Mining Intelligence and News
Indonesia

Batu Hijau Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Gold
  • Copper
  • Silver
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotTogether, Batu Hijau mine and the Elang development project, form the fifth-largest copper-gold mining complex in the world in terms of copper-equivalent reserves.

From 2000 to 2016, Phases 1 through 6 were mined at Batu Hijau. Currently, Batu Hijau is in Phase 7 of its ore mining plan.

In 2021, AMNT initiated the Phase 8 pit cutback, which involves stripping activities expected to continue until 2026. Phase 8 ore production is projected to commence in 2025 and extend the mine's life after Phase 7 ore is depleted, continuing until 2030.

Concurrently, AMNT is advancing the Elang development project. AMNT began a definitive feasibility study for Elang in 2023, with the study anticipated to be completed in 2024. The study will inform the development of a mining operation at Elang, designed to begin production in 2031. The expansion projects, particularly the processing plant, are designed to accommodate the ore from Elang, which is expected to remain active until near 2050.

Owners

SourceSource
CompanyInterestOwnership
PT Amman Mineral Internasional Tbk. (AMI) 99.99 % Indirect
The Batu Hijau open pit copper/ gold mine is now owned and operated by PT Amman Mineral Nusa Tenggara (AMNT).

PT Amman Mineral Nusa Tenggara (“AMNT”) is 99.99% owned by PT Amman Mineral Internasional (“AMI”) and 0.01% by PT AP Investment (API).

PT Amman Mineral Internasional (“AMI”) is a holding company for world-class copper-gold mining operations, including the established, high quality and low-cost Batu Hijau mine.

Contractors

Lock

- subscription is required.

Deposit type

  • Porphyry

Summary:

The deposit is hosted by a central stock of multiple tonalite porphyries intruded into older diorite and andesite volcanic wallrocks and activities continue to develop the reserve.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityProductUnits2024202320222021202020192018201720162015
Gold Metal in concentrate koz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe56 71 397 841 676 
Copper Concentrate kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Copper Metal in concentrate M lbs  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe130 142 288 496 494 
Silver Metal in concentrate koz  ....  Subscribe  ....  Subscribe
^ Guidance / Forecast.

Operational metrics

Metrics2023202220212020201920182015
Daily processing capacity  ....  Subscribe  ....  Subscribe
Annual processing capacity  ....  Subscribe  ....  Subscribe
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe226 Mt146 Mt
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Daily mining capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe815 kt

Production Costs

CommodityUnits202420232022202120202019
C1 cash costs (sold) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 1.71 / lb **  
^ Guidance / Forecast.
** Net of By-Product.

Operating Costs

Currency2023202220212020201920182017
OP mining costs ($/t mined) USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Financials

Units202320222021202020192018
Sustaining costs M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Capital expenditures M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 147  
Revenue M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 388  
Operating Income M USD  ....  Subscribe  ....  Subscribe
Gross profit M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -57  
Pre-tax Income M USD  ....  Subscribe  ....  Subscribe
After-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -215   -167.7  
EBITDA M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -6  

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 20, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 20, 2024

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required ...... Subscription required ...... Subscription required 2020
...... Subscription required 2015

Aerial view:

Lock

- subscription is required.