Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Shovel - EAV
- Shovel (hydraulic) - AV
- Truck (haul) - AV
- Truck (haul) - AV
|
- -
- -
- -
- .................................
 - .................................

|
|
|
- Haulage Manager
- Maintenance Superintendent
- Mine General Manager
- Mine Scheduling Superintendent
- Regional General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader - EV ^
- Bolter - EV ^
- Cable bolter - EV ^
- Cassette Truck - EV ^
- Drill (long hole) - EV ^
- Drill jumbo (two boom) - EV ^
- Grader^
- Load-Haul-Dump (LHD) - EAV ^
- Load-Haul-Dump (LHD) - EV ^
- Load-Haul-Dump (LHD)^
- Scissor Lift - EV ^
- Shotcreter^
- Truck (haul) - EV ^
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
|
- -
- -
- -
- -
- -
- 148 HP
- 444 HP
- 8 m3
- 8 m3
- 3 m3
- -
- 148 HP
- 50 t
|
|
- Consultant - Recovery Methods
- President and CEO
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill (long hole)
- Explosives Charger
- Loader
- Loader
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Alternate Underground Manager
- Fixed Plant Maintenance Superintendent
- HSE and Training Manager
- Process Manager
- Process Superintendent
- Registered Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Dragline
- Dragline
- Excavator
- Truck (dump) - EV
- Truck (haul)
- Truck (haul)
|
- Bucyrus-Erie 1370
- Marion 8200
- Hitachi EX5600
- Komatsu 830E
- Liebherr T 264
- Caterpillar 797
|
|
|
- CHPP Manager
- Mine Superintendent
- Mining Manager
- Mobile Equipment Maintenance Superintendent
- Planning Superintendent
- Technical Services Manager
|
- Julia O'Neill
- Shane Powell
- Adam Routledge
- Greg Groves
- Craig Lowe
- Daniel Martin
|
|
+61(7)4990-9738
|
|
............................
|
- ANFO Loader^
- Bolter^
- Drill (long hole) - EV ^
- Drill jumbo (single boom) - EV ^
- Load-Haul-Dump (LHD) - EV ^
- Load-Haul-Dump (LHD) - EV ^
- Scissor Lift^
- Shotcreter^
- Truck (boom)^
- Truck (underground) - EV ^
|
- -
- -
- .................................
 - -
- .................................
 - -
- -
- -
- -
- .................................

|
- -
- -
- -
- 40 kW
- 3.5 cu. yd
- 1.5 m3
- -
- -
- -
- 20 tons
|
|
|
|
|
............
|
|
............................
|
- ANFO Loader^
- ANFO Loader^
- Bolter^
- Dozer^
- Drill (blasthole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Grader^
- Grader^
- Loader^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Shotcreter^
- Shovel^
- Shovel^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
- Truck^
|
- -
- -
- -
- .................................
 - .................................
 - -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- .................................

|
- -
- -
- -
- -
- 9 inch
- -
- -
- -
- -
- -
- 6 cu. yd
- -
- -
- -
- -
- -
- -
- -
- 32 t
- -
- -
- -
|
|
- Consultant - Recovery Methods
- Interim CEO
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Load-Haul-Dump (LHD)
- Truck (underground)
|
|
|
|
- Development Superintendent
- Engineering Manager
- General Superintendent
- Production Manager
- Sr. Vice President Underground Mine
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Loader
- Loader
- Load-Haul-Dump (LHD)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Processing Manager
- Underground Mine Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Explosives Charger
- Load-Haul-Dump (LHD) - AV
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Manager Mine Closure
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill jumbo (single boom)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Truck (haul)
|
- -
- .................................
 - .................................
 - -
|
|
|
|
- ..............................

|
|
............
|
|
|
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Drill (blasthole)^
- Drill^
- Grader^
- Loader^
- Shovel (hydraulic)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- Caterpillar D10^
- Caterpillar D9^
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 50 t
- -
- -
- -
- -
- 18 ft
- 13 m3
- 23 m3
- -
- 136 t
- -
- 20,000 gal.
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
- Site Operations Manager
- Vice President of Mining
- VP, Corporate Development
- VP, Engineering
|
- Tom Dyer
- Benjamin Bermudez
- Jason Kosec
- Matthew Mock
- Raphael Dutaut
- Jason Banducci
- Scott Olsen
|
|
+1-(604)-416-0576
|
|
............................
|
- Continuous Miner
- Feeder Breaker
- Shuttle car
|
- .................................
 - -
- .................................

|
|
|
- Engineering Manager
- Environmental Superintendent
- General Manager
- Longwall Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)^
- Drill
- Drill
- Drill
- Drill - EV
- Drill - EV ^
- Drill^
- Excavator
- Excavator
- Grader
- Grader
- Grader^
- Loader
- Loader
- Loader
- Loader
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (hydraulic) - EV
- Shovel (hydraulic)^
- Shovel (rope) - EV
- Shovel (rope) - EV
- Truck
- Truck (haul)
- Truck (haul) - EV
- Truck (haul) - EV
- Truck (haul)^
- Truck (haul)^
|
- Caterpillar D10
- Caterpillar D11
- Caterpillar 844K
- Caterpillar D10^
- Epiroc D65
- Epiroc DM45
- Atlas Copco PV271
- Atlas Copco PV271
- Atlas Copco PV271^
- Epiroc D65^
- Caterpillar 349
- Caterpillar 390
- Caterpillar 16M
- Caterpillar 24M
- Caterpillar 24M^
- Caterpillar 992
- Caterpillar 930
- Caterpillar 993
- Caterpillar 980K
- Caterpillar 6030
- Caterpillar 6060FS
- Caterpillar 6060FSE
- Caterpillar 6030^
- Caterpillar 7495
- Komatsu 4100
- Caterpillar 740
- Caterpillar 777
- Caterpillar 795
- Caterpillar 798
- Caterpillar 777^
- Caterpillar 798^
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 28 m3
- 28 m3
- -
- 48 m3
- 55 m3
- -
- -
- 313 t
- 372 t
- -
- -
|
- 9
- 5
- 2
- 1
- 3
- 2
- 6
- 4
- 1
- 1
- 2
- 7
- 3
- 2
- 1
- 1
- 2
- 1
- 2
- 1
- 3
- 2
- 1
- 2
- 1
- 2
- 13
- 36
- 6
- 4
- 24
|
- Assistant General Manager
- Consultant - Costs
- Deputy General Manager
- Health & Safety Superintendent
- Mine Manager
- Mine Operations Superintendent
- Mobile Maintenance Manager
- Mobile Maintenance Superintendent
- Plant Maintenance Manager
- Plant Maintenance Superintendent
- Sr. Maintenance Superintendent
- Sustainability & Environmental Manager
- VP Operations
|
- Jean Chateauneu
- Paul Fournier
- Colin Ashton
- Douglas Brown
- Michelle Moore
- Paul Pepper
- Louis Gendron
- Derek Buzzi
- Raphael Boutin
- Eric Saulnier
- Jason Thibodeau
- Melissa Leclair
- Andre Leite
|
|
+1-647-847-2089
|
|
............................
|
- Compactor^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader^
- Tire manipulator^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Infrastructure
- Consultant - Mining
- Country Manager
- President and CEO
- Project Manager
- VP, Project Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader^
- Rockbreaker^
- Telescopic Handler^
- Truck (dump)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
|
|
- Environmental Manager
- Exploration Manager
|
- ..............................
 - ..............................

|
|
............
|
|
|
- Backhoe
- Backhoe^
- Dozer (crawler)^
- Drill
- Drill (long hole)
- Drill^
- Excavator^
- Excavator^
- Grader
- Grader^
- Jumbo
- Jumbo
- Loader (FEL)^
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (underground)
- Truck (underground)
|
- Caterpillar 430
- Komatsu PC600LC^
- Caterpillar D10T^
- Cubex Orion
- Atlas Copco Simba M6C
- DrillTech D75EX^
- Hitachi EX1900^
- Hitachi EX1200^
- Komatsu GD655–5
- Caterpillar 16H^
- Epiroc Boomer 282
- Atlas Copco Boomer M2C
- LeTourneau L1350^
- Atlas Copco ST1020
- Epiroc ST14
- Atlas Copco ST1530
- Hitachi EX2600^
- Komatsu 830E^
- Komatsu HD785-5^
- Caterpillar 777^
- Atlas Copco MT436B
- Atlas Copco MT5010
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 6 cu. yd
- 8 cu. yd
- 10 cu. yd
- -
- 218 t
- 91 t
- 91 t
- 36 tons
- 60 t
|
|
- Chief Executive Officer
- Chief Operating Officer
- Infrastructure Superintendent
- Maintenance Superintendent
- Mine Services Superintendent
- Sr. Production Manager
- Underground Projects Superintendent
|
- Sinead Kaufman
- Matt Breen
- Caleb Larocque
- John Nauss
- Joe Blandford
- Kyle Buckoll
- Nigel King
|
|
+1-867-669-6500
|
|
............................
|
- Drill (blasthole)^
- Drill^
- Excavator^
- Excavator^
- Truck (dump)^
|
- -
- -
- .................................
 - .................................
 - .................................

|
- 102 mm
- 102 mm
- 4.6 m3
- 6.7 m3
- -
|
|
- Principal author (consultant)
- Production Geologist
- Senior Planning Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Cable bolter
- Concrete sprayer^
- Drill (long hole)
- Drill jumbo (two boom)
- Grader
- Load-Haul-Dump (LHD)
- Raise boring rig
- Scissor Lift^
- Shotcreter
- Truck (haul)
|
|
|
|
- Consultant - Mining & Costs
- General Manager
- Sr. Project Manager
- Study Manager
- Technical Services Manager
- Underground Mine Manager
|
- Phil Jones
- David Bickerton
- Glen Duncan
- Glen Taylor
- Philip Jones
- Daniel Calderwood
|
|
63-78-434-2300
|
|
............................
|
- Excavator
- Excavator
- Shovel (rope)
- Shovel (rope)
- Surface miner
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (water)
- Truck (water)
|
|
- 5 m3
- 4 m3
- 42 m3
- 10 m3
- -
- 240 t
- 100 t
- 60 t
- 70,000 l
- 28000 l
|
|
- General Manager Operations
|
- ..............................

|
|
|
|
............................
|
- Bulldozer
- Bulldozer
- Dozer (rubber tire)
- Drill (blasthole)
- Grader
- Loader (FEL)
- Shovel
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
|
|
- Environmental Manager
- Operations Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Bulldozer^
- Drill jumbo (two boom)^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader^
- Shotcreter^
- Trans Mixer^
- Truck (haul)^
- Truck (service)^
- Truck (service)^
- Truck (underground)^
- Truck (underground)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - -
- -
- .................................
 - -
- -
- .................................
 - .................................
 - -
|
- -
- -
- -
- -
- 150 t
- 75 t
- -
- -
- -
- -
- -
- -
- 5000 l
- -
- -
- -
- 10,000 l
|
|
- General Manager
- Health, Safety & Environment Superintendent
- Managing Director and CEO
- Mine Superintendent
- Senior Procurement Officer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill (long hole)
- Jumbo
- Loader
- Personnel Carrier
- Scissor Lift
- Scoop Tram
- Scoop Tram
- Truck (boom)
- Truck (fuel / lube)
- Truck (underground)
- Truck (underground)
|
|
- -
- -
- -
- -
- -
- -
- 6 cu. yd
- 2.5 cu. yd
- -
- -
- 17 m3
- 10 m3
|
|
- Assistant General Manager
- Chief Operating Officer
- Consultant - Costs
- Consultant - Mining
- Environmental Superintendent
- General Manager
- Maintenance Manager
- Supply Chain Superintendent
- Ventilation Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer (rubber tire)
- Drill (blasthole)
- Excavator
- Grader
- Loader (FEL)
- Truck (dump)
- Truck (dump)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
|
|
|
- Electrical Maintenance Superintendent
- Maintenance Manager
- Maintenance Planner
- Managing Director
- Mine Manager
- Plant Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor^
- Dozer (crawler)^
- Dozer (crawler)^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Scraper^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
- -
- -
- -
- 250 t
- 45 t
- -
- -
- -
- -
- 95 t
- 150 t
- -
- -
- -
|
|
- General Manager Sustainability
- Project Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable reel truck^
- Compactor^
- Crane^
- Crane^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill (blasthole)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Forklift^
- Forklift^
- Forklift^
- Grader^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Shovel - EV ^
- Shovel (hydraulic)^
- Telescopic Handler^
- Tire manipulator^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- 220 tons
- 165 tons
- 66 tons
- 850 HP
- 580 HP
- 800 HP
- 200 mm
- 149 mm
- 251 mm
- 6.5 cu. yd
- 16 cu. yd
- 26 tons
- 18 tons
- 5 tons
- 533 HP
- 297 HP
- 25 cu. yd
- 53 cu. yd
- 50 cu. yd
- 50 cu. yd
- 5 tons
- -
- -
- 400 tons
- 150 tons
- -
- 1459 HP
|
- 1
- 1
- 1
- 1
- 1
- 6
- 4
- 6
- 15
- 10
- 7
- 2
- 2
- 1
- 1
- 1
- 3
- 7
- 1
- 2
- 6
- 1
- 1
- 2
- 3
- 69
- 10
- 1
- 4
|
- Consultant - Mining & Costs
- Environmental & Permitting Manager
- Exploration Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor^
- Dozer (crawler)^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader - Tool Carrier^
- Loader (FEL)^
- Loader (FEL)^
- Rockbreaker^
- Tire manipulator^
- Truck (dump)^
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- 200 t
- 150 t
- -
- -
- -
- -
- -
- -
- -
- 92 t
- -
- 92 t
- -
- -
- -
- -
|
|
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- Country Manager
- Exploration Manager
- Mineral Resource Manager
- Procurement Superintendent
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Chief Safety Officer
- Engineering Manager
- General Manager Technical
- Plant General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Truck (haul)^
|
- .................................
 - -
- -
- -
- .................................
 - -
|
|
|
|
|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Excavator
- Feeder Breaker
- Grader
- Loader
- Loader (FEL)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager
- Health, Safety & Environment Manager
|
- ..............................
 - ..............................

|
 - -
|
............
|
|
|
- ANFO Loader
- Cable bolter
- Drill (long hole)
- Drill jumbo (two boom)
- Loader
- Loader - Tool Carrier
- Shotcreter
- Trans Mixer
- Truck (dump)
- Truck (underground)
|
- -
- -
- Sandvik DL421-15C
- -
- -
- -
- -
- -
- -
- Sandvik TH663i
|
|
|
- Environmental Superintendent
- HSE & Community Manager
- Maintenance & Engineering Manager
- Maintenance Superintendent
- Manager Underground Technology
- Mine Superintendent
- Processing Manager
|
- Gemma Green
- Robert James
- Norm Doxanakis
- Noel Irwin
- Adam Barton
- Ross Lovejoy
- Simon Fitzpatrick
|
|
+61-7-4442-0630
|
|
............................
|
- Dozer (crawler)^
- Dozer^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader^
- Tipper truck^
- Truck (dump)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Executive Officer
- Consultant - Infrastructure
- Consultant - Recovery Methods
- Interim CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader (FEL)^
- Shovel (rope) - EV ^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 6 m3
- 8 m3
- 800 HP
- 600 HP
- 300 HP
- 600 HP
- 115 mm
- 270 mm
- 165 mm
- 17 m3
- 34 m3
- 5.5 m blade
- 4.3 m blade
- 30 t
- 20 t
- 10 t
- 60 m3
- 290 t
- 40 t
- 90 t
- 90 t
|
|
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- President
- Sr. Vice-President, Project Development
- Sustainable Development Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Dozer (crawler)^
- Dozer^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Loader^
- Shovel^
- Tire manipulator^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
- Truck^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - -
- .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer
- Excavator
- Loader (FEL)
- Truck (dump)
|
- .................................
 - .................................
 - -
- -
|
|
|
- Logistics Manager
- Managing Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Explosives Charger^
- Grader^
- Grader^
- Loader^
- Loader^
- Load-Haul-Dump (LHD)^
- Scissor Lift^
- Shotcreter^
- Shovel (hydraulic)^
- Tire manipulator^
- Tractor trailer^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- 600 HP
- 496 HP
- -
- -
- 6.5 inch
- 8.5 inch
- 12 m3
- 49 t
- 90 t
- -
- 16 ft
- -
- 10.7 m3
- -
- -
- -
- -
- 22 m3
- -
- 150 t
- -
- 28 t
- -
- -
- 200 t
- 65 t
- 150 t
- -
- 50 t
- 76000 l
|
- 5
- 2
- 1
- 2
- 3
- 1
- 3
- 1
- 2
- 1
- 2
- 4
- 1
- 1
- 3
- 7
- 5
- 2
- 2
- 1
- 1
- 2
- 1
- 2
- 1
- 10
- 13
- 1
- 2
- 11
- 1
|
- Chief Executive Officer
- Consultant - Infrastructure
- Consultant - Mining
- Consultant - Mining & Costs
- Health, Safety & Environment Manager
- Project Manager
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Environmental & Permitting Manager
- President
- Underground Mine Engineer
|
- ..............................
 - ..............................
 - ..............................

|
- -
 - -
|
............
|
|
............................
|
- Backhoe
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Explosives Charger
- Explosives Charger
- Grader
- Grader
- Jumbo
- Jumbo
- Jumbo
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Personnel Carrier
- Shotcreter
- Telescopic Handler
- Telescopic Handler
- Trans Mixer
- Truck
- Truck (fuel / lube)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 1
- 1
- 1
- 1
- 2
- 2
- 2
- 1
- 1
- 1
- 2
- 1
- 1
- 1
- 3
- 3
- 2
- 1
- 1
- 4
- 2
- 4
- 1
- 13
- 3
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Environmental Superintendent
- Health & Safety Manager
- Managing Director
- Mill Manager
- Mine Manager
- Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Grader
- Loader (FEL)
- Shovel (hydraulic)
- Truck (fuel / lube)
- Truck (haul)
- Truck (service)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- -
|
- -
- -
- 114 mm
- -
- -
- -
- 22 m3
- -
- 135 t
- -
- 90 m3
|
|
- Chief Operating Officer
- Process Superintendent
- Supply Chain Superintendent
- Technical Services Superintendent
- VP and General Manager
- VP, Environment and Permitting
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Bulldozer^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill (blasthole)^
- Excavator^
- Grader^
- Loader (FEL)^
- Personnel Carrier^
- Rockbreaker^
- Shovel (hydraulic)
- Telescopic Handler^
- Truck (boom)^
- Truck (dump)
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
|
- -
- -
- -
- -
- 152.4 mm
- 4.6 m3
- -
- -
- -
- -
- -
- -
- -
- -
- 36 t
- -
|
|
- Chief Executive Officer
- Consultant - Recovery Methods
- President
- Principal author (consultant)
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scissor Lift
- Scissor Lift
- Truck (underground)
- Truck (underground)
|
|
- -
- -
- -
- -
- 6 cu. yd
- 4 cu. yd
- 4 cu. yd
- 3.5 cu. yd
- 3.5 cu. yd
- 2 cu. yd
- -
- -
- 30 t
- 30 t
|
|
- Chemical Laboratory Superintendent
- Chief Geologist
- Consultant - Mining & Costs
- Maintenance Superintendent
- Mill Superintendent
- Mine Captain
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill
- Forklift
- Loader (mini)
- Load-Haul-Dump (LHD)
- Locomotive
- Tractor trailer
- Truck (dump)
|
|
|
|
- Environmental Manager
- Maintenance Manager
- Mine Manager
- Procurement Lead
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (two boom)
- Explosives Charger
- Loader
- Loader - Tool Carrier
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager Operations
- Technical Services Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
- Construction Manager
- Director of Operations
- HSE & Quality Manager
- Mine Operations & Maintenance Manager
- Mine Operations Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Bolter^
- Dozer^
- Drill jumbo (two boom)^
- Drill jumbo (two boom)^
- Drill jumbo (two boom)^
- Drill jumbo (two boom)^
- Excavator^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Shotcreter^
- Telescopic Handler^
- Trans Mixer^
- Truck (underground)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- 6 cu. yd
- 9 cu. yd
- 6.5 cu. yd
- -
- -
- 3.5 cu. yd
- 15 t
|
|
- Buyer
- Environmental Superintendent
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Drill
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Metallurgist
- Commercial Manager
- Health, Safety & Environment Manager
- Maintenance Planning Superintendent
- Procurement Officer
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Cable bolter
- Cable reel truck
- Drill
- Drill (long hole)
- Drill jumbo (two boom)
- Explosives Charger
- Grader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scaler
- Scissor Lift
- Shotcreter
- Telescopic Handler
- Trans Mixer
- Truck (boom)
- Truck (service)
- Truck (underground)
- Truck (underground)
|
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
|
- 1 m3
- -
- -
- -
- -
- -
- -
- -
- 6.7 t
- 10 t
- 10 t
- 6.7 t
- -
- 4.5 t
- -
- 3 t
- 4.5 m3
- 0.9 t
- -
- 30 t
- 30 t
|
|
- Environmental Superintendent
- Maintenance Superintendent
- Mine Manager
- Mobile Equipment Maintenance Superintendent
- Process Manager
- Project Superintendent
- Safety Superintendent
- Sustainability & Environmental Manager
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (blasthole)
- Excavator
- Loader
- Shovel
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (underground)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................

|
- 270 mm
- 28 m3
- 19 m3
- -
- -
- -
- -
- -
- 90 t
- -
|
|
- Materials & Logistics Superintendent
- Mine Operations Superintendent
- Senior Mining Manager
- Supply Chain Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Equipment Maintenance Planner
- General Manager Operations
- Maintenance Planning Superintendent
- Mine Manager
- Mine Operations Superintendent
- Operations Manager
- Project Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader^
- Compactor^
- Crane^
- Crane^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Excavator^
- Forklift^
- Forklift^
- Grader^
- Grader^
- Loader (FEL)^
- Loader (mini)^
- Loader^
- Shovel (rope)^
- Telescopic Handler^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
- Truck (water)^
- Truck^
- Truck^
|
- .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - -
- .................................
 - -
- -
- -
|
- -
- -
- 40 t
- 80 t
- -
- -
- -
- -
- 5 t
- 10 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 4000 gal.
- -
- 160 t
|
- 1
- 1
- 1
- 1
- 3
- 3
- 3
- 1
- 3
- 3
- 2
- 1
- 1
- 2
- 1
- 2
- 2
- 2
- 3
- 2
- 30
- 4
- 3
- 1
- 3
- 1
|
|
- ..............................

|
|
............
|
|
............................
|
- Drill
- Loader (FEL)
- Truck (haul)
|
- -
- .................................
 - -
|
|
|
- Chief Operating Officer
- Environmental Superintendent
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Drill jumbo (two boom)^
- Drill^
- Grader^
- Loader^
- Rock bolter^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
|
- ..............................

|
|
|
|
............................
|
- Drill (long hole)
- Drill jumbo (single boom)
- Scoop Tram
- Scoop Tram
- Truck (haul)
- Truck (underground)
|
|
|
|
- Chief Operating Officer
- Consultant - Costs
- Consultant - Recovery Methods
- Environmental Manager
- General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Personnel Carrier^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- 9 m3
- -
- 3.3 m3
- 2.58 m
- 3.9 m3
- -
- -
- 45 t
- -
- 16000 l
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Country Manager
- General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Concrete sprayer
- Drill (long hole)
- Drill (long hole)
- Excavator
- Jumbo
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Rock bolter
- Truck (haul)
- Truck (haul)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Costs
- Consultant - Mining
- Consultant - Recovery Methods
- Metallurgical Superintendent
- Mine General Manager
- Planning & Engineering Superintendent
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Dozer
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Grader
- Jumbo
- Jumbo
- Loader (FEL)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scissor Lift
- Scissor Lift
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - -
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- -
- -
- 140 mm
- 140 mm
- -
- -
- -
- -
- 14 m3
- -
- -
- -
- -
- 21 m3
- 93 t
- -
- -
- -
|
|
- Buyer
- Consultant - Mining & Costs
- Mine Operations Manager
- Operational Readiness Manager
- Plant General Manager
- Site Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (two boom)
- Jumbo
- Jumbo
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Rock bolter
- Scissor Lift
- Scoop Tram
- Scoop Tram
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- 6.8 t
- -
- -
- -
- 3.5 cu. yd
- 20 tons
- 20 tons
|
|
- Maintenance Manager
- Managing Director
- Plant Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Bolter
- Bolter
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Excavator
- Grader
- Grader
- Grader
- Loader
- Loader
- Loader
- Loader
- Loader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scaler
- Scissor Lift
- Shotcreter
- Shotcreter
- Telescopic Handler
- Telescopic Handler
- Trans Mixer
- Trans Mixer
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (service)
- Truck (underground)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 7 m3
- 6 cu. yd
- 6 cu. yd
- 2 cu. yd
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 8
- 4
- 1
- 3
- 1
- 5
- 3
- 7
- 1
- 2
- 2
- 1
- 1
- 1
- 4
- 1
- 1
- -
- 8
- 7
- 4
- 8
- 1
- 4
- 3
- 16
- 2
- 3
- 4
- 6
- 13
- 4
- 4
- 5
- 6
|
- Chief Engineer
- General Manager
- Mine Manager
- Purchasing Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer^
- Drill^
- Grader^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 600 HP
- 485 HP
- 250 mm
- 4.9 m
- 20 m3
- 34 m3
- 180 t
- 50,000 l
|
|
- Consultant - Recovery Methods
- Principal author (consultant)
- Project Director
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Bolter
- Bolter
- Bolter
- Bolter
- Bolter
- Forklift
- Grader
- Jumbo
- Jumbo
- Jumbo
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scaler
- Scaler
- Scaler
- Shotcreter
- Shotcreter
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
- 5
- 8
- 1
- 1
- 1
- 3
- 3
- 2
- 9
- 3
- 1
- 2
- 1
- 20
- 7
- 2
- 5
- 11
- 5
- 3
- 19
- 2
- 1
|
- Consultant - Costs
- Consultant - Mining
- Consultant - Recovery Methods
- General Manager - Operations Development
- Infrastructure Superintendent
- Metallurgical Manager
- Mine Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Jumbo^
- Load-Haul-Dump (LHD)^
- Truck (haul)^
|
|
|
|
|
- ..............................

|
|
|
|
............................
|
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Rock bolter
- Scaler
- Shotcreter
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................

|
- 70 kW
- 135 kW
- 4 cu. yd
- 6 cu. yd
- 1.5 cu. yd
- 70 kW
- 36 kW
- 37 kW
- 20 t
|
|
- Director of Operations
- Health, Safety & Environment Superintendent
- Maintenance Superintendent
- Occupational Health & Safety Manager
- Planning & Engineering Superintendent
- Purchasing Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer
- Dozer
- Dragline
- Drill (blasthole)
- Drill (blasthole)
- Drill (blasthole)
- Drill (blasthole)
- Grader
- Grader
- Loader
- Loader
- Loader
- Loader
- Scraper
- Scraper
- Shovel - EV
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (haul)
- Truck (water)
- Truck (water)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - -
- -
- -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 270 tons
- 240 tons
- 250 tons
- 40 tons
- 35000 gal.
- 20,000 gal.
- 18000 gal.
- -
|
- 7
- 4
- 3
- 1
- 2
- 1
- 1
- 1
- 3
- 1
- 1
- 2
- 1
- 1
- 2
- 2
- -
- 5
- 14
- 2
- 3
- 1
- 1
- 1
- 1
|
- General Manager
- Maintenance Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill
- Drill
- Excavator
- Excavator
- Loader
- Loader (FEL)
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- 37 cu. yd
- 55 cu. yd
- 31 cu. yd
- 28 cu. yd
- 240 t
- 240 t
|
|
- Mine General Manager
- Mine Planning Superintendent
- Plant Operations Superintendent
- Plant Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD) - AV
- Load-Haul-Dump (LHD) - AV
- Load-Haul-Dump (LHD) - AV ^
- Load-Haul-Dump (LHD) - AV ^
- Load-Haul-Dump (LHD) - AV ^
- Load-Haul-Dump (LHD) - EAV
- Load-Haul-Dump (LHD) - EAV
- Truck (service) - AV
- Truck (underground) - AV
- Truck (underground) - AV ^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Mill Manager
- Mine and Construction Manager
- Mine Manager
- Operations Manager
- Plant Maintenance Manager
- Project & Construction Manager
- Project Controls Manager
- Project Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill^
- Grader^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Infrastructure
- Consultant - Recovery Methods & Costs
- President and CEO
- VP Exploration
- VP Operations
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Scoop Tram
- Scoop Tram
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Concentrator Plant Maintenance Manager
- General Manager
- Plant Maintenance Manager
- Plant Operations Superintendent
- President
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Shovel (hydraulic)^
- Truck (haul)^
|
|
|
|
- Country Manager
- Executive Director (Development)
- Exploration Manager
- Managing Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Truck
- Truck (dump)
|
- .................................
 - .................................
 - .................................

|
|
|
- CEO
- Mine Manager
- Production Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Jumbo
- Scoop Tram
- Truck (haul)
|
|
|
|
- Chief Executive Officer
- Director of Operations
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Bolter
- Cassette Truck
- Deck & Boom Trucks
- Drill (long hole)
- Grader
- Jumbo
- Loader - AV
- Loader - AV
- Scissor Lift
- Scoop Tram - AV
- Shotcreter
- Telescopic Handler
- Trans Mixer
- Truck (boom)
- Truck (underground) - AV
- Truck (underground) - AV
- Truck (underground) - AV
- Truck (underground) - AV
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Engineering Superintendent
- General Manager
- Maintenance Planner
- Mine Operations Superintendent
- Mine Superintendent
- Supply Chain Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Mine General Manager
- Mining Manager
- Mining Superintendent
- Processing Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner^
- Continuous Miner^
- Dozer (crawler)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Excavator^
- Explosives Charger^
- Grader^
- Grader^
- Loader - Tool Carrier^
- Load-Haul-Dump (LHD)^
- Shuttle car^
- Truck (dump)^
- Truck (dump)^
- Truck (dump)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
|
- -
- -
- 337 kW
- -
- -
- 300 t
- 130 t
- -
- -
- 216 kW
- -
- -
- -
- 140 t
- 90 t
- 30 t
- 7.5 t
- -
- -
|
|
- Executive Director & CEO
- Operations Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Cable bolter^
- Compactor^
- Dozer (crawler)^
- Drill (long hole)^
- Drill^
- Grader^
- Jumbo^
- Loader^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Shotcreter^
- Truck (boom)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 6.2 m3
- -
- -
- -
- -
- 40 t
- -
- 2000 gal.
|
|
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Grader^
- Shovel^
- Shovel^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- -
|
- 5.27 m blade
- 4.63 m blade
- 250 mm
- -
- 5 m3
- 10 m3
- 136 t
- 90 t
|
|
- Consultant - Mining & Costs
|
- ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- General Manager
- Maintenance Director
- Mine Superintendent
- President and COO
- Safety Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Dozer
- Drill (blasthole)
- Grader
- Grader
- Loader
- Shovel (rope)
- Shovel (rope)
- Shovel (rope)
- Truck (haul)
- Truck (haul)
- Truck (haul) - AV
|
- -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Maintenance Planner
- Mine Engineering Superintendent
- Supply Chain Superintendent
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Excavator
- Excavator
- Excavator
- Grader
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Executive Officer
- Engineering Manager
- General Manager/SSE
- Production Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane
- Drill
- Drill
- Drill (long hole)
- Excavator
- Explosives Charger
- Explosives Charger
- Forklift
- Forklift
- Grader
- Jumbo
- Loader - Tool Carrier
- Loader - Tool Carrier
- Loader - Tool Carrier
- Loader - Tool Carrier
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Shotcreter
- Trans Mixer
- Truck (service)
- Truck (underground)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- 35 t
- -
- -
- 2.5 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 60 t
|
- 1
- 2
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 2
- 1
- 1
- 2
- 1
- 1
- 1
- 2
- 2
- 1
- 1
- 1
- 1
- 8
|
- Chief Operating Officer
- Environmental Manager
- General Manager & Site Senior Executive
- Health, Safety & Training Manager
- Managing Director
- Mine Superintendent
- Mining Manager
- Process Plant Superintendent
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - -
- .................................
 - .................................
 - -
- -
|
|
|
- Chief Executive Officer
- Chief Geologist
- Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer^
- Drill (blasthole)^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader (mini)^
- Scissor Lift^
- Telescopic Handler^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- .................................
 - -
- -
|
- -
- 28 tons
- -
- -
- -
- -
- -
- -
- 16 ft
- 4.25 cu. yd
- 7.5 cu. yd
- -
- -
- -
- -
- -
- 45 tons
- -
- 9000 gal.
|
|
|
- ..............................

|
|
|
|
............................
|
- Bolter
- Dozer^
- Drill
- Drill (blasthole)^
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (single boom)
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Excavator^
- Grader
- Grader^
- Loader^
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scissor Lift
- Scissor Lift
- Scissor Lift
- Scoop Tram
- Telescopic Handler
- Truck (haul)
- Truck (haul)
- Truck (haul)^
- Truck (underground)
- Truck (water)^
|
- -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - -
- -
- -
|
- -
- -
- -
- 5.12 inch
- -
- -
- -
- -
- -
- -
- -
- -
- 5.9 cu. yd
- -
- -
- -
- 6 cu. yd
- 6 cu. yd
- 4 cu. yd
- 2.5 cu. yd
- -
- -
- -
- -
- -
- 40 tons
- 42 tons
- 40 tons
- 40 tons
- -
|
- 2
- 1
- 1
- 2
- 1
- 1
- 1
- 2
- 1
- 1
- 1
- 1
- 2
- 1
- 1
- 1
- 4
- 1
- 2
- 1
- 4
- 1
- 1
- 1
- 1
- 3
- 1
- 5
- 1
- 1
|
- Chief Mining Engineer
- Exploration Manager
- Maintenance Superintendent
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Dozer (crawler)^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Loader^
- Telescopic Handler^
- Tractor trailer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- -
- 50 t
- 150 mm
- 90 t
- 50 t
- 6.4 m3
- 35 t
- 55 t
- 30 t
- -
- -
- -
- -
- 64 t
- -
- 50,000 l
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
- VP Exploration
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter^
- Drill (long hole)^
- Jumbo
- Jumbo^
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)^
- Raise boring rig^
- Truck (haul)
- Truck (haul)
|
|
|
|
- Chief Operating Officer
- Exploration Manager
- Maintenance Manager
- Mine General Manager
- Mining Manager
- Processing Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Borer Miner
- Continuous Miner
- Shearer
|
- .................................
 - -
- -
|
|
|
- Chief Operating Officer
- Director of Mine Maintenance
- Project Manager
- Surface Facilities Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Health & Safety Superintendent
- HSE and Training Manager
- Project Manager
- Project Superintendent
- Technical Services Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Geologist
- Managing Director
- Technical Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Concrete sprayer
- Drill
- Drill
- Explosives Charger
- Grader
- Jumbo
- Loader - Tool Carrier
- Loader - Tool Carrier
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)^
- Rockbreaker
- Scissor Lift
- Trans Mixer
- Truck (underground)
- Truck (underground)^
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
|
|
|
- Fixed Plant Maintenance Superintendent
- General Manager Operations
- General Manager Projects
- Maintenance Manager
- Maintenance Planner
- Mining Manager
- Planning Manager
- Process Manager
- Project Manager
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Loader (FEL)^
- Truck (haul)^
|
|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Exploration Manager
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Cable bolter
- Concrete sprayer
- Deck & Boom Trucks
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (two boom)
- Grader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Personnel Carrier
- Rock bolter
- Scaler
- Scissor Lift
- Trans Mixer
- Truck (fuel / lube)
- Truck (underground)
|
- -
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- -
- .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- 8.3 m3
- 6 m3
- -
- -
- -
- -
- -
- -
- 45 t
|
|
- Drill Superintendent
- Engineering Manager
- Maintenance Planner
- Operations Manager
- Sr. Vice President Strategy
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Cable reel truck
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Drill^
- Drill^
- Grader
- Loader (FEL)
- Shovel (hydraulic)
- Shovel (rope)
- Shovel (rope)
- Shovel (rope) - EV
- Tire manipulator
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul) - AV
- Truck (haul)^
- Truck (water)
|
- -
- -
- .................................
 - -
- -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 73 cu. yd
- 73 cu. yd
- 122.5 t
- -
- -
- -
- -
- -
- 372 t
- -
|
- 16
- 10
- 1
- 16
- 19
- -
- -
- 9
- 3
- 2
- 8
- 8
- 1
- 1
- 7
- 114
- 43
- 3
- -
- 12
|
- Equipment Maintenance Manager
- Maintenance Planner
- Mine General Manager
- Study Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Compactor^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Telescopic Handler^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
- Truck^
|
|
- -
- -
- -
- 455 kW
- 264 kW
- -
- 171 mm
- -
- -
- 3.8 m3
- 5.2 m3
- 200 t
- 400 t
- -
- 11.5 m3
- 12 m3
- 19 m3
- -
- -
- 100 t
- -
- -
- -
|
|
- Consultant - Infrastructure
- Consultant - Mining, Infrastructure & Costs
- Consultant - Recovery Methods & Costs
- Environmental Manager
- Infrastructure and Site Services Manager
- Mine General Manager
- Mobile Maintenance Superintendent
- Operations Superintendent
- President and CEO
- Senior Buyer
- Sr. Mine Engineer
- VP Construction
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Bulldozer
- Dozer (rubber tire)
- Dozer (rubber tire)
- Drill
- Drill
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Shovel
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Consultant - Recovery Methods & Costs
- Engineering and Reliability Superintendent
- Mill Manager
- Mine Engineering Superintendent
- Mine General Manager
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe
- Bolter
- Continuous Miner
- Crane
- Crane
- Crane
- Crane
- Crane
- Excavator
- Forklift
- Personnel Carrier
- Scaler
- Scissor Lift
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Telescopic Handler
- Trans Mixer
- Truck
- Truck (fuel / lube)
- Truck (underground) - EV
|
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- -
- 25 t
- 20 t
- 15 t
- 10 t
- 6 t
- -
- -
- -
- -
- -
- 2.5 cu. yd
- 6 cu. yd
- 3 cu. yd
- 4 cu. yd
- -
- -
- -
- -
- 20 t
|
- 1
- 5
- 18
- 1
- 1
- 1
- 1
- 1
- 7
- 4
- 38
- 1
- 1
- 12
- 2
- 5
- 2
- 14
- 1
- 5
- 3
- 8
|
- Engineering Manager
- Maintenance Planner
- Maintenance Superintendent
- Mine Technical Services Manager
- Production Superintendent
- Sr. Mine Manager
- Sr. Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dragline
- Dragline
- Dragline
- Dragline
- Dragline
- Loader (FEL)
- Tractor trailer
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
|
|
|
- General Manager
- Maintenance Manager
- Maintenance Superintendent
- Safety Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (blasthole)^
- Excavator^
- Loader^
- Truck (haul)^
|
- -
- -
- .................................
 - -
|
|
|
- Chief Executive Officer
- General Manager
|
- ..............................
 - ..............................

|
|
............
|
|
|
- Compactor^
- Crane^
- Crane^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Forklift^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader (FEL)^
- Loader^
- Loader^
- Scraper^
- Shovel^
- Telescopic Handler^
- Tire manipulator^
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (water)^
|
- Komatsu WF450-T^
- -
- -
- Komatsu D375A^
- Komatsu WA600-5^
- Epiroc DM45^
- Epiroc PV271^
- Komatsu PC850-8^
- -
- Caterpillar IT 28^
- Komatsu 825A-2^
- Komatsu WA900^
- Caterpillar 930G^
- Caterpillar IT 28^
- Komatsu WA200PZ-6^
- Komatsu WA600-5^
- -
- Komatsu PC4000^
- -
- Komatsu WA600^
- Komatsu HD1500-7^
- Komatsu HM400-3MO^
- Komatsu HD605-7^
- Caterpillar 775B^
- Komatsu HD605^
|
- -
- 250 t
- 80 t
- -
- -
- -
- -
- -
- 2 t
- -
- -
- 13 m3
- -
- -
- -
- 6.5 m3
- 24 cu. yd
- 22 m3
- -
- -
- 144 t
- -
- -
- -
- 63 t
|
- 1
- 1
- 1
- 4
- 1
- 1
- 2
- 1
- 1
- 1
- 2
- 2
- 1
- 1
- 1
- 2
- 1
- 3
- 1
- 1
- 22
- 5
- 1
- 1
- 2
|
- Consultant - Costs
- Consultant - Recovery Methods
- Environmental Manager
- Executive General Manager
- Procurement Manager
- Project Manager
|
- Alistair Kent
- Paul Staples
- Sarah Watson
- Bryan Bailie
- Robert Blyth
- Andrew Bevan
|
|
+61-7-4442-2211
|
|
............................
|
- Excavator^
- Loader (FEL)^
- Tipper truck^
- Truck (dump)^
|
|
|
|
- Chief Executive Officer
- General Manager
- General Manager Exploration
- Health & Safety Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Business Improvement Manager
- General Manager - Operations Development
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Chief Engineer
- Mine Planning Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- 140 t
- -
- 100 t
- -
- 90 t
- -
- 30,000 l
|
|
- Chief Metallurgist
- Consultant - Costs
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Executive VP
- Interim CEO
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Bottom dump hauler
- Bulldozer
- Crane
- Dozer (rubber tire)
- Dragline
- Dragline
- Drill
- Excavator
- Grader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Scraper
- Shovel
- Shovel
- Shovel (rope)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (fuel / lube)
- Truck (water)
|
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- 200 tons
- -
- -
- -
- 125 cu. yd
- 17 cu. yd
- -
- -
- -
- 16 cu. yd
- 25 cu. yd
- 6 cu. yd
- 5 cu. yd
- 2 cu. yd
- 32 cu. yd
- 19 cu. yd
- 46 cu. yd
- 63 cu. yd
- 240 tons
- -
- 100 tons
- 200 tons
- -
- -
|
- 7
- 11
- 17
- 3
- 3
- 2
- 2
- 2
- 3
- 10
- 2
- 1
- 1
- 1
- 1
- 8
- 2
- 1
- 2
- 7
- 2
- 4
- 9
- 5
- 7
|
- Business Improvement Manager
- Operations Manager
- President
|
- ..............................
 - ..............................
 - ..............................

|
  - -
|
............
|
|
............................
|
- Backhoe loader^
- Backhoe^
- Backhoe^
- Compactor^
- Crane^
- Dozer (crawler)^
- Forklift^
- Grader^
- Loader^
- Scraper^
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................

|
- 1 m3
- 5 m3
- 2.1 m3
- 147 HP
- 95 t
- 405 HP
- 10 t
- 297 HP
- 12.2 m3
- 26 m3
- 97 t
- 36 t
- 400 HP
- 150 HP
- 34000 l
|
|
- Chief Executive Officer
- Consultant - Infrastructure
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Bulldozer
- Drill (blasthole)
- Drill (long hole)
- Drill (long hole)
- Excavator
- Excavator
- Explosives Charger
- Grader
- Grader
- Jumbo
- Jumbo
- Loader
- Loader (FEL)
- Load-Haul-Dump (LHD)
- Rock bolter
- Scaler
- Scaler
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
|
- -
- -
- 3.5 inch
- -
- -
- 2.5 m3
- 1.9 m3
- -
- -
- -
- -
- -
- -
- -
- 12 t
- -
- -
- -
- 25 t
- 32 t
- -
- 20 m3
|
|
- Consultant - Mining
- Exploration Manager
- HSE & Community Manager
- Sr. Plant Manager
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Explosives Charger^
- Grader^
- Loader - Tool Carrier^
- Loader^
- Shotcreter^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
|
|
- Project Director
- Sustainability & Environmental Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Dozer (rubber tire)^
- Drill
- Drill (blasthole)^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader
- Loader^
- Loader^
- Loader^
- Shovel^
- Truck (haul)
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
- Caterpillar D9GC^
- Caterpillar D10T^
- Caterpillar 844^
- Caterpillar 834^
- Sandvik DD422i DC
- -
- -
- Hitachi EX2600^
- Caterpillar 6015B^
- Hitachi EX1200^
- Caterpillar 16M^
- Caterpillar 18M^
- Sandvik Toroâ„¢ LH621i
- Caterpillar 988K^
- Caterpillar 992^
- Caterpillar 980L^
- Caterpillar 6040/6040 FS^
- Sandvik TH663i
- Caterpillar 777^
- Caterpillar 789^
- Volvo A60^
- -
|
- -
- -
- -
- -
- -
- -
- -
- 250 t
- 140 t
- -
- -
- -
- -
- -
- -
- -
- 400 t
- -
- 90 t
- 180 t
- -
- -
|
- 2
- 12
- 2
- 4
- 2
- 17
- 4
- 4
- 3
- 5
- 5
- 6
- 2
- 1
- 3
- 4
- 2
- 2
- 49
- 20
- 33
- 7
|
- Deputy General Manager
- Development Manager
- Equipment Maintenance Planner
- Exploration Manager
- Maintenance Planner
- Mechanical Maintenance Superintendent
- Mill Superintendent
- Procurement Manager
- Safety Manager
- Sr. Mining Superintendent
|
- Daniel Clark
- Grant Jukawics
- Keita Hawa
- Toure Abdou
- Mahamadou Hassim Diallo
- Matt Wesson
- Moctar Diallo
- Tatiana Antonovich
- Lassine Coulibaly
- Emirich Ndungula
|
|
+223-44978840
|
|
............................
|
- Backhoe loader^
- Cable bolter^
- Drill (long hole)^
- Drill^
- Explosives Charger - EV ^
- Grader^
- Load-Haul-Dump (LHD) - EV ^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Rock bolter^
- Scissor Lift^
- Scissor Lift^
- Shotcreter^
- Trans Mixer^
- Truck (boom) - EV ^
- Truck (fuel / lube)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Director of Operations
- Interim CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Bulldozer^
- Bulldozer^
- Compactor^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
|
- -
- -
- -
- 10 t
- -
- -
- -
- 6 m3
- -
- -
- -
- 43 t
- 6000 gal.
|
|
- CEO
- Construction Manager
- Consultant - Mining
- Consultant - Mining, Infrastructure & Costs
- Engineering Superintendent
- Environmental & Permitting Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (crawler)^
- Drill^
- Drill^
- Excavator^
- Grader^
- Grader^
- Loader^
- Loader^
- Truck (dump)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- 306 kW
- 433 kW
- 210 mm
- 102 mm
- 1.7 m3
- 193 kW
- 118 kW
- 10.7 m3
- 6.4 m3
- 36 t
- 90 t
- 8000 gal.
|
|
- Consultant - Mining
- Director of Operations
- Project Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Backhoe^
- Compactor^
- Crane^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Grader^
- Loader (FEL)^
- Shovel (hydraulic)^
- Tire manipulator^
- Tractor trailer^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- -
- 3 m3
- 2.1 m
- 50 t
- 35 t
- 4.7 m blade
- 2.7 m blade
- 5.2 m blade
- 200 mm
- 140 mm
- 4.9 m blade
- 18 m3
- 26 m3
- -
- 100 t
- 20 t
- -
- 220 t
- -
- 136 t
|
|
- Consultant - Recovery Methods & Costs
- Operations Superintendent
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Excavator
- Excavator
- Truck (haul)
- Truck (underground)^
|
- -
- .................................
 - .................................
 - -
- -
|
|
|
- Chief Executive Officer
- Chief Operating Officer
- Exploration Manager
- Health, Safety & Environment Manager
- Mining Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill (long hole)
- Drill jumbo (single boom)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Chief Technical Officer
- Engineering Manager
- Health, Safety & Environment Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Dozer
- Drill
- Forklift
- Grader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Rock bolter
- Scissor Lift
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
|
- -
- -
- -
- -
- -
- 2 cu. yd
- 2 cu. yd
- 2 cu. yd
- 2 cu. yd
- 1 cu. yd
- 4 cu. yd
- 4 cu. yd
- 6 cu. yd
- -
- -
- -
- 30 tons
- 30 tons
- -
|
|
- Environmental & Permitting Manager
- VP, Technical Services
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Excavator^
- Grader^
- Loader^
- Loader^
- Shovel (rope)^
- Shovel (rope)^
- Shovel (rope)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
|
- -
- 433 kW
- 468 kW
- 12.25 inch
- -
- 4.88 m blade
- 15 m3
- 7 m3
- 28 m3
- 22 m3
- 27 m3
- 222 t
- 91 t
|
|
- CEO
- Chief Operating Officer
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Drill (blasthole)
- Drill (blasthole)
- Drill (blasthole)^
- Excavator
- Grader
- Grader
- Loader (FEL)
- Loader (FEL)
- Truck (fuel / lube)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
|
- -
- -
- -
- -
- -
- 6.25 inch
- -
- -
- -
- -
- 15 cu. yd
- 16 cu. yd
- -
- 110 t
- -
|
|
- General Manager
- Health & Safety Manager
- Maintenance Planner
- Process Manager
- Sr. Mine Engineer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Jumbo^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Truck (haul)^
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Mining, Infrastructure & Costs
- Consultant - Recovery Methods
- President and CEO
|
- ..............................
 - ..............................
 - ..............................

|
  - -
|
............
|
|
............................
|
- Crane
- Dozer (crawler)
- Excavator
- Grader
- Loader
|
|
|
|
- Maintenance & Engineering Manager
- Maintenance Superintendent
- President and CEO
- Senior Maintenance Manager
- Sr. Environmental Manager
- Sr. Health, Safety & Security Manager
- Vice President of Mining
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler) - EV ^
- Excavator - EV
- Excavator - EV ^
- Truck (haul) - AV
- Truck (haul) - AV ^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Director of Operations
- Engineering Manager
- Environmental Manager
- Fixed Plant Operations Superintendent
- General Manager
- General Manager & Site Senior Executive
- Health & Safety Manager
- Manager - Operating Technology
- Manager Operations Planning
- Mine Services Manager
- Mining Manager
- Mobile Maintenance Manager
- Mobile Maintenance Superintendent
- Operations Superintendent
- Process & Maintenance Manager
- Project Manager
- Shutdown and Planning Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Bulldozer
- Dozer (rubber tire)
- Drill (blasthole)
- Drill (blasthole)
- Grader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Scraper
- Shovel (hydraulic)
- Shovel (rope)
- Shovel (rope)
- Shovel (rope)
- Shovel (rope) - EV
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (water)
|
- -
- -
- -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- -
- -
- -
- 311 mm
- 311 mm
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 122.5 t
- -
- -
- -
- -
- -
- -
- -
|
- 8
- 23
- 5
- 5
- 4
- 11
- 3
- 3
- 1
- 2
- 2
- 4
- 2
- 1
- 1
- 6
- 73
- 9
- 8
- 6
- 4
- 7
|
- General Manager Operations
- Maintenance Planner
- Mine Maintenance Superintendent
- President
- Project Lead
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Development Manager
- Director Technical Services
- Mine Operations Superintendent
- Plant Manager
- Project Lead
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
|
|
............................
|
- Excavator
- Shovel
- Truck (haul) - AV
|
- .................................
 - -
- .................................

|
|
|
- Project Controls Manager
- VP Operations
- VP Supply
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Loader
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Engineering Manager
- Health & Safety Superintendent
- Processing Superintendent
- Supply Chain Manager
- Technical Manager - Process
- VP Operations & General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Drill
- Drill jumbo (two boom)
- Loader - Tool Carrier
- Load-Haul-Dump (LHD)
- Truck (dump)^
- Truck (haul)^
- Truck (underground)
|
- -
- -
- -
- -
- -
- -
- .................................
 - -
|
|
|
- Executive General Manager Studies
- General Manager Operations
- Managing Director
- Sustainability & Environmental Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter
- Cable bolter
- Concrete sprayer
- Concrete sprayer
- Drill
- Drill
- Drill jumbo (two boom)
- Drill jumbo (two boom)
- Grader
- Grader
- Loader
- Loader - EV
- Trans Mixer
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Mining Engineer
- Electrical Superintendent
- Environmental & Community Manager
- Mine General Manager
- Mine Technical Superintendent
- Mining Manager
- Mobile Equipment Maintenance Superintendent
- Processing Manager
- Sr. Ventilation Engineer
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Dozer^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Telescopic Handler^
- Tire manipulator^
- Truck (haul)^
- Truck (service)^
- Truck (stemming)^
- Truck (water)^
|
|
- 25 t
- 50 t
- -
- 200 t
- 30 t
- -
- 4.3 m
- 6.5 m3
- -
- -
- 100 t
- -
- 3 m3
- 80,000 l
|
|
- Chief Executive Officer
- Consultant - Recovery Methods
- Mining Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dragline - EV
- Dragline - EV
- Dragline - EV
- Dragline - EV
- Dragline - EV
|
|
- 65 cu. yd
- 55 cu. yd
- 42 cu. yd
- 40 cu. yd
- 45 cu. yd
|
|
- Director of Operations
- Maintenance & Engineering Manager
- Production Superintendent
- Senior Maintenance Manager
- Sr. Health, Safety & Security Manager
- Sr. Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Bolter^
- Drill (long hole)
- Drill (long hole)^
- Drill jumbo (two boom)
- Drill jumbo (two boom)^
- Explosives Charger^
- Grader^
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift
- Truck (underground)
- Truck (underground)
- Truck (underground)^
|
|
- -
- -
- -
- -
- -
- -
- -
- -
- 4 cu. yd
- 6 cu. yd
- 8 cu. yd
- 6 cu. yd
- -
- -
- 30 t
- 50 t
- 45 t
|
|
- Chief Geologist
- Director of Operations
- Environmental Manager
- Health & Safety Superintendent
- Mine Manager
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Truck (dump)
|
- .................................
 - .................................
 - -
|
|
|
- CHPP Manager
- Commercial Manager
- Executive General Manager Operations
- Maintenance Manager
- Safety Superintendent
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Continuous Miner
- Scoop Tram
- Truck (haul)
|
|
|
|
- Maintenance Manager
- Mine General Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Head of Mine Operations
- Head of Plant Operations
- Mine Superintendent
- Processing Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter
- Drill
- Drill
- Drill
- Drill
- Explosives Charger
- Grader
- Loader - Tool Carrier
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Shotcreter
- Trans Mixer
- Trans Mixer
- Truck (service)
- Truck (underground)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- -
- -
- -
- -
- -
- -
- 104 kW
- 180 kW
- 16 t
- 10 t
- 310 kW
- -
- -
- -
- -
- 429 kW
- -
|
|
- Consultant - Mining & Costs
- Environmental Manager
- General Manager Operations
- Health, Safety & Training Superintendent
- Processing Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Backhoe
- Bottom dump hauler
- Bottom dump hauler
- Bulldozer
- Compactor
- Crane
- Crane
- Crane
- Dozer (rubber tire)
- Dragline
- Drill
- Forklift
- Grader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Scraper
- Shovel (hydraulic)
- Shovel (rope)
- Shovel (rope)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (fuel / lube)
- Truck (water)
|
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 2 cu. yd
- 18 cu. yd
- 300 tons
- 240 tons
- -
- -
- 300 tons
- 200 tons
- 60 tons
- -
- 105 cu. yd
- -
- 1.5 cu. yd
- -
- 45 cu. yd
- 30 cu. yd
- 6 cu. yd
- 32 cu. yd
- 18 cu. yd
- 40 cu. yd
- 60 cu. yd
- 190 tons
- 240 tons
- 15 tons
- 40 tons
- -
- -
|
- 3
- 4
- 3
- 5
- 15
- 2
- 1
- 1
- 1
- 5
- 3
- 2
- 2
- 10
- 2
- 2
- 3
- 7
- 4
- 1
- 1
- 11
- 10
- 2
- 2
- 4
- 5
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Bolter^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Drill (long hole)^
- Drill^
- Drill^
- Drill^
- Excavator^
- Forklift^
- Grader^
- Grader^
- Jumbo^
- Loader (FEL)^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Rockbreaker^
- Shovel (hydraulic)^
- Telescopic Handler^
- Tractor trailer^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (stemming)^
- Truck (underground)^
- Truck (water)^
- Truck^
|
- -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- .................................
 - -
- .................................

|
- -
- -
- 60 t
- -
- -
- -
- -
- 250 mm
- 90 mm
- 4 m3
- -
- -
- 16 ft
- -
- -
- 12 m3
- 10 t
- -
- 10 m3
- -
- -
- -
- -
- -
- 91 t
- -
- 15 t
- 30 t
- 8000 gal.
- -
|
- 1
- 3
- 1
- 3
- 1
- 4
- 2
- 2
- 1
- 1
- 2
- 1
- 2
- 3
- 1
- 1
- 5
- 1
- 2
- 1
- 1
- 1
- 1
- 2
- 8
- 3
- 1
- 3
- 1
- -
|
- CEO
- Consultant - Mining
- Consultant - Mining & Costs
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Jumbo
- Scoop Tram
- Truck (haul)
|
|
|
|
- Engineering Superintendent
- Maintenance Planning Manager
- Mine Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill jumbo (single boom)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Truck (haul)
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Shovel^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (stemming)^
- Truck (water)^
|
|
- -
- -
- -
- -
- 150 mm
- 36 m3
- 14 m3
- -
- -
- -
- 36 m3
- 40 t
- -
- 220 t
- 90 t
- -
- -
- -
|
|
- Business Support Superintendent
- Project Director
- Site Manager
- Sr. Mine Engineer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (two boom)
- Loader
- Loader
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager Operations
- Operations Manager
- Process Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Cable bolter
- Drill
- Drill (long hole)
- Drill (long hole)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Raise boring rig
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- 10 cu. yd
- 12 cu. yd
- 6.3 cu. yd
- -
- 45 t
- 32 t
|
|
- Chief Operating Officer
- General Manager
- Health & Safety Manager
- Maintenance Planner
- Materials Manager
- Metallurgical Manager
- Mine Manager
- Plant Operations Manager
- Procurement Manager
- Project Superintendent
- Sr. Health, Safety & Security Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable reel truck^
- Crane^
- Dozer (crawler)^
- Dozer^
- Drill^
- Drill^
- Excavator^
- Grader^
- Loader^
- Shovel^
- Tire manipulator^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Crane^
- Dozer (crawler)^
- Dozer^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Tractor trailer^
- Truck (boom)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (stemming)^
- Truck (water)^
- Truck (water)^
|
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- -
- -
- 250 mm
- 90 mm
- 15.3 m3
- 4 m3
- -
- 16 ft
- -
- 12 m3
- -
- -
- 10 t
- -
- 136 t
- -
- 15 t
- 8000 gal.
- -
|
|
- Consultant - Recovery Methods & Costs
- Executive VP
- President and CEO
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Grader
- Loader
- Shovel
- Truck (haul) - AV
- Truck (water)
|
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
|
|
|
- Development Manager
- Engineering and Reliability Superintendent
- Environmental Manager
- General Manager
- Maintenance Planning Manager
- Maintenance Planning Superintendent
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Excavator
- Loader (FEL)
- Loader (FEL)
- Shovel
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - -
- .................................

|
- 171 mm
- 251 mm
- -
- 12 m3
- 17 m3
- 29 m3
- 90 t
- 218 t
|
|
- Buyer
- Electrical Superintendent
- Engineering Manager
- General Manager
- Health, Safety & Environment Manager
- Mobile Maintenance Superintendent
- Plant Maintenance Superintendent
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Load-Haul-Dump (LHD)
- Truck (dump)
|
|
|
|
- Chief Executive Officer
- Engineering Manager
- General Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader^
- Telescopic Handler^
- Tractor trailer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - -
- -
- .................................
 - -
- -
- -
- .................................
 - -
- .................................
 - -
- -
- -
- .................................
 - -
|
- 6.3 m3
- 11 m3
- 436 HP
- 496 HP
- 165 mm
- 49 t
- 80 ft
- 14 ft
- 10.7 m3
- 271 HP
- -
- 100 t
- 28 t
- -
- 100 t
- -
|
|
- Consultant - Costs
- Consultant - Infrastructure
- Consultant - Recovery Methods
- Director Technical Services
- Managing Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scoop Tram
- Truck (haul)
- Truck (haul)
|
- -
- .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - -
|
- -
- 1.5 cu. yd
- 2.5 cu. yd
- 4 cu. yd
- 4 cu. yd
- 2 cu. yd
- 3.5 cu. yd
- 10 tons
- 20 t
|
|
- Chief Engineer
- Safety Superintendent
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader^
- Shovel (hydraulic)^
- Shovel (rope) - EV ^
- Truck (haul)^
- Truck (water)^
|
|
- -
- -
- 311 mm
- -
- -
- 38 m3
- -
- 42 m3
- 59 m3
- 345 t
- -
|
|
- Director of Operations
- Field Manager
- General Manager
- Mine Planning Manager
- Project Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill jumbo (single boom)
- Drill jumbo (single boom)
- Loader - EV
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Personnel Carrier
- Raise boring rig
- Shotcreter
- Truck
- Truck (haul)
|
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- 0.3 m3
- 1 m3
- 3 m3
- -
- -
- -
- 3 t
- 18 t
|
|
|
- ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager
- Maintenance Superintendent
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter
- Drill
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Loader
- Loader - EAV
- Rock bolter
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Exploration Manager
- Mine General Manager
- Mine Maintenance Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
|
|
|
- Director of Operations
- Health & Safety Manager
- Mine Manager
- Operations Superintendent
- Process Operations Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Continuous Miner
- Scoop Tram
- Truck (haul)
|
|
|
|
- Health and Safety Director
- Maintenance Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Loader
- Loader
- Load-Haul-Dump (LHD)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Health, Safety & Environment Manager
- Laboratory Manager
- Maintenance Manager
- Plant Production Manager
- Process Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (rubber tire)
- Drill (blasthole)
- Drill (blasthole)
- Drill (long hole)
- Drill (long hole)
- Excavator
- Excavator
- Excavator
- Excavator
- Explosives Charger
- Grader
- Jumbo
- Jumbo
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader - Tool Carrier
- Loader - Tool Carrier
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Personnel Carrier
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (underground)
- Truck (underground)
- Truck (water)
|
- .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- 203 mm
- 127 mm
- -
- -
- 6 m3
- 20 m3
- 28 m3
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 5 m3
- 9 m3
- 12 m3
- -
- 100 t
- 150 t
- 240 t
- -
- -
- -
|
- 5
- 2
- 4
- 2
- 2
- 2
- 2
- 4
- 1
- 3
- 4
- 5
- 2
- 5
- 3
- 2
- 4
- 4
- 3
- 4
- 4
- 4
- 1
- 1
- 4
- 2
- 12
- 23
- 3
- 5
- 7
- 5
|
- Drilling & Blasting Superintendent
- Maintenance Superintendent
- Operations Manager
- Plant Manager
- Production Geologist
- Sr. Environmental Manager
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Dozer
- Drill
- Excavator
- Loader (FEL)
- Truck (haul)
|
- Caterpillar D11
- Sandvik
- Hitachi EX2500-6
- Caterpillar 993K
- Caterpillar 777
|
|
|
- Engineering Superintendent
- Fixed Plant Maintenance Superintendent
- Mining Superintendent
- Production Planning Superintendent
- Superintendent Logistics
- Technical Services Manager
- Technical Services Superintendent
- VP Operations
|
- Matthew W.
- Wade Watts
- Carl Garrick
- Angus Phelps
- Filby Robin
- Michael Smith
- John Christowitz
- Mark Filtness
|
|
1800-870-766
|
|
............................
|
|
- .................................

|
|
|
- Concentrator Manager
- Executive General Manager - Operations
- General Manager Mining
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Dozer^
- Drill (blasthole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Explosives Charger^
- Grader^
- Loader (FEL)^
- Loader^
- Personnel Carrier^
- Scissor Lift^
- Shovel (hydraulic)^
- Truck (boom)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (underground)^
- Truck (water)^
|
|
- -
- -
- -
- -
- -
- -
- -
- -
- 5 m3
- -
- -
- -
- 80 t
- -
- 40 t
- -
- 40 t
- -
|
|
- CEO
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Mining, Infrastructure & Costs
- Consultant - Recovery Methods & Costs
- Environmental Manager
- General Manager
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Backhoe
- Backhoe
- Crane
- Crane
- Crane
- Crane
- Crane
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Drill
- Drill (blasthole)
- Drill (blasthole)
- Drill (long hole)
- Excavator
- Grader
- Grader
- Loader
- Loader
- Shovel
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (rope)
- Shovel (rope)
- Shovel (rope)
- Shovel (rope)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)^
- Truck (dump)^
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- 40 t
- 850 HP
- 850 HP
- 410 HP
- -
- 250 mm
- 160 mm
- -
- 160 mm
- 250 mm
- -
- -
- -
- -
- -
- 10 m3
- 15 m3
- 10 m3
- 42 m3
- 42 m3
- 42 m3
- 10 m3
- 100 t
- 100 tons
- 240 tons
- 120 t
- 100 tons
- 120 tons
- 240 tons
- 150 tons
- 240 tons
- 150 tons
- 70,000 l
- 28000 l
|
- 2
- 2
- 1
- 2
- 1
- 2
- 2
- 2
- 5
- 7
- 11
- 3
- 3
- 4
- 4
- 1
- 5
- 2
- 6
- 3
- 1
- 4
- 1
- 2
- 2
- 2
- 1
- 1
- 1
- 19
- 14
- 32
- 5
- -
- 4
- -
- -
- 84
- 77
- 13
- 1
|
- General Manager
- General Manager - Mine Projects
- General Manager Operations
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Dozer^
- Drill (blasthole)^
- Grader^
- Loader^
- Loader^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- CEO
- Consultant - Mining, Infrastructure & Costs
- VP Environment & Sustainability
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (blasthole)
- Drill^
- Loader (FEL)
- Shovel (rope)
- Shovel (rope)
- Shovel (rope)
- Truck (haul)
- Truck (haul)^
|
|
- 12.25 inch
- -
- 30 cu. yd
- 56 cu. yd
- 58 cu. yd
- 44 cu. yd
- 320 tons
- -
|
|
- Chief Operating Officer
- Environmental Manager
- Mill Maintenance Superintendent
- Mine Operations Superintendent
- Mining Manager
- Technical Services Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Crane
- Feeder Breaker
- Grader
- Scoop Tram
- Shuttle car
|
|
|
|
- Environmental Manager
- Managing Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator^
- Excavator^
- Truck (dump)^
|
|
|
|
- Exploration Manager
- General Manager Projects
- Managing Director and CEO
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Bolter
- Continuous Miner
- Continuous Miner
- Drill
- Excavator
- Loader
- Loader
- Loader
- Load-Haul-Dump (LHD)
- Personnel Carrier
- Scaler
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................

|
|
|
- Maintenance Manager
- Maintenance Planner
- Plant General Manager
- Plant Manager
- Sr. Environmental Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Continuous Miner
- Continuous Miner
- Feeder Breaker
- Grader^
- Loader (FEL)^
- Shuttle car
- Shuttle car
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
|
|
|
- Consultant - Recovery Methods
- Engineering Manager
- Environmental Superintendent
- Mining Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 312 HP
- 436 HP
- 600 HP
- 562 HP
- 6.75 inch
- 4 cu. yd
- 304 HP
- 16 cu. yd
- 4 cu. yd
- 45 tons
- 100 tons
- 8000 gal.
|
|
- Director of Operations
- Environmental Superintendent
- General Manager
- Process Manager
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Loader
- Loader
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (hydraulic)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Environmental Manager
- Mineral Resource Manager
- Process Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Drill jumbo (two boom)^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Truck (underground)^
|
- .................................
 - -
- .................................
 - .................................
 - .................................

|
|
|
- President & General Manager
|
- ..............................

|
|
............
|
|
............................
|
- Drill (blasthole)^
- Loader^
- Truck (haul)^
|
- -
- .................................
 - .................................

|
- 6.25 inch
- 16 cu. yd
- 100 tons
|
|
- Chief Operating Officer
- Consultant - Mining
- Consultant - Recovery Methods
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (crawler)^
- Drill (blasthole)^
- Grader^
- Loader^
- Scraper^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - -
- .................................
 - -
- -
|
|
|
- Consultant - Mining, Infrastructure & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- -
- -
- -
- 165 mm
- 4.5 m3
- 8 m3
- -
- -
- -
- -
- -
- 90 t
- 40 t
- -
- -
|
|
- Chief Operating Officer
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Truck (underground)^
|
|
|
|
- Chief Operating Officer
- Consultant - Infrastructure
- Consultant - Mining & Costs
- President and CEO
- VP Environment & Sustainability
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Truck (haul)
- Truck (haul)
- Truck (underground)
|
- .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- President and CEO
- Project and Corporate Development Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- President and CEO
- VP Operations
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- ANFO Loader
- Cable bolter
- Drill
- Drill
- Drill (long hole)
- Loader
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Alternate Underground Manager
- General Manager
- HSE & Community Manager
- Mining Manager
- Technical Services Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer^
- Drill (blasthole)^
- Grader^
- Loader^
- Shovel (rope)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Recovery Methods
- President and CEO
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill
- Drill
- Jumbo
- Load-Haul-Dump (LHD)
- Rockbreaker
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck (underground)
|
- -
- .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - -
- -
- -
- .................................

|
- -
- -
- -
- -
- -
- -
- 15 cu. yd
- 6 cu. yd
- 8 cu. yd
- 11 cu. yd
- 45 t
|
|
- Chief Metallurgist
- Engineering Superintendent
- General Manager
- VP Exploration
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Loader (FEL)^
- Loader (FEL)^
- Truck (haul)^
- Truck (water)^
|
|
- 325 kW
- 140 mm
- 8 m3
- 3.8 m3
- 3 m3
- 14 m3
- 4.5 m3
- 91 t
- 35000 l
|
|
- Chief Executive Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill^
- Loader - Tool Carrier^
- Loader^
- Load-Haul-Dump (LHD)^
- Shotcreter^
- Trans Mixer^
- Truck (fuel / lube)^
- Truck (underground)^
- Truck (underground)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................

|
|
|
- Operations Superintendent
- Project Superintendent
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill (blasthole)^
- Drill (blasthole)^
- Grader^
- Loader (FEL)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - -
- -
- .................................
 - -
- -
- -
|
- 4.4 m blade
- 259 mm
- 114 mm
- 4.9 m blade
- 12 m3
- 136 t
- 90 t
|
|
- Consultant - Recovery Methods & Costs
- President and COO
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Crane
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Drill (blasthole)
- Grader
- Grader
- Jumbo
- Loader
- Loader
- Loader
- Loader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Personnel Carrier
- Rock bolter
- Scissor Lift
- Shotcreter
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel (rope)
- Shovel (rope)
- Trans Mixer
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (underground)
- Truck (water)
- Truck (water)
- Truck (water)
- Truck (water)
- Truck (water)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 3.5 cu. yd
- -
- -
- 9 m3
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 290 t
- -
- -
- -
- 30 t
- -
- -
- -
- -
- -
|
- 3
- 3
- 6
- 3
- 1
- 6
- 2
- 5
- 6
- 2
- 6
- 4
- 4
- 4
- 4
- 2
- 3
- 1
- 40
- 12
- 9
- 2
- 1
- 1
- 1
- 2
- 4
- 3
- 27
- 2
- 4
- 2
- 12
- 1
- 2
- 3
- 1
- 2
|
- Engineering Superintendent
- Environmental Manager
- General Manager
- Health & Safety Manager
- Maintenance Planner
- Maintenance Superintendent
- Mineral Resource Manager
- Plant Manager
- Process Operations Superintendent
- Underground Mining Manager
- Underground Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Backhoe^
- Bolter^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Dozer (rubber tire)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill^
- Forklift^
- Grader^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Rockbreaker^
- Scissor Lift^
- Shotcreter^
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Tire manipulator^
- Truck (boom)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - -
- .................................
 - -
- .................................
 - -
- -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- -
|
- -
- -
- -
- 350 HP
- 350 HP
- -
- -
- 110 kW
- 203 mm
- -
- -
- -
- 6 m3
- -
- 95 kW
- -
- -
- -
- 6 m3
- 10.8 m3
- -
- -
- 63 t
- -
- 45 t
- -
- -
|
- 4
- 1
- 5
- 3
- 1
- 1
- 2
- 5
- 4
- 1
- 1
- 1
- 1
- 8
- 8
- 1
- 2
- 2
- 2
- 1
- 1
- 1
- 12
- 1
- 4
- 1
- 1
|
- Consultant - Mining
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Director of Environment & Sustainability
- Director of Exploration
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- GM - Project Development & Strategy
- GM Environment & Community Relations
- Health & Safety Manager
- Managing Director and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Excavator
- Grader
- Shovel (hydraulic)
- Shovel (rope)
- Truck (haul)
- Truck (haul) - EAV
- Truck (haul) - EV
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Environmental Manager
- Haulage Manager
- Heavy Mining Equipment Manager
- Mine Scheduling Superintendent
- Planning Superintendent
- Site Superintendent
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner^
- Longwall mining unit^
- Roadheader^
|
|
|
|
- Chief Operating Officer
- President and CEO
- Principal author (consultant)
|
- ..............................
 - ..............................
 - ..............................

|
 - -

|
............
|
|
............................
|
- Loader
- Truck (underground)
|
- .................................
 - .................................

|
|
|
- Chief Metallurgist
- Environmental Manager
- General Manager
- Logistics Manager
- Mobile Maintenance Superintendent
- Process Manager
- Ventilation Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Excavator^
- Loader (FEL)^
- Truck (dump)^
|
|
|
|
- Environmental Manager
- General Manager
- General Manager Operations
- Health & Safety Manager
- Managing Director
|
- Amadou Diadie Makalou
- Seydou Semega
- Mohamed Sid'Ahmed
- Toutou Dabo
- Simon Hay
|
|
+61-8-6314-4500
|
|
............................
|
- Dozer (crawler)
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Truck (dump)
- Truck (dump)
- Truck (water)
|
- .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- General Manager
- Metallurgical Superintendent
- Mining Manager
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Loader (FEL)
- Loader (FEL)
- Truck (dump)
- Truck (dump)
- Truck (dump)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- 12.3 m3
- 12.3 m3
- 100 t
- 100 t
- 100 t
|
|
- Engineering Superintendent
- Fixed Plant Operations Manager
- Maintenance Superintendent
- Mine Superintendent
- Mine Utilities Superintendent
- Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Crane^
- Crane^
- Deck & Boom Trucks^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader^
- Rockbreaker^
- Shovel (hydraulic)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - -
- -
- -
- -
- .................................
 - -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
|
- -
- 50 t
- 10 t
- -
- -
- -
- -
- -
- -
- -
- -
- 40 t
- -
- 200 t
- -
- -
- 520 t
- -
- 228 t
- -
- -
|
|
- Chief Geologist
- President and CEO
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Bulldozer^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Truck (haul)^
- Truck (water)^
|
- Caterpillar D6^
- Atlas Copco AC-ROC D55152^
- Volvo 460^
- Caterpillar 336^
- Caterpillar 12M^
- Caterpillar 980H^
- Volvo A35C^
- -
|
|
|
|
|
|
+1-819-797-4144
|
|
............................
|
|
- -
- .................................

|
|
|
- Chief Technical Officer
- Construction Manager
- Maintenance & Engineering Manager
- Managing Director
- Mine Planning Superintendent
- Mine Production Manager
- Mineral Separation Plant Area Manager
- Mobile Equipment Maintenance Manager
- Production Superintendent
- Safety Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- ANFO Loader^
- Backhoe^
- Bolter^
- Bulldozer^
- Crane^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill (long hole)^
- Excavator^
- Grader^
- Grader^
- Jumbo^
- Loader^
- Loader^
- Loader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Scissor Lift^
- Shotcreter^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
|
- -
- .................................
 - -
- .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 4.5 cu. yd
- 6.5 cu. yd
- -
- -
- -
- -
- -
- -
- -
- -
- 34 cu. yd
- -
|
- 1
- 1
- 1
- 2
- 3
- 1
- 1
- 3
- 1
- 1
- 1
- 1
- 2
- 4
- 1
- 1
- 2
- 3
- 1
- 1
- 1
- 1
- 2
- 1
- 24
- 2
- 4
- 2
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Mine Operations Manager
- Site Manager
- Technical Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter
- Drill
- Grader
- Load-Haul-Dump (LHD)
- Trans Mixer
- Truck (underground)
- Truck (underground) - AV ^
- Truck (water)
|
- -
- -
- -
- -
- -
- -
- .................................
 - -
|
|
|
- Alternate Underground Manager
- Commercial Manager
- Maintenance Superintendent
- Mine Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
|
- ..............................

|
|
|
|
............................
|
- Dozer (crawler)^
- Drill (blasthole)^
- Grader^
- Loader (FEL)^
- Truck (haul)^
|
|
- 310 HP
- 114 mm
- 4.3 m
- 7 m3
- 55 t
|
|
- Consultant - Infrastructure
- Logistics Manager
- President and CEO
- Sr. Vice President Operations
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Concrete sprayer
- Drill (long hole)
- Explosives Charger
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Locomotive
- Raise boring rig
- Truck (haul)
|
|
|
|
- Buyer
- Environmental & Permitting Manager
- General Superintendent
- Mine Engineering Superintendent
- Mine Production Manager
- Production Superintendent
- Safety & Compliance Manager
- Sr. Vice President Underground Mine
- Underground Mine Engineer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Concrete sprayer^
- Dozer (crawler)^
- Drill^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Telescopic Handler^
- Trans Mixer^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
- ..............................
 - ..............................

|
|
|
|
............................
|
- Bolter - EAV ^
- Borer Miner^
- Continuous Miner^
- Forklift^
- Grader - EV ^
- Loader (mini)^
- Load-Haul-Dump (LHD) - EAV ^
- Personnel Carrier^
- Scaler - EV ^
- Scaler^
- Scissor Lift^
- Truck (boom) - EV ^
- Truck (haul) - EAV ^
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Mining, Infrastructure & Costs
- Project Manager
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Cable bolter^
- Compactor^
- Crane^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Explosives Charger^
- Forklift^
- Forklift^
- Grader^
- Grader^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader^
- Loader^
- Load-Haul-Dump (LHD) - EV ^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Raise boring rig^
- Rockbreaker^
- Scissor Lift^
- Shotcreter^
- Shovel (hydraulic)^
- Telescopic Handler^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- .................................

|
- -
- -
- -
- -
- 150 t
- 60 t
- -
- -
- -
- -
- 251 mm
- -
- -
- 203 mm
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 14 t
- 14 t
- -
- 5 ft
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 90 t
- -
- -
- -
- -
- -
|
- 6
- 9
- 2
- 2
- 1
- 1
- 3
- 2
- 3
- 2
- 5
- 4
- 5
- 2
- 2
- 2
- 1
- 3
- 7
- 3
- 10
- 3
- 2
- 4
- 2
- 1
- 3
- 1
- 12
- 3
- 4
- 4
- 2
- 5
- 4
- 2
- 3
- 6
- 6
- 2
- 4
- 7
- 14
- 7
- 17
- 2
- 3
|
- Engineering and Infrastructure Manager
- Engineering Manager
- Environmental Manager
- Health & Safety Manager
- Mine Planning Manager
- Project Manager
- Senior Director - Mining
- Site Manager
- VP, Processing & Metallurgy
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill jumbo (two boom)^
- Grader^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Exploration Manager
- President and CEO
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill jumbo (two boom)^
- Drill^
- Loader^
- Truck (dump)^
|
|
|
|
- Chief Development Officer
- Environmental & Community Superintendent
- General Manager
- Mining Manager
- Mining Projects Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Geologist
- Chief Operating Officer
- Construction Manager
- Consultant - Mining
- Project Development Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Borer Miner
- Continuous Miner
|
- .................................
 - .................................

|
|
|
- Maintenance Manager
- Procurement Manager
- Production Superintendent
- Safety Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (rubber tire)
- Dozer (rubber tire)
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Grader
- Loader
- Loader
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Executive Officer
- General Manager Operations
- General Manager Projects
- Mine Planning Superintendent
- Mining Manager
- Processing Superintendent
- Sr. Mine Engineer
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Bulldozer
- Drill (blasthole) - EV
- Drill (blasthole) - EV
- Grader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Scraper
- Shovel (rope) - EV
- Shovel (rope) - EV
- Shovel (rope) - EV
- Truck (dump)
- Truck (dump)
- Truck (water)
|
- -
- -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- -
- -
- 311 mm
- 311 mm
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
|
- Engineering Superintendent
- Health and Safety Director
- President
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Concrete sprayer
- Dozer (crawler)
- Drill (long hole)
- Drill (long hole)
- Excavator
- Grader
- Jumbo
- Jumbo
- Jumbo
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD) - AV
- Rock bolter
- Rock bolter
- Rock bolter
- Rock bolter
- Rock bolter
- Rock bolter
- Rock bolter
- Telescopic Handler
- Telescopic Handler
- Trans Mixer
- Trans Mixer
- Truck (boom)
- Truck (fuel / lube)
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 1
- 2
- 1
- 1
- 1
- 2
- 1
- 1
- 2
- 2
- 5
- 4
- 1
- 2
- 1
- 1
- 1
- 1
- 1
- 5
- 1
- 1
- 2
- 1
- 2
- 2
- 1
- 3
- 5
- 2
- 5
- 4
|
- Environmental Manager
- General Manager
- Mill Manager
- Technical Services Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Continuous Miner
- Continuous Miner
- Continuous Miner
- Load-Haul-Dump (LHD)
- Shuttle car
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
|
|
|
- Consultant - Recovery Methods
- Engineering Manager
- Mining Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer (crawler)^
- Drill
- Drill
- Excavator
- Excavator^
- Excavator^
- Grader
- Grader^
- Hammer crusher^
- Loader^
- Shovel
- Telescopic Handler^
- Truck (boom)^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - -
- -
|
- -
- 630 HP
- -
- -
- 15 m3
- 49 t
- 90 t
- -
- 16 ft
- -
- -
- 29 m3
- -
- 28 t
- 10 t
- -
- 216 t
- 216 t
- -
- -
|
|
- Chief Metallurgist
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- General Manager
- Maintenance Planner
- Maintenance Superintendent
- Mine Operations Superintendent
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Grader
- Jumbo^
- Scoop Tram
- Scoop Tram
- Scoop Tram^
- Scoop Tram^
- Truck (haul)
- Truck (haul)^
|
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................

|
- 250 HP
- -
- 2.5 cu. yd
- -
- 0.75 cu. yd
- -
- -
- -
|
|
|
|
|
|
|
............................
|
- Continuous Miner
- Dozer (rubber tire)
- Dragline
- Excavator
- Excavator
- Excavator
- Excavator - AV
- Grader
- Truck (haul)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- Engineering Manager
- Environmental Manager
- Executive General Manager
- General Manager
- Maintenance Planner
- Maintenance Superintendent
- Production Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
- Mine Planning Manager
- Mine Superintendent
- Mineral Resource Manager
- Operations Manager
- Plant Manager
- Plant Superintendent
- Superintendent Logistics
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Drill
- Longwall mining unit
|
- -
- .................................
 - -
|
|
|
- Electrical Engineering Manager
- General Manager/SSE
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Bulldozer^
- Crane^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Truck (fuel / lube)^
- Truck (water)^
- Truck^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 38 t
- 18 t
- 11 t
- 5.5 inch
- 5.5 inch
- 70 t
- 45 t
- 35 t
- 20 t
- 16 t
- 18 t
- 6000 l
- 22000 l
- 40 t
|
|
- Consultant - Recovery Methods
- Director of Environment & Sustainability
- Director of Operations
- Director of Processing
- Mining Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader^
- Bulldozer^
- Bulldozer^
- Crane^
- Drill (blasthole)^
- Excavator^
- Forklift^
- Grader^
- Loader^
- Rockbreaker^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................

|
- -
- -
- -
- 30 t
- 4.5 inch
- -
- -
- -
- -
- -
- -
- 40 t
- -
- 20,000 l
|
|
- Consultant - Recovery Methods
- Director - HSE
- Director of Processing
- Mining Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
|
|
............
|
|
|
- Dozer (crawler)
- Drill
- Drill
- Drill (blasthole)
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- Caterpillar D10T
- Sandvik Leopardâ„¢ DI650i
- Sandvik Pantera DP1500i
- Sandvik DR410i
- Komatsu PC4000
- Komatsu PC1250
- Caterpillar 16M
- Komatsu WA900
- Caterpillar MT4400
- Komatsu 830E
- Caterpillar 785C
|
|
|
- General Manager
- Occupational Health & Safety Manager
- Open Pit Project Engineer
- Processing Manager
- Supply Chain Manager
|
- Russell Cole
- Zoe Green
- Kiran Bandla
- Tristan Freemantle
- Mark Dominy
|
|
+61-(08)-9211-9200
|
|
............................
|
- Bolter
- Dozer (crawler)
- Drill
- Drill
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (two boom)
- Excavator
- Excavator
- Grader
- Grader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Load-Haul-Dump (LHD)
- Scissor Lift
- Shotcreter
- Truck (dump)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................

|
- -
- 70 t
- -
- -
- 89 mm
- 762 mm
- -
- 6.9 m3
- 2.5 m3
- -
- -
- 6.4 m3
- 3 m3
- 2.5 m3
- 6.3 m3
- -
- -
- 36 t
- -
|
|
- General Manager
- Mine Manager
- Plant Maintenance Manager
- Process Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill
- Drill
- Drill
- Drill
- Drill (long hole)
- Scissor Lift
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (underground)
|
- .................................
 - -
- .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - -
- .................................

|
- 16 ft
- 12 ft
- 14 ft
- 10 ft
- -
- 14 ft
- -
- 128 HP
- 2 cu. yd
- 2 cu. yd
- 3.5 cu. yd
- 3.5 cu. yd
- 1.25 cu. yd
- 1.5 cu. yd
- 2 cu. yd
- 4.5 cu. yd
- 1 cu. yd
- 3.5 cu. yd
- 110 HP
- 113 HP
- 7 m3
- 15 t
|
|
- Plant Maintenance Manager
- Process Plant Manager
- Underground Planning Superintendent
- VP Operations & Country Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Concrete sprayer
- Concrete sprayer
- Dozer
- Dozer^
- Dozer^
- Drill
- Drill
- Drill (long hole)
- Drill jumbo (two boom)
- Excavator^
- Excavator^
- Grader
- Grader^
- Grader^
- Loader
- Loader
- Loader (FEL)^
- Loader^
- Load-Haul-Dump (LHD)
- Scaler
- Scaler
- Telescopic Handler
- Telescopic Handler
- Trans Mixer
- Trans Mixer
- Truck (dump)
- Truck (haul)^
- Truck (haul)^
- Truck (water)
- Truck (water)
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
|
- -
- -
- -
- 3.88 m
- -
- -
- -
- -
- -
- -
- -
- 1.19 m3
- -
- -
- -
- 3.8 m3
- 0.5 m3
- -
- -
- 4 m3
- 0.96 m3
- 0.96 cu. yd
- -
- -
- 4 m3
- 4 m3
- 15 m3
- -
- -
- 20 m3
- 20 m3
- -
|
- 1
- 1
- 1
- 1
- 1
- 1
- 2
- 1
- 2
- 4
- 2
- 1
- 1
- 1
- 1
- 5
- 1
- 4
- 2
- 3
- 2
- 1
- 5
- 1
- 1
- 1
- 5
- 8
- 6
- 2
- 1
- 4
|
- Consultant - Mining
- Consultant - Recovery Methods
- General Manager
- Health, Safety & Environment Manager
- Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill - AV
- Drill (blasthole)
- Truck (haul) - AV
- Truck (water) - AV
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager Operations
- General Manager Projects
- Maintenance Manager
- Maintenance Planning Manager
- Maintenance Superintendent
- Mine Operations Manager
- Mobile Equipment Maintenance Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator^
- Excavator^
- Truck (haul)^
|
- -
- -
- .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - -
- .................................
 - -
- -
- .................................
 - -
- -
- -
- -
|
- 500 HP
- -
- -
- -
- 24 ft
- 43 cu. yd
- -
- 50 cu. yd
- 320 tons
- 40 t
- 20,000 gal.
|
|
- Consultant - Costs
- Consultant - Mining
- Health, Safety & Environment Manager
- Sr. Vice President Operations
- VP, Business Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Drill^
- Excavator^
- Excavator^
- Loader (FEL)^
- Truck (dump)^
- Truck (dump)^
- Truck (water)^
|
|
|
|
- Chief Operating Officer
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (blasthole)
- Drill (blasthole)^
|
- .................................
 - .................................

|
|
|
- Area Manager
- CHPP Superintendent
- Electrical Superintendent
- Environmental & Community Manager
- Maintenance Planning Superintendent
- Operations Manager/SSE
- Production Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor
- Dozer (crawler)
- Drill
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Loader (FEL)
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
|
|
|
- Consultant - Mining & Costs
- Engineering Superintendent
- Environmental Manager
- Health & Safety Superintendent
- Maintenance Planner
- Process Manager
- Project Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Drill (long hole)^
- Drill^
- Grader^
- Loader^
- Loader^
- Load-Haul-Dump (LHD)^
- Scissor Lift^
- Shotcreter^
- Trans Mixer^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Technical Officer
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Health & Safety Superintendent
- Process Manager
- Underground Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Dozer (rubber tire)^
- Drill^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Telescopic Handler^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- 115 mm
- 115 kW
- 6.9 m3
- 5.7 m3
- 5.8 m
- 25.2 m3
- -
- 9500 l
|
|
- Chief Technical Officer
- Consultant - Recovery Methods
- President
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Continuous Miner
- Crane
- Dozer
- Feeder Breaker
- Forklift
- Grader
- Longwall mining unit
- Personnel Carrier
- Scoop Tram
- Scoop Tram - EV
- Shearer
- Shuttle car
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
|
|
|
- Business Improvement Manager
- Maintenance Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Truck (haul)^
- Truck (haul)^
|
|
- 310 HP
- 89 mm
- 152 mm
- 8 m3
- 2 m3
- 4.3 m
- 7 m3
- 4 m3
- 55 t
- 38 t
|
|
- Consultant - Costs
- Consultant - Infrastructure
- Consultant - Mining
- Consultant - Recovery Methods
- President and CEO
- Site Manager
- VP Environment & Sustainability
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Environmental & Permitting Manager
- President
- Underground Mine Engineer
|
- ..............................
 - ..............................
 - ..............................

|
- -
 - -
|
............
|
|
............................
|
- Continuous Miner
- Longwall mining unit
|
|
|
|
- Chief Operating Officer
- Engineering Manager
- Plant Manager
- Safety Manager
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (crawler)^
- Drill (blasthole)^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (haul)^
|
- .................................
 - .................................
 - -
- -
- -
- -
- -
|
- 4 m blade
- 3.3 m blade
- 142 kW
- 2.5 m3
- 3 m blade
- 3.5 m3
- 16 m3
|
|
- Consultant - Mining & Costs
- General Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Operating Officer
- Director of Mine Maintenance
- Surface Facilities Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Crane^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Drill (blasthole)^
- Forklift^
- Grader^
- Loader^
- Telescopic Handler^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- -
- -
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- -
|
- -
- 40 tons
- 50 tons
- 300 kW
- 230 kW
- 8.75 inch
- -
- 14 inch
- 15.2 cu. yd
- -
- 10 tons
- -
- 100 tons
- -
- 20,000 gal.
|
|
- CEO
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager
- General Manager Operations
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Cable bolter^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Explosives Charger^
- Grader^
- Loader^
- Load-Haul-Dump (LHD) - AV ^
- Scaler^
- Shotcreter^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Managing Director
|
- ..............................
 - ..............................

|
|
|
|
............................
|
- Shovel (hydraulic)^
- Truck (dump)^
|
|
|
|
- Chief Executive Officer
- Project Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Environmental & Permitting Manager
- President
- Underground Mine Engineer
|
- ..............................
 - ..............................
 - ..............................

|
- -
 - -
|
............
|
|
............................
|
- Drill (long hole)
- Jumbo
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Locomotive
- Telescopic Handler
- Truck (dump)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
- -
- -
- -
- 6 cu. yd
- 3.5 cu. yd
- -
- -
- -
- -
- -
|
|
- Consultant - Recovery Methods
- Maintenance & Engineering Manager
- Maintenance Manager
- Mine Planning Manager
- Plant Maintenance Manager
- Technology Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader (FEL)^
- Rockbreaker^
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
|
- -
- -
- -
- -
- 75 t
- 90 t
- 70 t
- 30 t
- -
- -
- -
- -
- -
- 90 t
- -
- -
- -
|
|
- Chief Executive Officer
- General Manager
- Maintenance Planning Manager
- Metallurgical Superintendent
- Sr. Project Engineer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Backhoe
- Bolter
- Bolter
- Cable bolter
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Drill
- Drill
- Drill
- Drill (long hole)
- Drill (long hole) - AV
- Drill jumbo (two boom)
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Grader
- Grader
- Grader
- Jumbo
- Loader
- Loader
- Loader (FEL)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Rockbreaker
- Scissor Lift
- Scissor Lift
- Scoop Tram - AV
- Trans Mixer
- Truck (boom)
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 6.75 inch
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 9 cu. yd
- 7 cu. yd
- 7 cu. yd
- 2 cu. yd
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 30 t
- 40 t
- -
- 26 t
- -
|
- 2
- 1
- 4
- 1
- 1
- 1
- 1
- 1
- 1
- 2
- 1
- 5
- 1
- 1
- 2
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 2
- 1
- 1
- 1
- 1
- 7
- 3
- 1
- 7
- 1
- 6
- 1
- -
- 2
- 1
- 1
- 2
- 5
- 6
- 3
- 8
- 2
- 1
|
- Engineering Superintendent
- General Manager
- Health & Safety Manager
- Human Resource, Safety & Training Manager
- Maintenance Manager
- Mine Operations Manager
- Mineral Resource Manager
- Supply Chain Manager
- Underground Maintenance Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
|
|
|
- Load-Haul-Dump (LHD)
- Truck (underground)
|
|
|
|
- Chief Geologist
- Chief Mining Engineer
- Mine Manager
- Mine Production Superintendent
- Supply Chain Superintendent
|
- Nyssa Loeppke
- Dino Febiawan
- Dave Loring
- Josh Gresham
- Catherine Patti
|
|
+1-303-569-3221
|
|
............................
|
|
|
|
|
- Construction Manager
- General Manager
- Managing Director
- Mining Manager
- Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Explosives Charger
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Telescopic Handler
- Truck (underground)
|
- -
- -
- -
- .................................
 - -
- -
- -
- -
|
|
|
- Maintenance Planner
- Mine General Manager
- Mining Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Grader
- Jumbo
- Loader
- Loader
- Shotcreter
- Truck (service)
- Truck (service)
- Truck (underground)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- Environmental Superintendent
- Project Director
- Sustainability & Environmental Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Truck (dump) - EV ^
- Truck (haul) - EV ^
|
|
|
|
- Engineering Manager
- Planning Superintendent
- President
- Procurement Manager
- Procurement Specialist
- Technical Services Manager
- Technology Manager
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Mine Planning Manager
- Mine Superintendent
- Open Pit Superintendent
- Plant Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Loader - Tool Carrier^
- Loader (FEL)^
- Shovel^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- 410 HP
- 354 HP
- 6.25 inch
- 188 HP
- 5.7 m3
- 265 HP
- -
- 800 HP
- 10 m3
- 20,000 l
- 100 tons
- 50 tons
- 250 HP
- -
|
|
- Chief Executive Officer
- VP Exploration
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Drill (blasthole)
- Grader
- Loader
- Shovel (rope) - EV
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 57 cu. yd
- -
- 16 ft
- 37 cu. yd
- 38 cu. yd
- 240 tons
|
|
- Buyer
- Environmental Manager
- Plant Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill jumbo (two boom)^
- Drill^
- Drill^
- Grader^
- Grader^
- Loader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Rock bolter^
- Shovel^
- Truck (haul)^
- Truck (underground)^
|
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- -
- .................................

|
- -
- -
- 165 mm
- 115 mm
- -
- -
- 6.5 m3
- 3.7 m3
- 2 m3
- -
- 6.5 m3
- 55 t
- 20 t
|
|
- VP Exploration
- VP, Corporate Development
- VP, Health Safety and Environment
|
- ..............................
 - ..............................
 - ..............................

|
 - -

|
............
|
|
............................
|
- Backhoe
- Compactor
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Drill
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Grader
- Grader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader (FEL)
- Truck
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (fuel / lube)
- Truck (fuel / lube)
- Truck (water)
- Truck (water)
|
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- -
- -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 1
- 1
- 2
- 6
- 5
- 1
- 2
- 1
- 2
- 2
- 2
- 1
- 2
- 4
- 1
- 9
- 2
- 2
- 1
- 1
- 1
- 1
- 2
- 1
- 2
- 3
- 1
- 43
- 16
- 2
- 3
- 1
- 1
- 1
|
- Commercial Manager
- Equipment Maintenance Planner
- Fixed Plant Maintenance Manager
- Maintenance Superintendent
- Mobile Maintenance Superintendent
- Planning Superintendent
- Processing Manager
- Senior Maintenance Planner
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill (blasthole)^
- Drill jumbo (two boom)^
- Excavator
- Excavator
- Excavator^
- Grader
- Loader
- Loader
- Loader - Tool Carrier^
- Load-Haul-Dump (LHD)^
- Truck
- Truck (dump)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- .................................

|
- -
- -
- -
- 120 t
- 80 t
- -
- -
- -
- -
- -
- 10 t
- 60 t
- 91 t
- 40 t
- -
|
|
- Chief Operating Officer
- General Manager Operations
- Managing Director
- Open Pit Mine Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)^
- Dozer (rubber tire)
- Dozer (rubber tire)^
- Drill - EV
- Grader
- Loader (FEL)
- Loader (FEL)^
- Shovel - EV ^
- Shovel (rope) - EV
- Shovel (rope) - EV
- Shovel (rope) - EV
- Shovel (rope) - EV
- Truck (haul)
- Truck (haul) - AV
- Truck (water)
|
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- Buyer
- Engineering, Maintenance & Asset Manager
- Environmental Superintendent
- Maintenance Planning Superintendent
- Mill Operations Superintendent
- Mine Engineering Superintendent
- Mine Operations Superintendent
- Project Manager
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Crane^
- Drill (long hole)^
- Drill (long hole)^
- Drill jumbo (single boom)^
- Drill jumbo (two boom)^
- Grader^
- Loader (FEL)^
- Personnel Carrier^
- Personnel Carrier^
- Rockbreaker^
- Scaler^
- Scaler^
- Scissor Lift^
- Scissor Lift^
- Scoop Tram^
- Scoop Tram^
- Scoop Tram^
- Scoop Tram^
- Shotcreter^
- Shotcreter^
- Trans Mixer^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- 3.8 m3
- -
- -
- -
- -
- -
- -
- -
- 9.4 cu. yd
- 6 cu. yd
- 4 cu. yd
- 9 cu. yd
- -
- -
- -
- -
- 20 m3
- 20 m3
|
- 2
- 3
- 1
- 5
- 2
- 2
- 2
- 1
- 1
- 3
- 3
- 3
- 2
- 2
- 1
- 2
- 6
- 2
- 2
- 3
- 1
- 2
- 5
- 2
- 5
- 2
|
- Consultant - Costs
- Consultant - Mining
- Consultant - Recovery Methods
- Mineral Resource Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill^
- Drill^
- Excavator^
- Explosives Charger^
- Grader^
- Jumbo^
- Loader (FEL)^
- Loader^
- Loader^
- Truck (dump)^
- Truck (underground)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager Operations
- Managing Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator^
- Excavator^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................

|
|
|
- Chief, Procurement
- General Manager Projects
- Head of HSE & Quality
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Bulldozer
- Compactor
- Compactor
- Drill
- Excavator
- Excavator
- Grader
- Grader
- Loader
- Loader
- Truck (dump)
- Truck (dump)
- Truck (fuel / lube)
- Truck (fuel / lube)
- Truck (service)
- Truck (service)
- Truck (water)
- Truck (water)
|
|
|
- 15
- 7
- 4
- 7
- 3
- 17
- 15
- 3
- 8
- 4
- 7
- 57
- 60
- 6
- 6
- 6
- 14
- 6
- 4
|
- Chemical Laboratory Manager
- Mine Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter^
- Cassette Truck^
- Concrete sprayer^
- Drill (long hole)^
- Drill jumbo (two boom) - EV ^
- Drill^
- Excavator^
- Explosives Charger^
- Grader^
- Jumbo^
- Loader^
- Loader^
- Load-Haul-Dump (LHD)^
- Scissor Lift^
- Shotcreter^
- Telescopic Handler^
- Trans Mixer^
- Truck (haul)^
|
|
- -
- -
- -
- 89 mm
- -
- -
- -
- -
- -
- -
- 5 m3
- -
- 17 t
- -
- -
- -
- -
- 45 t
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- General Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- General Manager
- Health, Safety & Security Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Concrete sprayer^
- Drill jumbo (single boom)^
- Drill^
- Loader^
- Loader^
- Loader^
- Rock bolter^
- Truck (haul)^
|
|
- -
- -
- -
- 6 cu. yd
- 4 cu. yd
- 2 cu. yd
- -
- 30 tons
|
|
- Environmental & Permitting Manager
- VP, Technical Services
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Forklift
- Grader
- Load-Haul-Dump (LHD)
- Scissor Lift
- Truck (boom)
- Truck (dump)
- Truck (underground)
|
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- .................................

|
|
|
- Vice President and COO
- VP Exploration
- VP Operations
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill jumbo (single boom)
- Rockbreaker
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck (haul)
- Truck (haul)
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
|
|
- Vice President and COO
- VP Exploration
- VP Operations
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader
- Crane
- Excavator
- Excavator
- Loader (FEL)
- Truck (dump)
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill (long hole)
- Jumbo
- Load-Haul-Dump (LHD)
- Scissor Lift
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager
- Metallurgy Superintendent
- Mine General Superintendent
- Superintendent Logistics
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Load-Haul-Dump (LHD)^
- Scissor Lift^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager
- Mine General Superintendent
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Chief Executive Officer
- Fixed Plant Maintenance Manager
- General Manager Operations
- Mine Equipment Maintenance Manager
- Production Superintendent
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader^
- Crane^
- Dozer (crawler)^
- Drill (long hole)^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Shovel (hydraulic)^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - -
- .................................

|
- 71 kW
- -
- 447 kW
- 318 mm
- -
- 311 kW
- 391 kW
- 216 kW
- 1297 kW
- -
- -
- -
- 292 t
- -
- 10,0000 l
|
|
- CEO
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Cable bolter^
- Cable bolter^
- Crane^
- Crane^
- Drill (long hole) - AV ^
- Drill (long hole) - AV ^
- Drill jumbo (two boom) - AV ^
- Explosives Charger^
- Explosives Charger^
- Grader^
- Grader^
- Load-Haul-Dump (LHD) - AV ^
- Load-Haul-Dump (LHD) - AV ^
- Personnel Carrier^
- Personnel Carrier^
- Scissor Lift^
- Scissor Lift^
- Shotcreter^
- Tractor trailer^
- Tractor trailer^
- Truck (boom)^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
- Truck (water)^
|
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 11 cu. yd
- 14 cu. yd
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 50 t
- -
- -
|
- 2
- 5
- 2
- 1
- 2
- 2
- 5
- 3
- 4
- 2
- 1
- 1
- 1
- 4
- 4
- 3
- 2
- 6
- 4
- 2
- 1
- 1
- 2
- 2
- 2
- 1
- 5
- 1
- 1
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Director of Environment & Sustainability
- Director of Exploration
- President and CEO
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Continuous Miner^
- Loader
- Rock bolter
- Rock bolter^
- Scoop Tram
|
- -
- -
- .................................
 - -
- -
- -
|
|
|
- Logistics Manager
- Safety Director
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Dozer
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Truck (dump)
- Truck (service)
- Truck (water)
|
- -
- Sandvik DP1500
- Komatsu PC3000-8R
- Komatsu PC2000-8R
- Komatsu PC1250-8R
- Komatsu PC450
- Komatsu PC2000-11R
- Komatsu GD825A-2
- Komatsu WA500-6R
- Komatsu WA600-6R
- Komatsu WA800-3
- Komatsu HD785-7
- Komatsu HD465-7R
- Komatsu HD465-7R
|
- -
- -
- -
- -
- -
- -
- -
- -
- 30 t
- 50 t
- 100 t
- -
- -
- 50 m3
|
|
- Environmental Manager
- Fixed Plant Maintenance Superintendent
- Mining Manager
- Process Plant Superintendent
- Procurement Superintendent
- Regional Senior Buyer
|
- Ibrahim Kiemtore
- Ackim Lungu
- Alexis Brisebarre
- Halidou Kindo
- Nina Pascale Pare
- Gisèle Bountoulgou
|
|
+225-27-22-48-99-00
|
|
............................
|
- Backhoe^
- Crane^
- Dozer (crawler)^
- Drill (blasthole)^
- Grader^
- Loader^
- Tire manipulator^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- 500 HP
- -
- 300 HP
- 171 mm
- 260 HP
- -
- -
- -
- 560 HP
- -
- -
|
|
- CEO
- Sr. Vice President Operations
|
- ..............................
 - ..............................

|
- -

|
............
|
|
............................
|
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck (boom)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................

|
|
|
- General Manager
- Health, Safety & Security Manager
- Mine Manager
- Mine Superintendent
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill (long hole)
- Drill jumbo (single boom)
- Scissor Lift
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck (haul)
- Truck (haul)
|
- -
- -
- -
- -
- -
- -
- -
- -
- .................................

|
- -
- -
- -
- 2.7 t
- 4.2 cu. yd
- 2.2 cu. yd
- 6 cu. yd
- 15 t
- 25 t
|
|
- Laboratory Manager
- Mine Superintendent
- Occupational Health & Safety Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Loader
- Shovel (rope) - EV
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Crane^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (crawler)^
- Drill (blasthole)^
- Grader^
- Loader (FEL)^
- Shovel - EV ^
- Shovel - EV ^
- Shovel (hydraulic)^
- Tractor trailer^
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (water)^
|
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
|
- 5 m3
- 120 t
- 40 t
- -
- -
- -
- 254 mm
- -
- -
- -
- -
- -
- 150 t
- 350 t
- 90.5 t
- -
- 20,000 gal.
|
|
- CEO
- Chief Operating Officer
- Principal author (consultant)
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable reel truck
- Dozer (crawler)
- Dozer (rubber tire)
- Dragline
- Drill
- Excavator
- Grader
- Loader
- Scraper
- Shovel
- Truck
- Truck (service)
- Truck (water)
|
|
|
|
- Business Improvement Manager
- Engineering & Maintenance Manager
- Environmental & Community Manager
- General Manager
- Maintenance Superintendent
- Mine Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer
- Drill
- Drill
- Drill
- Drill - EV
- Grader
- Loader
- Loader (FEL)
- Loader (FEL)
- Shovel
- Shovel - EV
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................

|
|
|
- Maintenance Manager
- Metallurgy Superintendent
- Procurement Officer
- Superintendent Logistics
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer
- Dozer
- Dozer (rubber tire)
- Dozer (rubber tire)^
- Dozer^
- Drill
- Drill (blasthole)
- Drill (blasthole)^
- Excavator
- Excavator
- Excavator
- Grader
- Grader^
- Loader
- Loader^
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Truck (dump)
- Truck (dump)
- Truck (fuel / lube)
- Truck (haul)^
- Truck (water)
- Truck (water)
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 32 cu. yd
- 29 cu. yd
- 55 cu. yd
- -
- -
- -
- 40 cu. yd
- 47 cu. yd
- 55 cu. yd
- 200 t
- 320 t
- -
- 320 t
- -
- 20,000 gal.
- 40,000 gal.
|
- 1
- 1
- 2
- 1
- 2
- 6
- 1
- 7
- 8
- 2
- 2
- 2
- 2
- 3
- 1
- 1
- 1
- 2
- 6
- 20
- 1
- 26
- 1
- 1
- 3
|
- Health & Safety Manager
- President and CEO
- Process Maintenance Superintendent
- Process Manager
- Supply Chain Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Concrete sprayer^
- Dozer^
- Drill jumbo (two boom)^
- Forklift^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (underground)^
- Truck (water)^
|
|
- -
- -
- 105 HP
- -
- -
- -
- 4 cu. yd
- 4 cu. yd
- -
- -
- -
- -
- -
- 30 t
- -
|
|
- Chief Executive Officer
- Consultant - Costs
- Consultant - Recovery Methods & Costs
- Process Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Excavator
- Excavator
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Long Term Mine Planning Superintendent
- Managing Director
- Metallurgical Manager
- Metallurgical Superintendent
- Operations Manager - Tailings
- Procurement Superintendent
- Senior HSE Manager
- Sr. Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Truck (dump)^
- Truck (dump)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
- .................................

|
- -
- -
- -
- -
- 100 t
- -
- 300 t
- -
- -
- -
- -
- 17 t
- 90 t
- 140 t
- -
- 60 t
- -
|
|
- CEO
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- Environmental Manager
- Exploration Manager
- Study Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Backhoe loader^
- Backhoe^
- Crane^
- Crane^
- Crane^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Forklift^
- Forklift^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader (mini)^
- Shovel^
- Truck (boom)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
|
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
|
- -
- -
- 2.8 m3
- 25 t
- 60 t
- 150 t
- 66 t
- 47 t
- 127 mm
- 2 t
- 10 t
- 5 t
- 36 t
- -
- -
- 300 t
- -
- 90 t
- 30 t
- -
- 90 m3
|
|
- Chief Geologist
- Consultant - Costs
- VP, Project Management
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Concrete sprayer
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Drill (long hole)
- Drill jumbo (two boom)
- Drill jumbo (two boom)^
- Drill^
- Excavator
- Excavator
- Grader
- Grader
- Loader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)^
- Personnel Carrier
- Scissor Lift
- Scoop Tram
- Scoop Tram
- Trans Mixer
- Truck (haul)
- Truck (haul)
- Truck (underground)
- Truck (underground)^
- Truck (water)
|
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 8 cu. yd
- -
- -
- -
- 3.5 cu. yd
- 4 cu. yd
- -
- -
- -
- 40 t
- 60 t
- 50 t
|
- 2
- 1
- 1
- 1
- 3
- 1
- 4
- 1
- 2
- 1
- 1
- 1
- 1
- 1
- 12
- 7
- 1
- 5
- 1
- 1
- 1
- 5
- 8
- 15
- 10
- 1
|
- Chief Geologist
- Electrical Superintendent
- General Manager
- Maintenance Manager
- Maintenance Superintendent
- Materials Manager
- Safety Manager
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Backhoe^
- Bulldozer^
- Crane^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- -
- .................................
 - -
- -
- -
- .................................
 - -
- -
- -
- -
- .................................
 - -
- -
|
|
|
- CEO
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................
 - ..............................

|
- -
 
|
............
|
|
............................
|
|
- -
- .................................

|
|
|
- Mine Operations Manager
- Plant Manager
- Production Superintendent
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Crane^
- Dozer (crawler)^
- Drill (long hole)^
- Forklift^
- Loader^
- Load-Haul-Dump (LHD)^
- Telescopic Handler^
- Truck (haul)^
- Truck (service)^
|
- -
- -
- .................................
 - -
- -
- .................................
 - .................................
 - -
- .................................
 - -
|
- 1.1 cu. yd
- 45 tons
- -
- -
- 2.5 tons
- -
- -
- 4 tons
- 90 t
- -
|
|
- Consultant - Recovery Methods & Costs
- Executive Director (Development)
|
- ..............................
 - ..............................

|
|
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)^
- Excavator
- Excavator^
- Grader
- Grader^
- Loader (FEL)
- Loader (FEL)
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)^
- Truck (water)
- Truck (water)
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- 190 t
- -
- -
- -
- -
- -
- -
- 100 t
- 90 t
- 30,000 l
- 45000 l
- -
|
|
- Environmental Manager
- Executive General Manager
- Head of Mine Operations
- Maintenance Superintendent
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill - EV
- Excavator - EV
- Loader
- Loader - Tool Carrier
- Truck (haul) - EV
|
- -
- -
- -
- -
- -
- .................................

|
|
|
- Engineering Superintendent
- General Manager Operations
- General Manager Technical Services
- Maintenance & Reliability Manager
- Mine Planning Manager
- Planning Manager
- Plant Maintenance Manager
- Process Operations Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Dozer
- Dozer^
- Grader^
- Loader (FEL)
- Loader^
- Truck (haul)
- Truck (haul)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- Environmental Manager
- Executive General Manager
- Head of Mine Operations
- Mine Planning Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Loader (FEL)
- Truck (haul)
|
- .................................
 - .................................
 - .................................

|
|
|
- Crushing Manager
- General Manager - Technology
- General Manager Mining
- General Manager Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
- Chief Operating Officer
- Mining Manager
- Sr. Operations Manager
- Supply Chain General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Excavator^
- Grader^
- Truck (dump)^
- Truck (dump)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- Chief Executive Officer
- Engineering Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Drill (blasthole)
- Drill (blasthole)
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Loader (FEL)
- Truck (fuel / lube)
- Truck (haul)
- Truck (service)
- Truck (service)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- 16 cu. yd
- -
- 91 t
- -
- -
- -
|
|
- Environmental Manager
- General Manager
- Health & Safety Superintendent
- Process Superintendent
- Technical Services Manager
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer (rubber tire)
- Dragline
- Drill
- Drill
- Shovel (hydraulic)
- Shovel (rope)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Recovery Methods
- Environmental Superintendent
- General Manager
- Mine Manager
- Section Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Deck & Boom Trucks
- Excavator
- Grader
- Jumbo
- Loader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Personnel Carrier
- Scissor Lift
- Truck (fuel / lube)
- Truck (underground)
|
|
- -
- -
- -
- -
- -
- 6 cu. yd
- 3.5 cu. yd
- -
- -
- -
- 30 t
|
|
- General Manager
- Sr. Mine Engineer
- Surface Superintendent
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Excavator
- Grader
- Jumbo
- Loader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)^
- Scissor Lift
- Truck (boom)
- Truck (fuel / lube)
- Truck (underground)
|
|
- -
- -
- -
- -
- -
- 6 cu. yd
- 3.5 cu. yd
- 6 cu. yd
- -
- -
- -
- -
|
|
- Consultant - Recovery Methods
- General Manager
- Project Director
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Continuous Miner
- Feeder Breaker
- Scoop Tram
- Shuttle car
|
|
|
|
- Chief Operating Officer
- Director of Mine Maintenance
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Loader (FEL)
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager
- Health, Safety & Environment Manager
- Process Manager
- Process Operations Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill (long hole)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Raise boring rig
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Deputy General Manager
- General Manager
- Mine Manager
- Process Manager
- Processing Superintendent
- Supply Chain Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Bulldozer
- Excavator
- Truck (dump)
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Engineering, Maintenance & Asset Manager
- Environmental Superintendent
- Mining Manager
- Production Superintendent
- Technical Services Manager
- Technology Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Bolter
- Drill
- Excavator
- Forklift
- Grader
- Jumbo
- Loader (FEL)
- Load-Haul-Dump (LHD)
- Scaler
- Scissor Lift
- Shotcreter
- Telescopic Handler
- Trans Mixer
- Truck (haul)
|
|
|
|
- Country Manager
- General Manager Operations
- Maintenance Manager
- Plant Manager
- Procurement Specialist
- Senior Buyer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Commercial Manager
- Executive Director (Development)
- General Manager Exploration
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Deck & Boom Trucks^
- Dozer (crawler)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader^
- Tractor trailer^
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
|
|
- 28 t
- 317 HP
- 10 inch
- 8 inch
- 7 m3
- 90 t
- 4 t
- 14 ft
- 8.2 m3
- 271 HP
- 50 t
- 34000 l
- 45 t
- 7500 l
- 70 t
- -
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Borer Miner - EV
- Borer Miner - EV ^
- Cassette Truck^
- Continuous Miner^
- Feeder Breaker^
- Forklift^
- Grader^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scaler^
- Scissor Lift^
- Telescopic Handler^
- Truck (haul) - EV ^
- Truck (service)^
- Truck^
|
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
|
|
- Environmental Superintendent
- Maintenance Manager
- Process Engineering Manager
- Project Lead
- Site Superintendent
- Study Manager
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Excavator
- Excavator
- Excavator
- Loader (FEL)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (service)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - -
|
|
|
- Camp Manager
- Managing Director
|
- ..............................
 - ..............................

|
 - -
|
............
|
|
............................
|
- Bulldozer
- Excavator
- Truck (haul)
|
- .................................
 - .................................
 - .................................

|
|
|
- Chief Executive Officer
- Safety Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- CHPP Manager
- Electrical Engineering Manager
- General Manager/SSE
- Operations Manager
- Operations Superintendent
- Planning Manager
- Procurement Specialist
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Bolter
- Drill (long hole)
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scissor Lift
- Shotcreter
- Truck (underground)
|
|
- -
- -
- -
- -
- 2.5 cu. yd
- 6 cu. yd
- -
- -
- 30 t
|
|
- Chief Engineer
- Consultant - Recovery Methods
- Maintenance Planner
- Mine Manager
- Sr. Production Geologist
- Sr. Vice President Technical Services
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter^
- Dozer (crawler)^
- Drill (blasthole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Excavator^
- Excavator^
- Explosives Charger^
- Grader^
- Load-Haul-Dump (LHD)^
- Trans Mixer^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- 360 t
- 120 t
- -
- -
- -
- 10 m3
- 185 t
- 60 t
- -
|
|
- Exploration Manager
- Project Development Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Bulldozer^
- Drill^
- Drill^
- Excavator - EV ^
- Loader^
- Rockbreaker^
- Scraper^
- Truck (dump)^
- Truck (dump)^
- Truck (water)^
|
|
- 5 m3
- 1.5 m3
- 320 HP
- 250 mm
- 165 mm
- 10 m3
- 5 m3
- -
- 120 HP
- 91 t
- 15 t
- 21 t
|
|
- Director Business Development
- Procurement Specialist
- Supply Chain General Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Excavator
- Truck (haul) - EV
|
- Liebherr R9400
- Caterpillar 793
|
|
|
- Environmental Superintendent
- General Manager
- Haulage Superintendent
- Mine Equipment Maintenance Manager
- Processing Manager
|
- Dmitry Ivanov
- Annabelle Blom
- Leveson Sutton
- Pieter Fourie
- Pelin Eren
|
|
+618-6321-0000
|
|
............................
|
- Drill
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Loader
- Loader
- Loader
- Loader
- Truck (dump)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Project Manager
- Purchasing Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Surface miner
|
|
|
|
- General Manager
- General Manager Operations
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
- Consultant - Mining, Processing & Infrastructure
- Mine Manager
- Site Manager
- Sr. Vice President Operations
- VP, Business Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Cable bolter
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (single boom)
- Drill jumbo (three boom)
- Drill jumbo (two boom)
- Excavator
- Excavator
- Excavator
- Forklift
- Grader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Scaler
- Shotcreter
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- 13 t
- 25 t
- 29 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
|
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Drill^
- Forklift^
- Grader^
- Grader^
- Loader^
- Loader^
- Shovel (hydraulic)^
- Tire manipulator^
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- -
- -
- -
- -
- .................................
 - -
- .................................
 - .................................
 - -
- -
- .................................
 - -
- .................................
 - -
- .................................
 - -
- -
- -
- .................................
 - -
- -
|
- 90 t
- 1.9 m3
- 50 t
- 455 kW
- 640 kW
- 233 kW
- 560 kW
- 171 mm
- 90 mm
- 5.5 t
- 7.3 m
- 4.9 m
- 41 t
- 73 t
- 42 m3
- -
- 40 t
- 40 t
- -
- 360 t
- -
- 40,000 gal.
|
|
- Camp Manager
- Consultant - Costs
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Director of Environment & Sustainability
- Director of Operations
- Engineering Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader (mini)^
- Tire manipulator^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
- .................................

|
- -
- -
- -
- 200 mm
- 11 m3
- 16 inch
- 11.5 m3
- -
- -
- -
- 96 t
- -
- 30,000 l
|
|
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- President and CEO
|
- ..............................
 - ..............................
 - ..............................

|
  - -
|
............
|
|
............................
|
- Bolter^
- Bolter^
- Cable bolter^
- Drill (long hole)^
- Drill jumbo (single boom)^
- Drill jumbo (single boom)^
- Raise boring rig^
- Raise boring rig^
- Scaler^
- Scaler^
- Scissor Lift^
- Scoop Tram^
- Scoop Tram^
- Scoop Tram^
- Scoop Tram^
- Shotcreter^
- Shotcreter^
- Tractor trailer^
- Tractor trailer^
- Trans Mixer^
- Trans Mixer^
- Truck (service)^
- Truck (service)^
- Truck (underground)^
- Truck (underground)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - -
- -
- -
- -
|
- -
- -
- -
- -
- 16 ft
- 16 ft
- 2.44 m
- 1.83 m
- -
- -
- -
- 12 t
- 9 t
- 12 t
- 9 t
- -
- -
- -
- -
- -
- -
- -
- -
- 34 t
- 34 t
|
- 4
- 4
- 1
- 5
- 8
- 5
- 6
- 1
- 4
- 2
- 2
- 3
- 4
- 9
- 2
- 3
- 1
- 1
- 2
- 3
- 1
- 6
- 2
- 10
- 7
|
- Consultant - Mining
- Consultant - Recovery Methods
- Health, Safety & Environment Superintendent
- Mine Superintendent
- Plant Operations Manager
- VP, Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill (long hole)
- Drill (long hole)
- Explosives Charger
- Explosives Charger
- Grader
- Jumbo
- Loader
- Loader - Tool Carrier
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Truck (haul)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Development Officer
- Chief Technical Officer
- General Manager
- Mining Manager
- Processing Superintendent
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader^
- Dozer (crawler)^
- Excavator^
- Grader^
- Grader^
- Loader^
- Scraper^
- Scraper^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- -
|
|
|
- CEO
- Director Technical Services
- Exploration Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Excavator
- Excavator
- Excavator
- Excavator
- Loader (FEL)
- Loader (FEL)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager Operations
- Maintenance & Reliability Manager
- Mine Infrastructure Manager
- Mine Operations Director
- Sr. Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Shovel (rope)
- Truck (haul) - EV
|
- .................................
 - .................................

|
|
|
- General Manager
- Head of Engineering
- Manager - Mining Operations
- Mine Services Manager
- Mining Manager
- Plant Manager
- Sr. Mine Manager
- Sr. Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Grader^
- Loader (FEL)^
- Loader^
- Shovel (hydraulic)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - -
- -
- -
- -
- -
|
- -
- -
- -
- 105 mm
- -
- -
- -
- 3.8 m3
- -
- 30 t
- -
- 23000 l
|
|
- Consultant - Costs
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Country Manager
- President and CEO
- VP, Project Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Drill
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (service)
- Truck (water)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- 2.4 m3
- -
- 4.6 m3
- 6 m3
- -
- -
- 3 m3
- 30 t
- -
- 45 t
- 40 t
- -
- -
- -
- -
|
- 1
- 1
- 3
- 1
- 3
- 2
- 1
- 2
- 10
- 3
- 3
- 3
- 2
- 2
- 1
- 22
- 1
- 17
- 9
- 2
- 1
- 2
- 1
|
- Electrical Superintendent
- General Manager
- Head of Engineering
- Head of Mining
- HSE & Quality Manager
- Production Geologist
- Sr. Process Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Concrete sprayer
- Drill
- Drill (long hole)
- Drill jumbo (two boom)
- Explosives Charger
- Explosives Charger
- Grader
- Jumbo
- Loader
- Loader
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Raise boring rig^
- Truck (service)
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
- -
- -
- .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- -
- -
- .................................
 - -
- -
- .................................
 - -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 12 t
- 17 t
- 4 m
- -
- 45 t
- 30 t
- -
|
|
- Commercial Manager
- General Manager
- Head of Technical Services
- Maintenance & Engineering Manager
- Process Operations Superintendent
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Concrete sprayer^
- Drill (long hole)^
- Drill^
- Drill^
- Drill^
- Explosives Charger^
- Grader^
- Loader^
- Load-Haul-Dump (LHD)^
- Scissor Lift^
- Trans Mixer^
- Truck (haul)^
- Truck (underground)^
- Truck^
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - -
|
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- General Manager
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Drill jumbo (two boom)^
- Explosives Charger^
- Grader^
- Loader (mini)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Shotcreter^
- Telescopic Handler^
- Trans Mixer^
- Truck (haul)^
|
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
|
|
- Area Manager, Plant Operations
- Construction Superintendent
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Project Manager - Processing
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Drill (long hole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill jumbo (two boom)^
- Excavator
- Excavator
- Loader - Tool Carrier^
- Loader^
- Loader^
- Loader^
- Loader^
- Loader^
- Telescopic Handler^
- Truck (haul)^
- Truck (underground)^
- Truck (underground)^
- Truck (underground)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- 200 t
- 100 t
- -
- 12 t
- 7 t
- 7 t
- 15 t
- 15 t
- -
- 90 t
- 45 t
- 45 t
- 45 t
|
|
- Exploration Manager
- Managing Director
- Mineral Resource Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Rockbreaker^
- Truck (haul)^
|
|
- 50 t
- 50 t
- 20 t
- 200 t
- 100 t
- 28 t
- 100 t
- -
- 90 t
|
|
- Chief Operating Officer
- Consultant - Recovery Methods & Costs
- Plant Production Manager
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Drill
- Excavator
- Grader
- Jumbo
- Jumbo - EV
- Jumbo^
- Loader
- Loader
- Loader - AV
- Loader - Tool Carrier
- Loader^
- Rockbreaker^
- Shovel
- Truck (dump)
- Truck (dump)^
- Truck (underground)
- Truck (underground)
- Truck (underground)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- Chief Operating Officer
- General Manager - Growth
- Maintenance Manager
- Process Operations Superintendent
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable reel truck^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Loader^
- Loader^
- Shovel (hydraulic) - EV ^
- Tire manipulator^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- 271 HP
- 850 HP
- 752 HP
- -
- -
- 90 t
- 49 t
- 18 ft
- 30 m3
- -
- 271 HP
- 29 m3
- -
- 28 t
- -
- 320 t
- 150 t
- -
- 76000 l
|
|
- Chief Executive Officer
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill jumbo (two boom)
- Drill jumbo (two boom)^
- Explosives Charger^
- Grader^
- Loader (mini)^
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Scoop Tram
- Shotcreter^
- Telescopic Handler^
- Trans Mixer^
- Truck (haul)^
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 21 t
- -
- -
- -
- -
- -
- 12 m3
- 63 t
- -
- -
- -
|
- 2
- -
- 70
- 26
- 8
- 19
- 8
- 2
- 1
- 44
- 34
- 65
- -
- 36
- 26
- 10
- 44
- -
- 8
- 13
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Procurement Manager
- Project Manager - Processing
- Safety Manager
- Senior Plant Superintendent
- Sr. Mining Superintendent
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Truck (haul)
|
|
|
|
- Health & Safety Manager
- Mine Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Dozer^
- Excavator^
- Rockbreaker^
- Truck (dump)^
- Truck (water)^
|
|
|
|
- Chief Executive Officer
- Construction Manager
- Project Director
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Load-Haul-Dump (LHD)^
- Truck (underground)^
|
- .................................
 - -
|
|
|
- General Manager
- Managing Director and CEO
- Mine Operations Superintendent
- Surface Maintenance Superintendent
- Surface Operations Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)
- Explosives Charger
- Grader
- Jumbo
- Loader - Tool Carrier
- Load-Haul-Dump (LHD)
- Truck (underground)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- General Manager Technical Services
- Health & Safety Manager
- Health & Safety Superintendent
- Planning Superintendent
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)^
- Dozer (rubber tire)
- Drill
- Drill (blasthole)
- Drill^
- Drill^
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Grader^
- Loader
- Loader
- Loader
- Loader
- Shovel (hydraulic)
- Shovel^
- Truck (dump) - EV
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul) - EV
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- 127 mm
- 165 mm
- -
- -
- 250 t
- 330 t
- 120 t
- 330 t
- -
- -
- -
- -
- -
- -
- -
- 160 t
- -
- -
- 150 t
- 220 t
- 170 t
- -
- 220 t
- -
- -
|
- 2
- 7
- 3
- 7
- 10
- 4
- 12
- 16
- 8
- 6
- 3
- 4
- 5
- 4
- 6
- 6
- 1
- 2
- 1
- 1
- 2
- 7
- 2
- 2
- 42
- 1
- 39
- 14
- 39
- 5
- 5
|
- Director & General Manager
- Mine Operations Manager
- Plant Superintendent
- Process Superintendent
- Procurement Officer
- Technical Manager - Process
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cassette Truck
- Concrete sprayer
- Drill
- Drill
- Drill
- Drill
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Explosives Charger
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Personnel Carrier
- Scissor Lift
- Scissor Lift
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 1.5 m3
- 3.1 m3
- 1.9 m3
- -
- -
- -
- -
- -
- 30 t
- 20 t
- -
- -
|
|
|
- ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
- Camp Superintendent
- Fixed Plant Maintenance Manager
- Health, Safety & Compliance Manager
- Materials Superintendent
- Mechanical Superintendent
- Production Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Truck (haul) - AV
|
- .................................
 - .................................
 - .................................

|
|
|
- Chief Executive Officer
- General Manager
- General Manager Engineering & Projects
- General Manager Operations
- Health & Safety Manager
- Mine Planning Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Excavator
- Grader
- Loader
- Truck (dump)
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- General Manager
- Maintenance Superintendent
- Safety Director
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer
- Drill
- Excavator
- Excavator
- Excavator
- Loader
- Truck (dump)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- -
- -
- -
- 220 HP
- 316 HP
- 424 HP
- 242 HP
- 35 tons
- 8000 l
|
|
- Chief Operating Officer
- Head of Mine Operations
- Head of Projects
- Head of Technical Services
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Drill
- Drill
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Shovel (hydraulic)
- Truck (dump)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- -
- -
- -
- -
- .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - -
- .................................
 - .................................

|
- 30 t
- 50 t
- 100 t
- 45 t
- -
- -
- -
- 20 t
- 40 t
- -
- -
- -
- -
- 50 t
- -
- -
|
|
- General Manager
- Health, Safety & Environment Manager
- Managing Director
- President and CEO
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Cable bolter^
- Crane^
- Drill (long hole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Explosives Charger^
- Explosives Charger^
- Forklift^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Rockbreaker^
- Scissor Lift^
- Shotcreter^
- Telescopic Handler^
- Telescopic Handler^
- Telescopic Handler^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (service)^
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 15 t
- 17 t
- 21 t
- 7 t
- -
- -
- -
- 24 t
- 10 t
- -
- -
- -
- -
- 39 t
- -
|
- 3
- 2
- 1
- 1
- 5
- 4
- 2
- 2
- 1
- 1
- 1
- 4
- 3
- 1
- 1
- 3
- 1
- 1
- 1
- 3
- 1
- 1
- 1
- 4
- 3
|
- Consultant - Mining & Costs
- Consultant - Mining, Processing & Infrastructure
- Consultant - Recovery Methods
- General Manager
- Health, Safety & Environment Manager
- Managing Director
- Operational Readiness Manager
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Cable bolter
- Drill
- Drill
- Drill (long hole)
- Drill jumbo (two boom)
- Excavator
- Loader
- Load-Haul-Dump (LHD) - AV
- Truck (haul)
- Truck (haul)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- Chief Operating Officer
- Consultant - Recovery Methods
- General Manager
- Maintenance Planner
- Managing Director and CEO
- Metallurgy Superintendent
- Mining Manager
- Open Pit Mine Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Jumbo
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
|
- -
- -
- 21 t
- 17 t
- 65 t
- 60 t
- 50 t
- 30 t
|
|
- Deputy Mine Manager
- Director of Exploration
- General Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane
- Crane
- Excavator^
- Truck (haul)^
|
|
|
|
- CEO
- Chief Operating Officer
- Country Manager
- Project Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Head of Procurement and Supply Chain
- Project Director
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (crawler)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader^
- Loader^
- Loader^
- Loader^
- Rockbreaker^
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- -
- .................................
 - .................................
 - -
|
- 30 t
- 45 t
- 89 mm
- 127 mm
- 30 t
- 60 t
- 45 t
- -
- 55 t
- 75 t
- 150 t
- 90 t
- -
- -
- 72 t
- 140 t
- -
- 65 t
- 100 t
- -
|
|
- CEO
- Refinery Manager
- Sr. Health, Safety & Security Manager
- Sr. Plant Manager
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- ANFO Loader^
- Deck & Boom Trucks^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Raise boring rig^
- Rock bolter^
- Rockbreaker^
- Scissor Lift^
- Shotcreter^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
|
|
- -
- -
- -
- -
- -
- 14 t
- 17 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 55 t
- 50 t
|
|
- Environmental & Permitting Manager
- Executive VP and Chief Operating Officer
- Project Director
|
- Scott Webber
- Paul Chawrun
- Angela Williams
|
|
+1-(416)-204-1953
|
|
............................
|
- ANFO Loader^
- Cable bolter^
- Concrete sprayer^
- Deck & Boom Trucks^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Drill^
- Grader^
- Loader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Rock bolter^
- Rockbreaker^
- Scissor Lift^
- Scissor Lift^
- Trans Mixer^
- Truck (boom)^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- 7 m3
- 6.7 t
- 17 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 50 t
- 41 t
|
|
- Environmental Engineering Manager
- Executive VP and Chief Operating Officer
- Project Director
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Engineering Manager
- President & General Manager
|
- ..............................
 - ..............................

|
 - -
|
............
|
|
............................
|
- Alimak climber^
- ANFO Loader^
- Drill (long hole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Explosives Charger - EV ^
- Forklift^
- Loader - Tool Carrier - EV ^
- Load-Haul-Dump (LHD) - EV ^
- Personnel Carrier^
- Raise boring rig - EV ^
- Rock bolter^
- Truck (dump)^
- Truck (service)^
- Truck (underground)^
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Mining, Infrastructure & Costs
- President and CEO
|
- ..............................
 - ..............................

|
|
............
|
|
|
- Loader - EV
- Truck (haul)
- Truck (haul) - EV
|
- Sandvik LH518B
- -
- Sandvik TH550B
|
|
|
- Maintenance Superintendent
- Manager Underground Technology
- Managing Director
- Mine Manager
- Mine Operations Manager
- Mine Scheduling and Projects Manager
|
- Thomas Dormenval
- Ferrin Prince
- Nathan Foster
- Scott Farrell
- Kieran McRae
- Mark Smith
|
|
+801-204-2000
|
|
............................
|
- Bolter
- Bolter^
- Concrete sprayer
- Dozer
- Dozer
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Excavator
- Forklift - EV
- Grader
- Loader
- Loader (mini)
- Loader (mini)^
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)^
- Scissor Lift
- Telescopic Handler
- Trans Mixer
- Trans Mixer^
- Truck (haul)
- Truck (underground)
- Truck (underground)^
- Truck (water)
|
- -
- -
- -
- .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 3 cu. yd
- 6 cu. yd
- 3 cu. yd
- -
- -
- -
- -
- -
- -
- -
- -
|
|
- Assistant General Manager
- Health & Safety Manager
- Mill Manager
- Mill Superintendent
- Mine Manager
- Mine Superintendent
- Operations Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Bolter
- Drill
- Drill
- Drill
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)
- Drill (long hole)^
- Drill^
- Loader
- Loader
- Loader
- Loader
- Loader^
- Loader^
- Loader^
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)
- Truck (underground)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Engineering Superintendent
- Mine General Manager
- Process Manager
- Processing Superintendent
- Project Manager
- Supply Chain Director
- Technical Services Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (blasthole) - EV
- Drill (blasthole) - EV ^
- Excavator - EV
- Excavator - EV
- Excavator - EV
- Excavator - EV
- Loader
- Truck (dump)
- Truck (dump)
- Truck (dump)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- -
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................

|
- -
- -
- 5 m3
- 5.5 m3
- -
- 5 m3
- 5 m3
- 55 t
- 45 t
- 25 t
- 42 t
- 55 t
- 55 t
|
|
- Mine Planning Manager
- Procurement Director
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Continuous Miner
- Scoop Tram
- Shuttle car
|
|
|
|
- General Manager
- Maintenance Director
- President and COO
- Safety Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - -
|
|
|
- Chief Executive Officer
- CHPP Manager
- General Manager Operations
- Longwall Superintendent
- Project Manager
- Purchasing Superintendent
- Technical Services Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill (blasthole) - AV
- Loader (FEL)
- Shovel
- Shovel (hydraulic)
- Shovel (hydraulic)
- Shovel^
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 225 mm
- 165 mm
- -
- 220 t
- 569 t
- 720 t
- 533 t
- 569 t
- 227 t
- 250 t
- 220 t
- 313 t
|
|
- HSE & Quality Manager
- Mill Manager
- Mine Operations Manager
- Mine Planning Manager
- Mining Manager
- Project Manager
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Geologist
- General Manager
- GM - Project Development & Strategy
- Health, Safety & Environment Superintendent
- Mine Technical Superintendent
- Production Geologist
- Production Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner^
- Rock bolter^
- Scoop Tram^
- Shuttle car^
|
|
|
|
- Logistics Manager
- Safety Director
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill^
- Load-Haul-Dump (LHD)
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole) - EV ^
- Drill (blasthole)^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Shovel - EV ^
- Shovel - EV ^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- 700 t
- -
- -
- 32 m3
- 290 t
- 290 t
- -
- -
- -
|
|
- Chief Development Officer
- Chief Geologist
- Exploration Manager
- Managing Director
- VP Exploration
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner^
- Rock bolter^
- Scoop Tram^
- Truck (underground)^
|
- .................................
 - .................................
 - -
- .................................

|
|
|
- CEO
- Engineering Project Manager
- Project Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Jumbo
- Jumbo
- Load-Haul-Dump (LHD)
- Truck (haul)
|
- Sandvik DD421
- Sandvik DD422i
- Sandvik Toroâ„¢ LH621i
- Sandvik TH663i
|
|
|
- Exploration Manager
- Mining Contracts Manager
- Mining Manager
- Technical Services Manager
- Underground Mine Manager
|
- Oarabile Disang
- Brent Alting
- Logic Sebopeng
- Bava Reddy
- Chris Harmse
|
|
+267-74-693-693
|
|
............................
|
- Continuous Miner
- Continuous Miner
- Feeder Breaker
- Rock bolter
- Shuttle car
|
- .................................
 - .................................
 - -
- -
- .................................

|
|
|
- Chief Operating Officer
- Project Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dragline
- Drill
- Drill
- Excavator
- Loader (FEL)
- Loader (FEL)
- Shovel
- Shovel
- Truck (dump)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- 56 m3
- -
- -
- -
- -
- 30 m3
- -
- 33 m3
- 91 t
- -
- 81 t
|
|
- Business Improvement Manager
- Commercial Manager
- Metallurgical Manager
- Mine Manager
- VOHE Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dragline
- Dragline
- Drill
- Excavator
- Excavator
- Loader (FEL)
- Shovel
- Shovel
- Truck (dump)
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer (crawler)^
- Drill (blasthole)^
- Drill (blasthole)^
- Grader^
- Loader^
- Truck (dump)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Executive Officer
- General Manager Sustainability
- Mechanical Superintendent
- Mining Manager
- Production Superintendent
- Project Director
- Senior Procurement Officer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Drill
- Drill
- Drill (blasthole)
- Excavator
- Excavator
- Excavator^
- Explosives Charger
- Forklift
- Grader
- Grader
- Loader
- Loader
- Loader
- Loader - Tool Carrier
- Loader - Tool Carrier
- Rock bolter
- Scissor Lift
- Shotcreter
- Telescopic Handler
- Telescopic Handler
- Trans Mixer
- Truck (dump)
- Truck (haul)
- Truck (haul) - EV
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 72 t
- -
|
- 1
- 7
- 2
- 4
- 4
- 2
- 8
- 1
- 4
- 1
- 4
- 1
- 3
- 1
- 12
- 1
- 2
- 3
- 1
- 1
- 1
- 1
- 1
- 1
- 1
- 22
- 6
- 4
- 2
|
- Country Manager
- Engineering Manager
- General Manager
- Maintenance Planner
- Mine Planning Superintendent
- Mineral Resource Manager
- Open Pit Mine Manager
- Process Plant Manager
- Senior Buyer
- Supply Chain Manager
- Technical Services Superintendent
- Underground Mine Manager
- Underground Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Load-Haul-Dump (LHD) - AV
|
- .................................

|
|
|
- Engineering Manager
- Maintenance Superintendent
- Mill Maintenance Superintendent
- Mine Technical Services Manager
- Operations Superintendent
- Sustainability & Environmental Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Drill (long hole)^
- Grader^
- Jumbo^
- LHD Rammer Jammer^
- LHD Rammer Jammer^
- Loader^
- Personnel Carrier^
- Trans Mixer^
- Truck (boom)^
- Truck (haul)^
- Truck (underground)
|
- -
- .................................
 - .................................
 - .................................
 - -
- -
- -
- .................................
 - -
- -
- -
- -
- -
|
- -
- -
- -
- -
- -
- 6 cu. yd
- 4 cu. yd
- -
- -
- -
- -
- 42 t
- 30 t
|
|
- Consultant - Recovery Methods & Costs
- Health, Safety & Training Superintendent
- Maintenance Superintendent
- Operations Superintendent
- Plant Superintendent
- Procurement Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- President and CEO
|
- ..............................
 - ..............................
 - ..............................

|
|
|
|
............................
|
- Load-Haul-Dump (LHD)
- Truck (dump) - EV
|
- .................................
 - .................................

|
|
|
- General Manager
- Maintenance Planner
- Mine Manager
- Production Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Drill
- Drill jumbo (two boom)
- Excavator
- Excavator
- Grader
- Grader
- Loader
- Loader
- Truck (dump)
- Truck (dump)
- Truck (haul)
- Truck (water)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
|
|
- Chief Geologist
- Chief Operating Officer
- General Manager
- Mobile Maintenance Superintendent
- Open Pit Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Bulldozer
- Continuous Miner
- Excavator
- Feeder Breaker
- Highwall miner
- Loader (FEL)
- Loader (FEL)
- Scoop Tram
- Shuttle car
|
- -
- .................................
 - -
- -
- -
- -
- .................................
 - .................................
 - -
- -
|
|
|
- General Manager
- President and COO
- Project Manager
- Safety Director
- Vice President, Maintenance
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Dozer (crawler)^
- Drill^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader^
- Rockbreaker^
- Rockbreaker^
- Tire manipulator^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (stemming)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 50 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 40 t
- 40 t
- -
- -
- -
|
|
- Chief Development Officer
- Consultant - Costs
- Consultant - Recovery Methods & Costs
- Exploration Manager
- Maintenance Manager
- Managing Director and CEO
- Project Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill jumbo (two boom)^
- Grader^
- Loader^
- Loader^
- Loader^
- Truck (underground)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- General Manager
- HSE & Quality Manager
- Mining Manager
- Procurement Manager
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Load-Haul-Dump (LHD) - AV
- Load-Haul-Dump (LHD) - AV
- Load-Haul-Dump (LHD) - AV
- Scoop Tram - AV
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Area Manager
- Logistics Manager
- Maintenance Manager
- Mine Manager
- Production Manager
- Sr. Maintenance Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Dozer (rubber tire)
- Drill
- Drill
- Drill (blasthole)
- Drill (blasthole)
- Drill (blasthole) - EV
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Loader (FEL)
- Shovel (hydraulic)
- Shovel (hydraulic) - EV
- Truck (haul)
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 306 kW
- 433 kW
- 372 kW
- 597 kW
- 110 mm
- 110 mm
- 165 mm
- 165 mm
- 165 mm
- 200 kW
- 202 kW
- 221 kW
- 12 m3
- 21.4 m3
- 21 m3
- 29 m3
- 136 t
- 219 t
- -
|
|
- Deputy General Manager
- General Manager
- Health, Safety & Security Manager
- Manager Continuous Improvement
- Mine Manager
- Process Manager
- Purchasing Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (long hole)^
- Drill jumbo (single boom)^
- Excavator^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Tire manipulator^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- .................................

|
- 55 t
- -
- -
- -
- -
- -
- -
- -
- 15 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
|
- Director Business Development
|
- ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Development Manager
- Head of Procurement and Supply Chain
- Managing Director
- Mill Development Manager
- Mill Maintenance Manager
- Mine Captain
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter^
- Cable bolter^
- Crane^
- Dozer^
- Drill (blasthole)^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Excavator^
- Explosives Charger^
- Grader^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Scissor Lift^
- Truck (dump)^
- Truck (service)^
- Truck (underground)^
- Truck (water)^
|
- -
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
|
- -
- -
- -
- -
- 140 mm
- -
- -
- 5.5 m3
- -
- -
- -
- -
- -
- -
- -
- 36 t
- -
- -
- -
|
|
- Chief Operating Officer
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- President and CEO
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dragline
- Drill
- Excavator
- Loader (FEL)
- Shovel (hydraulic)
- Truck (dump)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Processing Manager
- Safety Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Bolter
- Drill
- Excavator
- Forklift
- Grader
- Loader
- Load-Haul-Dump (LHD)
- Locomotive
- Scaler
- Scissor Lift
- Truck
- Truck (dump)
|
|
|
|
- Environmental Manager
- Mine Planning Manager
- VP Operations
- VP, Technical Services
|
- Bashan Govender
- Steven Wild
- Moses Netshivhazwaulu
- Charl Labuschagne
|
|
+27-11-278-9600
|
|
............................
|
|
|
|
|
- Environmental & Permitting Manager
- President
- Underground Mine Engineer
|
- ..............................
 - ..............................
 - ..............................

|
- -
 - -
|
............
|
|
............................
|
- Truck (haul)^
- Truck (haul)^
|
|
|
|
- Executive General Manager
- Managing Director
|
- ..............................
 - ..............................

|
|
|
|
............................
|
|
|
|
|
- Environmental & Permitting Manager
- President
- Underground Mine Engineer
|
- ..............................
 - ..............................
 - ..............................

|
- -
 - -
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Excavator
- Excavator
- Grader
- Grader
- Loader
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Head of Projects
- Health, Safety & Environment Lead
|
- ..............................
 - ..............................

|
|
............
|
|