Mining Intelligence and News
Australia

Molyhil Project

Click for more information

Categories

Summary

Mine TypeOpen Pit
Study CompletedFeasibility
StagePermitting
Commodities
  • Tungsten
  • Molybdenum
  • Copper
Mining Method
  • Truck & Shovel / Loader
Mine Life... Lock
SnapshotThe updated Mineral Resource Estimate for Molyhil, dated May 28, 2024.

16 September 2025, the Tivan Limited is announce that Tivan has signed a Binding Term Sheet to acquire 100% of the Molyhil Tungsten-Molybdenum Project.

The Tivan will not rely on the outcomes of previous technical and economic studies completed for the Molyhil Project, and reviewed as part of due diligence, but will instead undertake as an initial study phase a Pre-Feasibility Study on the basis of the existing Mineral Resource estimate. This will ensure that the feasibility of the Molyhil is assessed consistent with Tivan’s rigorous technical and economic assessment framework and enable Tivan’s project team to assess and optimise coordination with the Sandover Fluorite Project.

In parallel Tivan will progress its own metallurgical testwork program for the Project in support of flowsheet development.

Owners

SourceSource
CompanyInterestOwnership
Investigator Resources Ltd. 25 % Indirect
Thor Energy Plc. 75 % Indirect
The Molyhil Tungsten–Molybdenum Project is owned by the FRAM joint venture. Thor Energy holds 75% of the FRAM JV through its subsidiary Molyhil Mining Limited (“Molyhil”), and Investigator Resources Limited holds the remaining 25%.

16 September 2025, the Tivan Limited is announce that Tivan has signed a Binding Term Sheet with Fram Resources Pty Ltd, a subsidiary of Investigator Resources Limited and Molyhil Mining Pty Ltd , a subsidiary of Thor Energy Plc. to acquire 100% of the Molyhil Tungsten-Molybdenum Project.

The parties will now move to meet certain conditions precedent to achieve Completion in a timely manner with an indicative target of December 2025.

Contractors

Lock

- subscription is required.

Deposit type

  • Skarn

Summary:

The Molyhil Tungsten Project is a W-Mo deposit that is hosted predominantly within a Fe-enriched altered magnetite skarn that overprints meta-carbonate units of the Deep Bore metamorphic sequence at the contact of a large intrusion of peraluminous monzogranite, Marshall granite.

The Molyhil area is amongst a range of west-northwest trending 10-100km crustal scale shear zones, including the Delny Shear zone, which have caused widespread structural adjustment of geology in the area. A number of smaller faults are believed to have been activated and reactivated over the long tectno-thermal cycle of these regional shear and fault zones from 1.79 -1.70 Ga.

The Molyhil deposit consists of two adjacent outcropping iron rich skarn bodies, enclosed in granite, that contain powellite, scheelite and molybdenite mineralisation. The bodies are arranged in an en- echelon manner, the northeast body being named the Yacht Club Lode and the southwest body the Southern Lode.

Molyhil is comprised of two north-south trending, magnetite altered, mineralised zones that plunge 65° to the south and dip steeply to the east. The larger Southern Lode (approx. 55m x 65m x 360m (width x length x depth), to a vertical depth of approx. 320m) and smaller Yacht Club Lode (approx. 55m x 60m x 250m (width x length x depth), to a vertical depth of 200m) are separated by foliated, compositionally layered paragneiss and meta-carbonate rocks of the Deep Bore Metamorphic sequence.

The deposit comprises of massive and disseminated Scheelite (CaWO4), Powellite (CaMoO4), Molybdenite (MoS2) together with magnetite. Mineralisation is layer parallel and occurs primarily within horizons of the cackleberry meta-carbonate that has been altered to diopside skarn at contacts with the Marshall Granite.

The mineralised meta-carbonate exoskarn alteration comprises predominantly of garnet-scapolite-diopside- hedenbergite whilst the endo skarn granite consists of microcline-actinolite-diopsidequartz-calcite- biotite.

The deposit has a number of crosscutting structures that have offset some mineralisation including the Yacht Club Fault, a dextral fault trending east-southeast. This fault offsets and slightly rotates the Yacht club and southern orebodies which are believed to be fault displaced sections of a singular mineralised body. This faulting is typically associated with possible Neoproterozoic stage carbonate- fluorite-barite veining that crosscuts mineralisation and granite alike.

Mineralisation is coarse-grained and its distribution is irregular. Two broad lithological variations are present within each of the two main skarns:

- “Black rock skarn”: Mineralised (which, historically, was selectively mined on the basis of its colour) a calc-silicate containing a high proportion of magnetite, pyrite, and iron-rich minerals such as andradite-garnet, actinolite, and ferro-amphibole. This unit is irregularly mineralised with scheelite, molybdenite, and chalcopyrite. The mineralisation is, in general, both coarsegrained and heterogeneous. Decimetre wide bands rich in molybdenite and/or scheelite are separated by metre scale bands of barren/low grade black rock skarn.

- Unmineralised (little to no Fe/W/Mo/Cu) skarn: a pale green calc-silicate rock containing diopsidic pyroxene and garnet.

Dimensions
The Molyhil resource area extends over a combined strike length of 300m from 19,850mN to 20,150mN, a plan width of 250m from 9,950mE to 10,200mE and includes the vertical extent of 290m from 410mRL (surface) to 100mRL.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnitsAvg. AnnualLOM
WO3 Oxide in concentrate kt 1.28.6
Molybdenum Metal in concentrate t 3,133
WO3 Concentrate kt 1.2

Operational metrics

Metrics
Annual processing rate 531 kt *
Stripping ratio 7.6 *
Waste tonnes, LOM 27,053 kt *
Ore tonnes mined, LOM 3,543 kt *
Tonnes processed, LOM 3,543 kt *
* According to 2018 study.

Production Costs

CommodityUnitsAverage
C1 cash costs WO3 USD 90 / mtu * **  
* According to 2018 study / presentation.
** Net of By-Product.

Operating Costs

CurrencyAverage
OP mining costs ($/t milled) AUD  ....  Subscribe
* According to 2018 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M AUD  ......  Subscribe
Gross revenue (LOM) $M AUD  ......  Subscribe
EBITDA (LOM) $M AUD  ......  Subscribe
After-tax NPV @ 5% $M AUD  ......  Subscribe
After-tax NPV @ 10% $M AUD  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 16, 2025
....................... Subscription required ....................... Subscription required Subscription required Oct 16, 2025

Workforce

Aerial view:

Lock

- subscription is required.