Search Criteria
Asset Type        
Status

Search result: 9 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Open Pit
Underground
Project
Mining   Scale **
tpd
Processing Scale **
tpd
Backfill
Shaft depth, m
Life of Mine, y
Metrics Mining and Processing, kt
2023 2022 2021 2020 2019 2018 Projects
AssetOpen PitUGProjectMining ScaleProcessing ScaleBackfillShaft, mLife of MineMetrics202020192018201720162015Projects
Guinea
............................ Subscription required
36,0007,600
9.5
  • Annual processing capacity
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 3,000
  • 2.8
Guinea
............................ Subscription required
5
  • Annual processing capacity
  • 1,000
  • -
  • -
  • -
  • -
  • -
  • -
Guinea
............................ Subscription required
110,00016,550
7
  • Stripping / waste ratio
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 4.73
  • 6,983
  • 33,062
  • 40,045
  • 5,791
  • 5.09
  • 6,755
  • 34,349
  • 41,104
  • 6,026
  • 4.7
  • 6,689
  • 31,466
  • 38,155
  • 6,181
  • -
  • -
  • -
  • -
  • -
Guinea
............................ Subscription required
17
  • Daily processing rate
  • Annual ore mining rate
  • Annual processing rate
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 7
  • 2,565
  • 2,565
  • 0.88
Guinea
............................ Subscription required
15
Guinea
............................ Subscription required
14
Guinea
............................ Subscription required
92,00031,500
2
  • Annual processing capacity
  • Stripping / waste ratio
  • Total tonnes mined
  • Tonnes processed
  • 12,000
  • -
  • -
  • 10,900
  • 12,000
  • 1.91
  • 19,089
  • 11,047
  • 12,000
  • 1.65
  • 22,751
  • 9,800
  • 12,000
  • 2.48
  • 26,447
  • 9,500
  • -
  • 2.07
  • 20,508
  • 8,800
  • -
  • -
  • -
  • 10,500
  • -
  • -
  • -
  • -
Guinea
............................ Subscription required
26
  • Annual ore mining rate
  • -
  • -
  • -
  • -
  • -
  • -
  • 60,000
Guinea
............................ Subscription required
Operations
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ   Combined production. Please see the Property Profile for details.
**  Certain values are approximate and rounded. Calculated by AI algorithm.
CPF - Cemented paste backfill
CHF - Cemented hydraulic fill
CRF - Cemented rockfill
CBF - Cemented backfill (undefined)
UHF - Unconsolidated hydraulic fill
URF - Unconsolidated rockfill
BF    - Undefined backfill