Mining Intelligence and News
Australia

Mount Owen/Glendell Operation

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
  • Coal (metallurgical)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotMount Owen Glendell Operations (MGO) comprises of: Mount Owen open cut mine (MTO), including the MGO Coal Handling and Preparation Plant(CHPP); Glendell open cut mine (Glendell); and Ravensworth East open cut mine (Ravensworth East).

Mining and in-pit dumping at the MTO will continue in a south-easterly direction. Also continues dredging of tailings from the Eastern Rail Pit to West Pit and construction of a haul road, to allow progression of the Western Out Of Pit (WOOP) dump.

As November 2022, operations ceased at Glendell Mine. Glencore submitted an application for Modification (MOD) which seeking to extend the approved operating period for Glendell by two years.

Mining within the Ravensworth East mine will cease during 2024.

Progressive rehabilitation will continue in accordance with the most recent Rehabilitation Management Plan and Forward Program in all mines.
Related AssetsGlendell Mine, Mount Owen Mine, Ravensworth East Mine

Owners

SourceSource
CompanyInterestOwnership
Glencore plc. 100 % Indirect
Mt Owen Pty Ltd. (operator) 100 % Direct
Mt. Owen/Glendell Operations (MGO) is owned and managed by Mt Owen Pty Limited (Mt Owen), which is a wholly owned subsidiary of Glencore Coal Pty Limited (Glencore).

Deposit type

  • Sedimentary

Summary:

The Mt Owen Complex (MOC) is located at Hebden, approximately 20 km north-west of Singleton in the Upper Hunter Valley of NSW.

Mt Owen is situated between two regional thrust faults, the Hunter Thrust and the Hebden Thrust that limit the lateral extent of the coal seams. Seam dips vary throughout the deposit, with dips being steep (up to 45 ยบ ) in the areas near the Hunter and Hebden Thrusts where parallel thrusts dislocate the seam by up to 40 metres.

Up to 22 mineable coal intervals are recognised, ranging in thickness from 0.2 metre to 10 metres, within a stratigraphic interval of approximately 350 metres, the coal seams comprise a total thickness of approximately 55 metres.

The seams for which there is potential for economic extraction at Mt Owen include the Lemington Seams, Pikes Gully Seams, Arties Seams, Upper Liddell Seams, Middle Liddell Seams, Lower Liddell Seams, Barrett Seams, Upper Hebden Seams and the Lower Hebden Seams.

The mineable coal seams at Ravensworth East vary in thickness from 0.3 metres to 8.5 metres, and include the Ravensworth and Bayswater seams over a stratigraphic interval of approximately 130 metres (maximum) from the surface. These seams form part of the Jerry's Plains Sub-Group of the Whittingham Coal Measures.

Mineable coal seams at Glendell range in thickness from 0.3m to 3.5m including Pikes Gully, Arties, Upper Liddell, Middle Liddell, Lower Liddell and Barrett seams.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnits2024202320222021202020192018201720162015
Coal (metallurgical & thermal) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe8.5 7.6 7.6 8.3 8.1 
All production numbers are expressed as clean coal. ^ Guidance / Forecast.

Operational metrics

Metrics2024202320222021202020192018201720162015
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe14.7 Mt14.1 Mt14 Mt14.4 Mt13.9 Mt
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe71.8 Mbcm71.1 Mbcm68.4 Mbcm67.8 Mbcm59.2 Mbcm
Reject  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe6.26 Mt6.44 Mt6.01 Mt6.34 Mt
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe14.7 Mt14.1 Mt13.6 Mt
Plant annual capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
^ Guidance / Forecast.

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNamePhoneProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Dec 11, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 11, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Dec 11, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 11, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 11, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 11, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Dec 11, 2024

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required ...... Subscription required ...... Subscription required 2020
...... Subscription required ...... Subscription required ...... Subscription required 2019
...... Subscription required ...... Subscription required ...... Subscription required 2018
...... Subscription required ...... Subscription required ...... Subscription required 2017

Aerial view:

Lock

- subscription is required.