Batu Hijau Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Gold
  • Copper
  • Silver
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotBatu Hijau mine is widely recognized for its high-quality concentrate and innovative, low-cost operation.

From 2000 to 2016, Phases 1 through 6 were mined at Batu Hijau. The mine completed Phase 7 production in 2024. Phase 8 waste removal continued during 2024; ore production is scheduled to begin in 2025 and continue until 2030.

In 2024, AMMAN's most significant accomplishment was the mechanical completion and commissioning of the smelter. Additionally, the expansion of the processing plant is underway.

In July 2024, the Batu Hijau mine was certified by The Copper Mark, the world’s leading assurance framework for responsible copper production.

Owners

SourceSource
CompanyInterestOwnership
PT Amman Mineral Internasional Tbk. (AMI) 99.99 % Indirect
PT Amman Mineral Nusa Tenggara (operator) 100 % Direct
The Batu Hijau mine is owned and operated by PT Amman Mineral Nusa Tenggara (AMNT).

PT Amman Mineral Nusa Tenggara (“AMNT”) is 99.99% owned by PT Amman Mineral Internasional (“AMI”) and 0.01% by PT AP Investment (API).

PT Amman Mineral Internasional (“AMI”) is a holding company for world-class copper-gold mining operations, including the established, high quality and low-cost Batu Hijau mine.

Contractors

Lock

- subscription is required.

Deposit type

  • Porphyry

Summary:

The deposit is hosted by a central stock of multiple tonalite porphyries intruded into older diorite and andesite volcanic wallrocks and activities continue to develop the reserve.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnits20252024202320222021202020192018201720162015
Gold Metal in concentrate koz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe56 71 397 841 676 
Copper Metal in concentrate M lbs  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe130 142 288 496 494 
Copper Concentrate kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Silver Metal in concentrate koz  ....  Subscribe  ....  Subscribe  ....  Subscribe
^ Guidance / Forecast.

Operational metrics

Metrics20242023202220212020201920182015
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe226 Mt146 Mt
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Daily processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Daily mining capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe815 kt

Production Costs

CommodityUnits202420232022202120202019
C1 cash costs (sold) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 1.71 / lb **  
** Net of By-Product.

Operating Costs

Currency20242023202220212020201920182017
OP mining costs ($/t mined) USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Mine Financials

Units20252024202320222021202020192018
Capital expenditures (planned) M USD  ....  Subscribe
Sustaining costs M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Capital expenditures M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 147  
Revenue M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 388  
Operating Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Gross profit M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -57  
Pre-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
After-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -215   -167.7  
EBITDA M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -6  

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jul 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Jul 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Jul 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Jul 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Jul 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Jul 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Jul 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Jul 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Jul 18, 2025

Workforce

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2024
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required ...... Subscription required ...... Subscription required 2020
...... Subscription required 2015

Aerial view:

Lock

- subscription is required.