Mine TypeOpen Pit
Study CompletedPrefeasibility
Commodities
  • Rutile
  • Graphite
Mining Method
  • Truck & Shovel / Loader
  • Dragline
  • Dry mining
Mine Life... Lock
SnapshotIn January 2025, the Optimised Prefeasibility Study (OPFS), conducted with Rio Tinto's collaboration, reaffirmed Kasiya’s potential as the largest, lowest-cost producer of natural rutile and flake graphite.

The OPFS focused on optimising key areas, including mining methods, plant configuration, tailings strategy, and water and power management, ensuring improved operational efficiency and economic outcomes compared to the 2023 PFS.

In November 2024, preliminary tests confirmed that Kasiya’s graphite meets the required specifications for refractory applications, further expanding its market potential.

Sovereign will advance the Definitive Feasibility Study (DFS), update the Mineral Resource Estimate (MRE), and continue graphite testwork to support potential offtake discussions.

Owners

SourceSource
CompanyInterestOwnership
Sovereign Metals Ltd. 100 % Indirect
Sovereign Metals Ltd. owns 100% of Kasiya Rutile-Graphite Project.

Contractors

Lock

- subscription is required.

Deposit type

  • Metamorphic hosted
  • Saprolite
  • Placer

Summary:

Kasiya is located on the Lilongwe Plain, which is underlain by the Basement Complex paragneisses and orthogneisses of the Mozambique Belt. The paragneiss unit (PGRG) is enriched in rutile and graphite and is the primary source of both minerals.

The mineralised PGRG t strikes north in the south of the deposit and then northeast around a central regional fold.

Rutile mineralisation lies in relatively flat lateral near-surface bodies in areas where the weathering profile is preserved and not significantly eroded. It is geologically continuous with limited variability along and across strike.

Rutile concentrations are generally highest near the surface, decreasing with depth. The high-grade rutile deposit at Kasiya is best described as a residual placer where the resistate minerals, including rutile, have been concentrated during in-situ weathering, which has depleted the less resistant minerals.

Rutile occurs in a mostly topographically flat area west of Malawi’s capital, known as the Lilongwe Plain, where a deep tropical weathering profile is preserved. A typical profile from top to base is generally soil (“SOIL” 0-1m) ferruginous pedolith (“FERP”, 1-4m), mottled zone (“MOTT”, 4-7m), pallid saprolite (“PSAP”, 7-9m), saprolite (“SAPL”, 9-25m), saprock (“SAPR”, 25-35m) and fresh rock (“FRESH” >35m).

The rutile deposit type is considered a residual placer formed by the intense weathering of rutile-rich basement paragneisses and variable enrichment by elluvial processes.

Graphite mineralisation as reported in the Mineral Resource Estimate (MRE) is depleted near surface, with higher grades occurring from 6m and deeper in mottled and saprolite units. Graphite mineralisation extends into the saprock and fresh rock, but this extension is currently not included in the MRE.

The low-grade graphite mineralisation occurs as multiple bands of graphite gneisses, hosted within a broader Proterozoic paragneiss package. In the Kasiya areas specifically, the preserved weathering profile hosts significant vertical thicknesses, from near surface, of graphite mineralisation.

The Kasiya mineralised footprint strikes NE – SW and currently occupies an area of about 201 km2.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnitsAvg. AnnualLOM
Rutile Concentrate kt 2225,547
Graphite Concentrate kt 2336,281

Operational metrics

Metrics
Annual ore mining rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2025 study.

Production Costs

CommodityUnitsAverage
Cash costs Rutile+Graphite USD  ....  Subscribe
Cash costs Rutile USD  ....  Subscribe
Cash costs Graphite USD  ....  Subscribe
Total cash costs Rutile+Graphite USD  ....  Subscribe
Assumed price Rutile USD  ....  Subscribe
Assumed price Graphite USD  ....  Subscribe
* According to 2025 study / presentation.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M USD  ......  Subscribe
Expansion CapEx $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
Gross revenue (LOM) $M USD  ......  Subscribe
Operating margin, %  ......  Subscribe
EBITDA (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 10% $M USD  ......  Subscribe
Pre-tax NPV @ 8% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe

Personnel

Mine Management

Job TitleNamePhoneProfileRef. Date
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Feb 17, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 17, 2025

Workforce

EmployeesYear
...... Subscription required 2025