Search Criteria
Asset Type        
Status

Search result: 6 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Type Production, Grades and Recovery Rates for 2019   
Asset
Mine
Project
Report
Gold Silver Copper Lead Zinc Molybdenum
Metal / Metal in conc.
Head Grade
Recovery Rate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
Concentrate
Metal / Metal in conc.
Head Grade
Recovery Rate
Concentrate Grade
koz g/t % koz g/t % kt M lbs % % % kt M lbs % % % kt M lbs % % % kt M lbs % % %
AssetMineProjectReportGoldGold HGGold RRSilverSilver HGSilver RRCopper Conc.CopperCopper HGCopper RRCopper CGLead Conc.LeadLead HGLead RRLead CGZinc Conc.ZincZinc HGZinc RRZinc CGMolybdenum Conc.MolybdenumMolybdenum HGMolybdenum RRMolybdenum CG
Ethiopia
........................ Subscription required
Subscription required
24  
4.9  
93  
6  
2.3  
50    
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Ethiopia
........................ Subscription required
Subscription required
18  
3.1  
65  
57  
22.9  
30    
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Ethiopia
........................ Subscription required
Subscription required
240  
    
    
    
    
      
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Ethiopia
........................ Subscription required
Subscription required
35  
3  
31  
5  
0.7  
25    
2  
21.6  
87.4  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Ethiopia
........................ Subscription required
Subscription required
29  
20  
90  
    
    
      
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Ethiopia
........................ Subscription required
Subscription required
135  
2.1  
93.7  
    
    
      
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
Key Personnel
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
¨  Combined production. Please see the Property Profile for details.
Subscription required - Subscription is required.