Mining Intelligence and News
Australia

Ravensworth East Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotRavensworth East Open Cut Mine (Ravensworth East) is part of the Mt. Owen/Glendell Operations (MGO).

As of 2022, Coal Reserves for Ravensworth East operations are sufficient to support the planned mine life of 1 year.
Related AssetNorthern System

Owners

SourceSource
CompanyInterestOwnership
Glencore plc. 100 % Indirect
Mt Owen Pty Ltd. (operator) 100 % Direct
Mt. Owen/Glendell Operations (MGO) is owned and managed by Mt Owen Pty Limited (Mt Owen), which is a wholly owned subsidiary of Glencore Coal Pty Limited (Glencore).

Deposit type

  • Sedimentary

Summary:

The mineable coal seams at Ravensworth East vary in thickness from 0.3 metres to 8.5 metres, and include the Ravensworth and Bayswater seams over a stratigraphic interval of approximately 130 metres (maximum) from the surface. These seams form part of the Jerry's Plains Sub-Group of the Whittingham Coal Measures.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits202320222021202020192018201720162015
Coal (thermal) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe0.8 0.9 0.8 0.8 
All production numbers are expressed as clean coal. ^ Guidance / Forecast.

Operational metrics

Metrics202320222021202020192018201720162015
Coal tonnes mined  ....  Subscribe  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe9.59 Mbcm10.2 Mbcm11.2 Mbcm9.34 Mbcm10.4 Mbcm
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.32 Mt1.55 Mt1.25 Mt
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.49 Mt of ROM coal1.31 Mt of ROM coal1.35 Mt of ROM coal1.28 Mt of ROM coal1.33 Mt of ROM coal
^ Guidance / Forecast.

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 9, 2023
....................... Subscription required ....................... Subscription required Subscription required Oct 9, 2023
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Oct 9, 2023
....................... Subscription required ....................... Subscription required Subscription required Oct 9, 2023

EmployeesYear
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017

Aerial view:

Lock

- subscription is required.