Asset | Existing Fleet Type | Existing Model | Existing Size | Existing Quantity | Job Title | Name | Profile | Phone | Email |
............................
|
|
|
|
|
- Chief Operating Officer
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- Process Engineering Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill jumbo (two boom)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
|
- -
- -
- .................................
 - .................................

|
|
|
- General Manager Mining
- Operations Supervisor
- Procurement Supervisor
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Operating Officer
- General Manager
- General Manager Operations
- Project Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Executive Officer
- Project Manager
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Drill^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Scissor Lift^
- Shovel (hydraulic)^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (underground)^
- Truck (water)^
|
|
- 240 kW
- 114 mm
- 150 kW
- -
- 6.8 cu. m
- -
- 2 cu. m
- 3.5 cu. m
- 50 t
- 42 t
- -
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Managing Director and CEO
- Occupational Health & Safety Manager
- Project Manager - Processing
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Belly-dump truck
- Dragline
- Loader
|
- .................................
 - .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Crane^
- Drill (blasthole)^
- Forklift^
- Loader (FEL)^
- Loader (FEL)^
- Loader (FEL)^
- Tipper truck^
- Truck (haul)^
|
- -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
|
- 110 t
- 250 t
- 60 t
- 140 mm
- 3 t
- -
- 81 t
- 14 t
- 3 t
- 90 t
|
|
- Chief Operating Officer
- Executive Director (Technical)
- Managing Director
|
- ..............................
 - ..............................
 - ..............................

|
  - -
|
............
|
|
............................
|
|
|
|
|
- Engineering Manager
- Health & Safety Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
|
|
............
|
|
............................
|
- Continuous Miner
- Rock bolter
- Scoop Tram
|
|
|
|
- Engineering General Manager
|
- ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Director of Operations
- Mine Superintendent
- President
- Process Engineering Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Drill
- Excavator
- Excavator
- Grader
- Loader
- Loader (FEL)
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Corporate Manager - Processing
- Engineering Manager
- Mineral Resource Manager
- President and CEO
- Technical Services Manager
- VP & Managing Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (service)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................

|
|
|
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- General Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Engineer
- Maintenance Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Environmental Manager
- Senior Mining Manager
- Sr. Project Manager
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Project Manager
- VP Operations
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Executive Officer
- Chief Operating Officer
|
- ..............................
 - ..............................

|
|
............
|
|
|
- Dozer
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Loader
- Loader
- Loader
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
- Truck (water)
|
- Caterpillar D9R
- Atlas Copco
- Liebherr 9350
- Komatsu PC 1250-8
- Komatsu PC210-LC
- Caterpillar 6020
- Caterpillar 14H
- Caterpillar 14M
- Caterpillar 966G
- Caterpillar 966F
- Caterpillar 988H
- Caterpillar 773E
- Caterpillar 777D
- Caterpillar 777F
- Caterpillar 773B
- Caterpillar 777D
|
|
|
- Deputy Process Manager
- General Manager
- Health, Safety & Environment Manager
- Mining Manager
- Plant Maintenance Superintendent
|
- Pauline Tahi
- Ouattara Ekra Kassoum
- Christelle Amand Epse Vanga
- Kwadwo Opoku Ansah
- Jean Martial Kouadio
|
|
+225-22-48-99 00
|
|
............................
|
|
|
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Drill
- Drill
- Jumbo
- Jumbo
- Loader
- Loader
- Truck (underground)
- Truck (underground)
|
- Atlas Copco
- -
- Sandvik
- Sandvik
- Caterpillar
- Caterpillar
- Atlas Copco
- -
|
|
|
- Alternate Underground Manager
- General Manager
- Maintenance Superintendent
- Mobile Maintenance Superintendent
- Processing Manager
- Underground Mine Manager
|
- Nick Tait
- Jason Sander
- Neil Freebury
- Jim Innes
- Tristan Freemantle
- Karen Davtyan
|
|
+61 (0) 8 9088-3822
|
|
|
- Loader
- Shovel
- Truck (haul)
- Truck (haul)
|
|
|
|
- Health & Safety Manager
- Mine Maintenance Superintendent
- Mine Manager
|
- Chuck Burns
- Colin Evans
- Alex Kofi Annin
|
|
030-701-1852
|
|
............................
|
|
|
|
|
- Environmental & Community Manager
- General Manager Health & Safety
- Mine Manager
|
- ..............................
 - ..............................
 - ..............................

|
- -
 
|
............
|
|
............................
|
- Drill
- Excavator
- Excavator^
- Loader
- Loader
- Shovel
- Shovel (rope)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- 18 cu. m
- 38 cu. m
- 45 cu. m
- 45 cu. m
- 313 t
- 290 t
|
|
- Mine Manager
- Project Manager
- Section Manager
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill^
- Drill^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Shovel (hydraulic)^
- Shovel (rope)^
- Truck (haul)^
- Truck (water)^
|
|
- -
- 311 mm
- 152 mm
- 4.9 m blade
- 25 cu. m
- 10 cu. m
- 27 cu. m
- 56 cu. m
- 300 t
- 75 cu. m
|
|
- Mine Superintendent
- President and CEO
- Regional General Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Mineral Resource Manager
- Sr. Project Engineer
|
- ..............................
 - ..............................

|
|
............
|
|
|
- Backhoe^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Truck (haul)^
- Truck (underground)^
|
|
- -
- -
- -
- -
- 5.6 cu. m
- 14 t
- -
- 40 t
- 45 t
|
|
|
|
|
+1 (604) 684-2181
|
|
............................
|
|
|
|
|
- Equipment Maintenance Planner
- General Director
- Mining Director
- Plant Operations Manager
- Project Controls Manager
- Project Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Excavator
- Shovel
- Truck (haul)
|
|
|
|
- General Manager
- Health & Safety Manager
- Mine Maintenance Superintendent
|
- Joshua Mortoti
- Yaw Kyei Amoako
- Raul Chauca
|
|
+233-50-132-3692
|
|
............................
|
|
|
|
|
- Process Engineering Manager
- VP Operations
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Director of Operations
- Maintenance Superintendent
- Operations Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Process Engineering Manager
- Project Manager
- Project Superintendent
- Sr. Vice President Operations
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Head of Processing
- Mechanical Maintenance Manager
- Production Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Buyer
- Deputy Mine Manager
- Director of Materials Management
- Engineering Manager
- Maintenance Director
- Maintenance Manager
- VP Safety
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Alternate Open Pit Manager
- Environmental Manager
- General Manager Operations
- Managing Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Operating Officer
- General Manager
- Maintenance Manager
- Mine Planning Manager
- Process Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill^
- Loader^
- Shovel (hydraulic)^
- Truck (haul)^
|
|
|
|
- Environmental & Permitting Manager
- Sr. Vice President Operations
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Buyer
- General Manager
- Mine Operations Superintendent
- Procurement Manager
- Project Manager
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader^
- Bulldozer^
- Bulldozer^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Consultant - Costs
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Environmental Superintendent
- Metallurgical Superintendent
- Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager Operations
- Metallurgical Superintendent
- Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Geologist
- Director of Sustainability and Logistics
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Health, Safety & Environment Manager
- President and CEO
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Truck (dump)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- CEO
- Electrical Maintenance Superintendent
- Maintenance Manager
- Process Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Engineering Manager
- Environmental Manager
- General Manager
- Production Manager
- Production supervisor
- Section Manager
- Senior General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane^
- Deck & Boom Trucks^
- Dozer^
- Excavator^
- Forklift^
- Grader^
- Loader (FEL)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- -
- -
- .................................
 - -
- -
- .................................
 - -
- -
- -
- .................................

|
- 40 t
- -
- -
- 5 cu. m
- -
- 12 ft
- 5 cu. m
- -
- 30 t
- -
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- VP, Project Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Excavator
- Excavator
- Excavator
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- CEO
- Director Health, Safety, Security & Environment
- Maintenance Superintendent
- Mine Technical Superintendent
- Refinery Manager
- Shutdown and Planning Superintendent
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Loader
- Shovel (rope)
- Truck (haul)
|
- Komatsu L1850
- -
- Caterpillar 793
|
|
|
- Chief Operating Officer
- General Manager - Processing
- General Manager Operations
- Mining Director
- VP Environment & Sustainability
|
- Guy Belleau
- Romain Precheur
- Jennifer Blain
- Michel Gagné
- Grace Barrasso
|
|
+(418) 287-4700
|
|
............................
|
|
|
|
|
- Construction Manager
- Safety Manager
|
- ..............................
 - ..............................

|
|
............
|
|
|
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Excavator^
- Grader^
- Grader^
- Loader
- Loader^
- Shovel
- Shovel^
- Truck (haul)
- Truck (haul)^
- Truck (water)^
|
- Caterpillar D9^
- Caterpillar D10^
- Caterpillar 834K^
- -
- Caterpillar 24M^
- Caterpillar 16M^
- Caterpillar 994 K
- Caterpillar 992K^
- Caterpillar 6040
- Caterpillar 6040^
- Caterpillar 789D
- Caterpillar 789D^
- -
|
- 436 HP
- 600 HP
- 4.6 m
- -
- 7.3 m
- 4.9 m
- 21 cu. m
- 11.5 cu. m
- 22 cu. m
- 22 cu. m
- 181 t
- 181 t
- -
|
|
- Project Manager/General Manager
|
|
|
+3-741-054-6037
|
|
............................
|
- Crane^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill^
- Grader^
- Loader (mini)^
- Loader^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - -
- .................................
 - .................................

|
- 6 t
- -
- -
- 203 mm
- -
- -
- 6.4 cu. m
- -
- 56 t
- -
|
|
- Consultant - Infrastructure
- Consultant - Mining
- Consultant - Recovery Methods
- General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill^
- Excavator^
- Loader (FEL)^
- Truck (dump)^
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Metallurgical Superintendent
- Occupational Health & Safety Superintendent
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Dozer^
- Excavator^
- Grader^
- Grader^
- Loader^
- Scraper^
- Scraper^
- Truck (haul)^
- Truck (water)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
|
|
|
- VP, Corporate Development
|
- ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................

|
|
|
- General Manager
- Health & Safety Manager
- Plant Maintenance Planning Manager
- Plant Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Environmental Manager
- General Manager Mining
- Logistics Manager
- Maintenance Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager Operations
- Mine Superintendent
- Sr. Project Engineer
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Crane
- Drill jumbo (two boom)
- Scissor Lift
- Truck (service)
|
|
|
|
- Environmental Superintendent
- Health And Safety Officer
- Plant General Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Cable bolter
- Drill
- Drill
- Drill (long hole)
- Explosives Charger
- Loader
- Loader
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Electrical Maintenance Superintendent
- General Manager
- Plant Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Maintenance Superintendent
- Maintenance Supervisor
- Site Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Drill
- Shovel
- Shovel (hydraulic)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chemical Laboratory Superintendent
- Concentrator Manager
- Environmental Manager
- Environmental Superintendent
- Maintenance Engineering Superintendent
- Maintenance Manager
- Superintendent Concentrator Operations
- Superintendent Logistics
- Tailings Strategy Manager
- VP, Engineering
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Shovel (rope)
- Shovel (rope)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 48 cu. m
- 35 cu. m
- 220 t
- 360 t
- 320 t
- 220 t
- 220 t
|
|
- Environmental Manager
- Maintenance Engineering Superintendent
- Metallurgical Superintendent
- Operations Superintendent
- Plant Maintenance Manager
- Sr. Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dragline
- Drill
- Excavator
- Shovel
- Truck (haul)
- Truck (haul)
|
- -
- -
- -
- -
- -
- .................................
 - .................................

|
|
|
- Director Technical Services
- Environmental Engineering Manager
- Operations Manager
- Plant Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (blasthole)
- Excavator
- Excavator
- Excavator
- Truck (dump)
- Truck (dump)^
- Truck (dump)^
- Truck (haul)
|
- .................................
 - .................................
 - -
- .................................
 - -
- -
- -
- .................................

|
|
|
- Chief Operating Officer
- Consultant - Mining
- Consultant - Recovery Methods
- Mine Manager
- Site Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Consultant - Mining & Costs
- President and CEO
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Exploration Manager
- Managing Director
|
- ..............................
 - ..............................

|
 - -
|
............
|
|
............................
|
- Drill
- Drill (blasthole)
- Loader (FEL)
- Shovel
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Drilling & Blasting Superintendent
- Maintenance Manager
- Maintenance Superintendent
- Planning Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Continuous Miner
- Continuous Miner
- Feeder Breaker
|
- .................................
 - .................................
 - .................................
 - -
|
|
|
- Engineering & Maintenance Manager
- General Manager
- Health & Safety Manager
- Longwall Superintendent
- Maintenance & Mine Services Superintendent
- Mining Manager
- Surface & Infrastructure Manager
- Ventilation Specialist
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Metallurgist
- Managing Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Longwall mining unit
|
|
|
|
- Engineering Manager
- Health & Safety Manager
- Project Manager
- Underground Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (dump)^
- Truck (haul)^
- Truck (water)^
|
|
- 20 t
- 30 t
- 4.3 m
- 25 t
- 25 t
- 30 t
- 20,000 l
|
|
- Construction Manager
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Country Manager
- Engineering Manager
- Project Director
- Project Services Manager
- Technical Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill jumbo (two boom)^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Rock bolter^
- Scissor Lift^
- Truck (haul)^
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- -
|
- -
- -
- -
- 4.5 cu. m
- 7 cu. m
- -
- -
- 14 cu. m
|
|
- General Manager
- Infrastructure Superintendent
- Maintenance Manager
- Mine Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager
- Mine Operations Manager
- Mine Planning Manager
- Project Director
- Senior Buyer
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Consultant - Recovery Methods
- General Manager
- Plant Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Crane^
- Deck & Boom Trucks^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Forklift^
- Forklift^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader (mini)^
- Shovel (hydraulic)^
- Tire manipulator^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
|
- 106 kW
- 80 t
- 40 t
- 455 kW
- 419 kW
- 165 mm
- 1.4 cu. m
- 5 t
- 10 t
- 217 kW
- 12 cu. m
- 5 cu. m
- 55 kW
- 15 cu. m
- -
- -
- -
- 144 t
- 41 t
- 40 t
- -
- 35000 l
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Director of Studies
- VP Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
- ..............................

|
|
............
|
|
|
|
|
|
|
|
- Tawanda Nyambirai
- Shingirayi Mwanza
|
|
|
|
............................
|
|
|
|
|
- Fixed Plant Maintenance Superintendent
- Mine Equipment Maintenance Manager
- Mine Production Manager
- Site Improvement Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Shovel^
- Shovel^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
|
- Cable bolter^
- Drill (long hole)^
- Jumbo^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Rock bolter^
- Scaler^
- Truck (underground)^
- Truck (underground)^
|
- -
- -
- -
- Caterpillar R1700^
- Caterpillar R2900^
- -
- -
- -
- -
|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- General Manager
- General Manager Projects
- Maintenance Manager
- Operations Manager
- Processing Manager
|
- Jason Cox
- Brenna J.Y. Scholey
- Rodrigo Fonseca
- Marcos Martins de Camargo
- Wesley Clenio da Silva
- Wanderlúcio Gomes Martins
- Juliana Siqueira
|
|
+55-(11)-3405-4499
|
|
............................
|
|
|
|
|
- Buyer
- Chief Operating Officer
- Environmental Superintendent
- General Manager
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Loader^
- Shovel^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Director, Project Development
|
- ..............................

|
|
............
|
|
............................
|
|
|
|
|
- CEO
- Chief Operating Officer
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill
- Loader
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Maintenance Superintendent
- Procurement Lead
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Director of Operations
- Maintenance Superintendent
- Metallurgical Manager
- Plant Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Engineering Superintendent
- HSE Superintendent
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer
- Dozer
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Grader
- Loader
- Loader
- Rockbreaker
- Rockbreaker
- Truck (dump)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
- 11
- 1
- 2
- 14
- 3
- 3
- 3
- 1
- 3
- 2
- 1
- 1
- 2
- 1
- 2
- 1
- 1
- 23
- 28
- 11
- 8
- 2
- 1
|
- Engineering Manager
- Materials Manager
- Mine Planning Manager
- Process Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner^
- Rock bolter^
- Scoop Tram^
- Shuttle car^
|
|
|
|
- General Maintenance Manager
|
- ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill^
- Grader^
- Loader^
- Loader^
- Shovel^
- Shovel^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Continuous Miner
- Shuttle car
|
- .................................
 - .................................

|
|
|
- Engineering Manager
- Environmental & Community Superintendent
- Mechanical Engineering Manager
- Operations Manager
- Production Superintendent
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager
- Maintenance Superintendent
- Safety Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Dozer^
- Dozer^
- Excavator^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Shovel^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
- ..............................

|
|
|
|
............................
|
- Dozer
- Dozer
- Drill
- Drill
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Concentrator Manager
- Infrastructure Superintendent
- Logistics Manager
- Maintenance Manager
- Mine General Manager
- Occupational Health & Safety Manager
- Operations Manager
- Technology Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Drill
- Excavator
- Excavator
- Loader
- Truck (dump)
- Truck (dump)
- Truck (dump)
|
- -
- .................................
 - -
- -
- -
- .................................
 - .................................
 - .................................

|
- -
- -
- 4.1 cu. m
- 5.5 cu. m
- -
- 35 t
- 55 t
- 30 t
|
|
- Chief Executive Officer
- Site Director
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
|
|
|
|
- Chief Executive Officer
- Sr. Project Manager
|
- Biju Nair
- Devendra Kumar Singh
|
|
+7 7213-96-29 31
|
|
............................
|
|
|
|
|
- Electrical Maintenance Superintendent
- General Manager
- Mechanical Maintenance Superintendent
- Mill Manager
- Mine Manager
- Mine Operations Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill^
- Excavator^
- Grader^
- Loader^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (water)^
|
|
- 264 kW
- 172 mm
- 2.3 cu. m
- 115 kW
- 1.5 cu. m
- 32 t
- -
- 9500 l
|
|
- Consultant - Infrastructure
- Consultant - Mining
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Geologist
- Sr. General Manger / Head of Operations
|
- ..............................
 - ..............................

|
|
|
|
............................
|
- Drill
- Excavator
- Excavator
- Excavator
- Truck
- Truck (dump)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 127 mm
- 16.5 cu. m
- 6.7 cu. m
- 4.1 cu. m
- -
- -
- -
|
|
- Health, Safety & Environment Manager
- Maintenance Manager
- Operations Supervisor
- Supply Chain Manager
- VP Permitting
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill
- Drill (long hole)^
- Drill jumbo (two boom)^
- Excavator
- Excavator
- Excavator
- Grader^
- Loader (FEL)^
- Loader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Raise boring rig^
- Rock bolter^
- Scissor Lift^
- Shotcreter^
- Trans Mixer^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 127 mm
- -
- -
- 16.5 cu. m
- 6.7 cu. m
- 4.1 cu. m
- -
- -
- -
- 6.7 t
- 10 t
- -
- -
- -
- -
- -
- -
- -
- -
- 39 t
- 91 t
- 32 t
- 27 t
|
- 5
- 3
- 4
- 3
- 2
- 3
- 1
- 3
- 2
- 1
- 11
- 2
- 1
- 7
- 9
- 1
- 3
- 3
- 1
- 18
- 21
- 5
- 16
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader
- Bolter
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Jumbo
- Jumbo
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader (FEL)
- Scissor Lift
- Scissor Lift
- Truck (boom)
- Truck (dump)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
- Truck (water)
|
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 5.5 cu. m
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- 1
- 1
- 1
- 3
- 1
- 4
- 1
- 2
- 3
- 3
- 5
- 1
- 2
- 2
- 2
- 2
- 2
- 3
- 2
- 3
- 1
- 1
- 2
- 3
- 2
- 1
- 2
- 1
- 1
- 4
- 4
- 3
- 1
- 1
- 1
- 2
- 24
- 24
- 1
- -
- 4
- 1
- 2
- 2
|
- Consultant - Mining
- Electrical Superintendent
- Operations Supervisor
- Plant Maintenance Planner
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Executive Director (Technical)
- General Manager
- Maintenance Supervisor
- Operations Superintendent
- Plant Operations Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Operating Officer
- Consultant - Recovery Methods
- Managing Director
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Drill (blasthole)^
- Excavator^
- Loader^
- Truck (dump)^
|
|
|
|
- Managing Director and CEO
|
|
|
819-218-3423
|
|
............................
|
|
|
|
|
- Chief Executive Officer
- Consultant - Mining
- Consultant - Recovery Methods
- General Manager
- Plant Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Operations General Superintendent
- VP, Technical Services
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Loader (FEL)^
- Truck (haul)^
|
|
|
|
- Operations General Superintendent
- VP, Technical Services
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Drill^
- Grader^
- Jumbo^
- Rockbreaker^
- Scaler^
- Scoop Tram^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- President and CEO
|
- ..............................
 - ..............................
 - ..............................

|
|
|
|
............................
|
- Backhoe
- Crane
- Crane
- Dozer
- Drill
- Grader
- Loader (FEL)
- Shovel
- Truck (dump)
- Truck (dump)
|
- .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 28 cu. m
- 25 t
- 15 t
- -
- -
- -
- -
- 16.5 cu. m
- 177 t
- -
|
|
- Mine Superintendent
- Production Superintendent
- Project Manager
- Sr. Vice President Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Sr. General Manger / Head of Operations
|
- ..............................

|
|
............
|
|
............................
|
- Alimak climber^
- ANFO Loader^
- Bolter^
- Dozer (crawler)^
- Drill (long hole)^
- Drill jumbo (single boom)^
- Drill jumbo (two boom)^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Shovel (hydraulic)^
- Tractor trailer^
- Truck (fuel / lube)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
|
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - -
- -
|
- -
- -
- -
- -
- -
- -
- -
- 165 mm
- 5 cu. m
- 4 cu. m
- -
- -
- 4 cu. m
- 10 cu. m
- 9 t
- 14 t
- 10 cu. m
- -
- -
- -
- 90 t
- 40 t
- -
- 40 t
|
|
- Chief Operating Officer
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Drill jumbo (two boom)^
- Drill^
- Drill^
- Forklift^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Rock bolter^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- -
- -
- -
- -
- -
- -
- -
- 6 cu. m
- 4.5 cu. m
- -
- -
- -
- -
- 45 t
|
|
- Consultant - Costs
- Consultant - Mining
- Consultant - Mining & Costs
- Operations Superintendent
- President and CEO
- VP Environment & Sustainability
- VP, Project Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Production Manager
- Sr. Project Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Engineering Manager
- General Manager
- Health & Safety Manager
- Superintendent Concentrator Operations
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Director Business Development
- General Maintenance Manager
- Longwall Manager
- Surface Facilities Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Group Director, Open Pit Mines
- Mine Superintendent
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Health, Safety & Environment Manager
|
- ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager Operations
- General Manager Operations Planning
- Maintenance Manager
- Process Superintendent
- Procurement Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
|
|
............................
|
|
|
|
|
- Chief Development Officer
|
- ..............................

|
|
............
|
|
|
- Shovel
- Shovel
- Shovel
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- P&H 2800 XPC
- Hitachi EX5500
- Hitachi EX5600
- Hitachi EX3600
- Komatsu 830E-AC
- Caterpillar 785
- Komatsu 830E D/C
|
|
|
- Chief Geologist
- Operations Manager
- Process Maintenance Superintendent
- Sr. Production Geologist
|
- Michael Olson
- Dale Thompson
- Mark Wilson
- Eric Herth
|
|
(775)237-5854
|
|
............................
|
|
|
|
|
- Mechanical Superintendent
- Technical Services Superintendent
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Drill
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
|
|
|
|
|
|
|
|
|
|
- Chief Operating Officer
- General Manager
- Mining Manager
- Plant Manager
- Regional General Manager
|
- Beyers Nel
- Willem Gouws
- Baile Alfred Moshodi
- Johnny Botha
- Francois Janse van Rensburg
|
|
+27-11-411-2000
|
|
............................
|
|
|
|
|
- General Manager Operations
- Mobile Equipment Maintenance Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Backhoe^
- Backhoe^
- Dozer (crawler)^
- Dozer (crawler)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Excavator^
- Grader^
- Grader^
- Loader^
- Truck (haul)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 350 kW
- 300 kW
- 150 kW
- 450 kW
- 250 kW
- 370 kW
- 250 mm
- 29 cu. m
- 14 ft
- 16 ft
- 6 cu. m
- 240 t
- 45 t
|
|
- Consultant - Infrastructure
- Consultant - Mining & Costs
- Environmental Manager
- President and CEO
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Head of Mining
- Head of Processing
- Principal author (consultant)
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager
- Metallurgical Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager
- Plant Manager
- Procurement Manager
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- CEO
- Chief Operating Officer
- Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill^
- Excavator^
- Excavator^
- Truck (dump)^
|
- .................................
 - -
- .................................
 - .................................
 - .................................

|
|
|
- Chief Operating Officer
- Managing Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Director of Operations
- Health, Safety & Environment Manager
- Production Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Director Mine
- Mine Manager
|
- ..............................
 - ..............................

|
|
............
|
|
|
- Dozer^
- Drill^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (haul)^
|
- Caterpillar D6^
- Atlas Copco FlexiROC T45^
- Caterpillar 349^
- Caterpillar 14^
- Caterpillar 980^
- -
|
- 325 HP
- 325 HP
- 472 HP
- 238 HP
- 6 cu. m
- 40 t
|
|
- Consultant - Mining
- President and CEO
|
- Varun Bhundhoo
- Pascal Hamelin
|
|
819-825-8678
|
|
|
- Alimak climber^
- ANFO Loader^
- Deck & Boom Trucks^
- Drill jumbo (single boom)^
- Drill jumbo (two boom)^
- Drill^
- Grader^
- Loader (FEL)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Load-Haul-Dump (LHD)^
- Personnel Carrier^
- Rock bolter^
- Scissor Lift^
- Shotcreter^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
|
|
- -
- -
- -
- -
- -
- 4 inch
- -
- 8 cu. yd
- 6 cu. yd
- 4 cu. yd
- 2.5 cu. yd
- -
- -
- -
- -
- -
- -
- 50 t
- 30 t
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods
- General Manager
- VP Projects & Operations
|
- Andrew MacKenzie
- Andy Holloway
- Kirsty Liddicoat
- Mike Willett
|
|
807-735-2077
|
|
............................
|
- Excavator
- Shovel
- Truck (haul)
|
|
|
|
- Mine Technical Manager
- Plant Manager
- Process Manager
- Process Operations Manager
- Project Director
- Senior Manager, Fixed Plant
- Sr. Process Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Maintenance & Projects Manager
- Mine Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager Operations
- Maintenance Supervisor
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Compactor^
- Dozer (rubber tire)^
- Dozer (rubber tire)^
- Drill (blasthole)^
- Drill (blasthole)^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Loader (FEL)^
- Truck (dump)^
- Truck (dump)^
- Truck (fuel / lube)^
- Truck (water)^
|
|
- 10 t
- 475 HP
- 365 HP
- 89 mm
- 140 mm
- 115 mm
- 36 t
- 76 t
- 14 m blade
- 3 cu. m
- 55 t
- 40 t
- -
- 50,000 l
|
|
- Consultant - Infrastructure
- Consultant - Mining
- Consultant - Recovery Methods & Costs
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer
- Dragline
- Dragline
- Shovel
- Shovel
- Shovel
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Manager - Coal Preparation
- Safety Manager
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill (long hole)^
- Grader^
- Loader (FEL)^
- Shovel (hydraulic)^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (water)^
|
|
- -
- 121 mm
- -
- 9 cu. m
- 10 cu. m
- -
- 62 t
- -
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- VP, Engineering & Development
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill (blasthole)^
- Excavator^
- Excavator^
- Grader^
- Truck (dump)^
- Truck (dump)^
- Truck (water)^
|
|
|
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- Environmental Manager
- General Manager Operations
- Health, Safety & Training Manager
- Maintenance Superintendent
- Mine Superintendent
- Mining Manager
- Processing Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Operations Manager
- Operations Supervisor
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Scoop Tram
- Truck (haul)
- Truck (haul)
|
|
- -
- -
- 6 cu. yd
- 4 cu. yd
- 3 cu. yd
- 1.5 cu. yd
- 13 t
- 26 t
|
|
- Chief Executive Officer
- General Manager Operations
- Health & Safety Superintendent
- Plant Superintendent
- Underground Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer^
- Compactor^
- Crane^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader^
- Loader^
- Personnel Carrier^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
|
- 233 kW
- 117 kW
- 36 t
- 144 mm
- 5 cu. m
- 3 cu. m
- 4.9 m blade
- 4.3 m blade
- 7 cu. m
- 4.5 cu. m
- -
- 64 t
- 41 t
- -
|
|
- Maintenance Superintendent
- Mine Manager
- Project Manager
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- General Manager
- Mine Manager
|
- ..............................
 - ..............................

|
|
............
|
|
|
|
|
|
|
- Maintenance Planner
- Technical Services Manager
|
- Louisa Gabara
- Dorianne Odendaal
|
|
+27-(0)-11-770-6800
|
|
............................
|
|
|
|
|
- Mineral Resource Manager
- Mining Manager
- Plant Manager
- Procurement Specialist
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill (long hole)
- Drill jumbo (single boom)
- Drill jumbo (two boom)
- Forklift
- Grader
- Loader (FEL)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Scissor Lift
- Trans Mixer
- Truck (boom)
- Truck (underground)
- Truck (underground)
- Truck (underground)
|
- -
- -
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
- -
- -
- -
- -
- -
- -
- -
- 8 cu. yd
- 6 cu. yd
- 3.5 cu. yd
- 2 cu. yd
- 1.5 cu. yd
- -
- -
- -
- 35 t
- 45 t
- 50 t
|
|
- Director of Environment & Sustainability
- Mill Manager
- Mine Captain
- Mine Manager
- Mine Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
|
|
............
|
|
............................
|
|
|
|
|
- Maintenance Director
- Sr. Environmental Manager
- Sr. Mine Manager
- Sr. Mine Planner
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe loader^
- Drill (long hole)^
- Drill jumbo (two boom)^
- Excavator^
- Explosives Charger^
- Grader^
- Loader^
- Loader^
- Loader^
- Truck (haul)^
- Truck (underground)^
|
|
- -
- -
- -
- 120 t
- -
- -
- 7 cu. m
- 5 cu. m
- -
- 90 t
- 60 t
|
|
- Chief Executive Officer
- General Manager
- Managing Director
- Project Director
- VP, Corporate Development
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill (blasthole)^
- Excavator^
- Grader^
- Truck (haul)^
- Truck (water)^
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer
- Dragline
- Drill
- Excavator
- Excavator
- Grader
- Loader
- Truck (fuel / lube)
- Truck (haul)
- Truck (water)
|
- -
- -
- -
- -
- .................................
 - -
- -
- -
- -
- -
|
|
|
- Environmental Superintendent
- General Manager
- Health & Safety Manager
- Maintenance Manager
- Mine Superintendent
- Procurement Superintendent
- Technical Services Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Equipment Maintenance Manager
- General Manager
- Open Pit Mine Manager
- Project Superintendent
- Purchasing Manager
- Purchasing Superintendent
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
|
|
............
|
|
|
- Drill jumbo (two boom)
- Load-Haul-Dump (LHD)
- Load-Haul-Dump (LHD)
- Truck (haul)
- Truck (haul)^
|
- -
- Caterpillar R2900
- -
- Caterpillar AD60
- Caterpillar AD60^
|
|
|
- Chief Executive Officer
- Mining Manager
- Processing Manager
- Project Manager
- Project Superintendent
|
- Paul Huet
- Wayne Gough
- Dennis Nunn
- Colin Harken
- Philip Botha
|
|
+61-8-9278-6500
|
|
............................
|
|
|
|
|
- Maintenance Planner
- Maintenance Superintendent
- Project Manager
- Senior Manager, Capital Projects & Technologies
- Sr. Manager Maintenance and Reliability
- VP, Health, Safety, Security Environment & Quality
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Backhoe
- Dozer
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Grader
- Loader
- Loader
- Loader
- Shovel (hydraulic)
- Shovel (rope)
- Shovel (rope)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (water)
- Truck (water)
- Truck (water)
- Truck (water)
|
- .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Health & Safety Manager
- Health, Safety & Training Superintendent
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................
 - .................................
 - .................................

|
|
|
- Maintenance Superintendent
|
- ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Executive Officer
- Maintenance Superintendent
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Operating Officer
- Executive VP
- Managing Director
- Metallurgical Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe
- Dozer
- Loader
- Truck (dump)
- Truck (dump)
|
|
- 428 HP
- -
- 330 HP
- 400 HP
- 350 HP
|
|
- CEO
- Director, Projects
- Mine Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Load-Haul-Dump (LHD)
- Truck (haul)
|
|
|
|
- Planning Superintendent
- Project Manager
- Sr. Maintenance Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Drill (long hole)^
- Drill jumbo (two boom)^
- Grader^
- Load-Haul-Dump (LHD)^
- Scissor Lift^
- Truck (haul)^
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill^
- Loader (FEL)^
- Shovel (hydraulic)^
- Shovel^
- Truck (haul)^
- Truck (haul)^
|
- .................................
 - -
- -
- -
- .................................
 - -
- -
|
|
|
|
- ..............................

|
|
............
|
|
|
|
|
|
|
- Chemical Laboratory Superintendent
- General Manager Technical
- Maintenance Superintendent
- Mine Planning Superintendent
- Mine Scheduling and Projects Manager
- Mobile Equipment Maintenance Superintendent
- Technical Manager
- Underground General Manager
|
- Cris Dew
- Geraldine Lyons
- Thomas Dormenval
- Eric Hoffmann
- Braden York
- Steve Woodruff
- Erick Franco
- Nathan Foster
|
|
801-204-2025
|
|
............................
|
|
|
|
|
- General Manager Health & Safety
- Mine Manager
- Sr. Project Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)
- Dozer (crawler)
- Dozer (rubber tire)
- Drill
- Drill
- Excavator
- Excavator
- Excavator
- Grader
- Grader
- Loader
- Loader
- Truck (haul)
- Truck (water)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- -
|
- -
- -
- 4.633 m blade
- 150 mm
- 229 mm
- -
- -
- -
- 4.677 m blade
- 4.267 m blade
- -
- -
- 65 t
- 56781 l
- 30283 l
|
|
- Engineering Superintendent
- Environmental Manager
- Fleet Maintenance Manager
- Mining Manager
- Mobile Equipment Reliability Engineer
- Process Plant Manager
- Supply Chain Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill
- Drill (long hole)
- Drill (long hole)
- Drill jumbo (single boom)
- Load-Haul-Dump (LHD)
- Scoop Tram
- Truck (underground)
- Truck (underground)
|
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- -
|
|
|
- Operations Manager
- Process Plant Manager
- Superintendent Logistics
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bulldozer
- Bulldozer
- Excavator
- Excavator
- Excavator
- Grader
- Loader (FEL)
- Loader (FEL)
- Loader (FEL)
- Truck (dump)
- Truck (dump)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................

|
|
|
- Maintenance Superintendent
- Mobile Equipment Maintenance Manager
- Mobile Maintenance Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Maintenance Superintendent
- Mobile Equipment Maintenance Manager
- Senior Buyer
- Senior Maintenance Planner
- Supply Chain Director
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Dozer (crawler)^
- Grader^
- Loader (FEL)^
- Truck (haul)^
|
- .................................
 - .................................
 - .................................
 - -
- -
|
|
|
- CEO
- Chief Operating Officer
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Bolter
- Drill
- Drill
- Drill (long hole)
- Explosives Charger
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Loader
- Scaler
- Scaler
- Shotcreter
- Shotcreter
- Trans Mixer
- Truck (haul)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
|
|
- Maintenance Manager
- Mine Manager
- Process Superintendent
- Site Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- ANFO Loader^
- Bolter^
- Concrete sprayer^
- Crane^
- Crane^
- Forklift^
- Jumbo^
- Loader (mini)^
- Loader^
- Loader^
- Loader^
- Personnel Carrier^
- Scissor Lift^
- Shotcreter^
- Truck (boom)^
- Truck (fuel / lube)^
- Truck (haul)^
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- .................................
 - .................................
 - -
- -
- -
- -
- -
- -
|
- -
- -
- -
- 20 t
- 55 t
- 3 t
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
|
|
- Consultant - Mining
- Consultant - Recovery Methods & Costs
- Project Director
- Safety Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- Laboratory Manager
- Metallurgical Manager
- Technical Manager
- Ventilation & Occupational Health Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Scoop Tram
- Truck (underground)
|
- .................................
 - .................................

|
|
|
- Mine Manager
- Mine Production Manager
- Project Manager
- Section Manager
- Sr. General Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Managing Director and CEO
- Project Director
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dragline
- Dragline
- Dragline
- Dragline
- Shovel
- Shovel
- Shovel
- Shovel
- Shovel
- Shovel
- Shovel
- Shovel
- Shovel
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
- Truck (haul)
|
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................

|
- 165 cu. yd
- 167 cu. yd
- 168 cu. yd
- 169 cu. yd
- 50 cu. yd
- 65 cu. yd
- 36 cu. yd
- 84 cu. yd
- 53 cu. yd
- 84 cu. yd
- 68 cu. yd
- 53 cu. yd
- 84 cu. yd
- 240 tons
- 255 tons
- 255 tons
- 255 tons
- 320 tons
- 360 tons
|
|
- Electrical Superintendent
- Production Superintendent
- Safety Manager
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer (crawler)^
- Dozer^
- Drill^
- Grader^
- Loader^
- Shovel (hydraulic)^
- Truck (haul)^
- Truck (water)^
|
- -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
|
- 580 HP
- 627 HP
- -
- -
- 24 cu. m
- 25 cu. m
- 220 t
- 30,000 gal.
|
|
- Procurement Specialist
- VP, Processing & Metallurgy
- VP, Projects
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
|
- ..............................

|
|
............
|
|
............................
|
|
- .................................

|
|
|
- General Manager
- Maintenance Asset Intergration Manager
- Mine Planning Manager
- Mine Scheduling Superintendent
- Mining Superintendent
- Planning Manager
- Project Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
|
- Cable reel truck^
- Crane^
- Dozer (crawler)^
- Dozer (crawler)^
- Drill^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader^
- Loader^
- Loader^
- Scissor Lift^
- Shovel^
- Truck (fuel / lube)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (haul)^
- Truck (water)^
|
|
- 10 t
- 30 t
- 450 kW
- 325 kW
- 254 mm
- 144 mm
- 203 mm
- 22 cu. m
- 4.5 cu. m
- 3 cu. m
- 5.5 m blade
- 4.9 m blade
- 19 cu. m
- 12 cu. m
- 7 cu. m
- -
- 34 cu. m
- -
- -
- 230 t
- 40 t
- -
- -
|
- 1
- 1
- 3
- 3
- 2
- 2
- 4
- 2
- 1
- 1
- 5
- 1
- 1
- 2
- 1
- 1
- 3
- 2
- 18
- 21
- 4
- 2
- 3
|
- Consultant - Mining & Costs
- Consultant - Recovery Methods & Costs
- VP, Projects
|
- Marc Schulte
- Robin Kalanchey
- Alastair Tiver
|
|
+1-(250)-567-3276
|
|
............................
|
|
- -
- .................................
 - .................................

|
|
|
- Health & Safety Superintendent
- Managing Director
- Technical Services Superintendent
|
- ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Chief Operating Officer
- Director & General Manager
- Mine Manager
- Mine Planning Manager
|
- ..............................
 - ..............................
 - ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer^
- Drill^
- Grader^
- Loader (FEL)^
- Truck (dump)^
- Truck (water)^
|
|
- 580 HP
- -
- 297 HP
- 16 cu. yd
- 100 tons
- 12000 gal.
|
|
|
- ..............................

|
|
............
|
|
............................
|
- Backhoe^
- Compactor^
- Crane^
- Dozer^
- Dozer^
- Drill^
- Drill^
- Excavator^
- Excavator^
- Grader^
- Grader^
- Loader (FEL)^
- Loader (FEL)^
- Loader (FEL)^
- Personnel Carrier^
- Personnel Carrier^
- Truck (haul)^
- Truck (haul)^
- Truck (service)^
- Truck (water)^
- Truck (water)^
|
- .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................

|
|
|
|
- ..............................

|
|
............
|
|
............................
|
|
|
|
|
- Project Controls Manager
- Sr. Engineering Manager - Projects
|
- ..............................
 - ..............................

|
|
............
|
|
............................
|
- Dozer
- Dozer
- Dozer
- Drill
- Excavator
- Excavator
- Grader
- Loader
- Loader
- Loader - Tool Carrier
- Loader (FEL)
- Shovel (hydraulic)
- Truck (fuel / lube)
- Truck (haul)
- Truck (haul)
- Truck (service)
- Truck (water)
|
- .................................
 - .................................
 - .................................
 - .................................
 - -
- -
- .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - .................................
 - -
- .................................
 - .................................
 - -
- -
|
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- 12 cu. m
- 23 cu. m
- -
- 218 t
- -
- -
- -
|
|