Search Criteria
Asset Type        
Status
Search result: 102 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Open Pit
Underground
Project
Mining   Scale **
tpd
Processing Scale **
tpd
Backfill
Shaft depth, m
Life of Mine, y
Metrics Mining and Processing, kt
2023 2022 2021 2020 2019 2018 Projects
AssetOpen PitUGProjectMining ScaleProcessing ScaleBackfillShaft, mLife of MineMetrics202020192018201720162015Projects
Brazil
............................ Subscription required
23,000
BF
846
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • 4,888
  • 2,800
  • 7,968
  • 3,700
  • 10,395
  • 3,800
  • 9,303
  • 3,200
  • 6,200
  • 3,000
  • -
  • -
Brazil
............................ Subscription required
35,0003,550
17
Brazil
............................ Subscription required
6,900
30
  • Ore tonnes mined
  • 2,400
  • 2,300
  • 2,100
  • 1,900
  • -
  • -
  • -
Brazil
............................ Subscription required
75,0004,200
URF
2
  • Stripping / waste ratio
  • Waste
  • Ore tonnes mined
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • 11.99
  • 13,724
  • 1,144
  • 14,868
  • 1,514
  • 11.92
  • 25,384
  • 2,129
  • 27,513
  • 1,538
  • 7.85
  • 17,378
  • 2,214
  • 19,592
  • 1,670
  • 8.67
  • 12,140
  • 1,401
  • 13,541
  • 1,615
  • 6.34
  • 9,209
  • 1,452
  • 10,661
  • 1,379
  • -
  • -
  • -
  • -
  • -
Brazil
............................ Subscription required
9,000
28
  • Annual ore mining rate
  • Annual milling capacity
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 900
  • 900
  • 2.1
Brazil
............................ Subscription required
18
> 3,000
CPF, CRF, URF
12
  • Ore tonnes mined
  • Tonnes processed
  • 722
  • 1,311
  • -
  • 100
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
Brazil
............................ Subscription required
67,000
8
  • Stripping / waste ratio
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • 6.39
  • 3,222
  • 20,578
  • 23,800
  • 3,167
  • 6.43
  • 3,180
  • 20,442
  • 23,622
  • 3,383
  • 6.09
  • 3,267
  • 19,901
  • 23,168
  • 3,227
  • 6.55
  • 1,845
  • 12,082
  • -
  • 1,571
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
Brazil
............................ Subscription required
34,0008,000
CRF, URF
11
  • Daily processing rate
  • Annual processing rate
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 8
  • 2,900
  • 3.75
Brazil
............................ Subscription required
3
Brazil
............................ Subscription required
> 12,0007,100
17
  • Ore tonnes mined
  • Tonnes processed
  • 4,301
  • 2,476
  • 3,425
  • 2,422
  • 3,515
  • 2,477
  • 4,198
  • 2,401
  • 4,076
  • 2,266
  • 4,667
  • 2,264
  • -
  • -
Brazil
............................ Subscription required
40,0009,450
10
  • Ore tonnes mined
  • Tonnes processed
  • -
  • -
  • 3,304
  • 3,300
  • 3,295
  • 2,170
  • -
  • 3,300
  • -
  • 2,090
  • -
  • 2,270
  • -
  • -
Brazil
............................ Subscription required
40,0005,700
11.3
  • Annual processing capacity
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 2,000
  • 3.77
Brazil
............................ Subscription required
> 1,300
URF
3
  • Daily ore mining rate
  • Daily processing capacity
  • Annual processing capacity
  • Ore tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • -
  • 2
  • 720
  • 442
  • 444
  • 1.2
  • 2
  • 720
  • 447
  • 447
  • 1.3
  • 2
  • 720
  • 434
  • 433
  • 1.1
  • 2
  • 720
  • -
  • 433
  • 1.3
  • 2
  • 720
  • -
  • 377
  • -
  • -
  • -
  • -
  • -
Brazil
............................ Subscription required
9
100,00010,000
11
  • Daily processing rate
  • Annual ore mining rate
  • Annual processing rate
  • Stripping / waste ratio
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • 10
  • 3,650
  • 3,600
  • 9
200,00061,000
27
  • Daily milling rate
  • Daily milling capacity
  • Plant annual capacity
  • Ore tonnes mined
  • Waste
  • Tonnes milled
  • -
  • 65
  • 24,000
  • 29,508
  • -
  • 22,233
  • -
  • 65
  • 24,000
  • 26,319
  • -
  • 22,752
  • -
  • 65
  • 24,000
  • 37,294
  • -
  • 24,121
  • -
  • -
  • 24,000
  • 29,386
  • -
  • 19,192
  • -
  • 65
  • 24,000
  • 18,240
  • -
  • 11,911
  • 63
  • 65
  • 23,400
  • 33,788
  • 31,306
  • 22,929
  • -
  • -
  • -
  • -
  • -
  • -
> 160,000
50
260,000159,000
9
  • Plant annual capacity
  • Ore tonnes mined
  • Waste
  • Tonnes processed
  • -
  • -
  • -
  • -
  • 66,000
  • 42,252
  • 51,269
  • 56,422
  • 66,000
  • 52,379
  • 44,005
  • 60,046
  • 61,000
  • 52,653
  • 27,398
  • 54,255
  • 61
  • 49,535
  • 28,164
  • 57,621
  • 61,000
  • 47,910
  • 26,435
  • 54,141
  • -
  • -
  • -
  • -
33
  • Ore tonnes mined
  • 2,700
  • 2,600
  • 2,600
  • 2,600
  • 1,700
  • -
  • -
33
Operations
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ   Combined production. Please see the Property Profile for details.
**  Certain values are approximate and rounded. Calculated by AI algorithm.
CPF - Cemented paste backfill
CHF - Cemented hydraulic fill
CRF - Cemented rockfill
CBF - Cemented backfill (undefined)
UHF - Unconsolidated hydraulic fill
URF - Unconsolidated rockfill
BF    - Undefined backfill