Mining Intelligence and News
Peru

Alpamarca Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Zinc
  • Lead
  • Copper
  • Silver
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Alpamarca pit is part of the Alpamarca Operation.

The exploitation of the Alpamarca pit is projected until July 2024, after wich the concentrator plant will process ore produced in the pits and ore from stockpiles.
Related AssetAlpamarca Operation

Owners

SourceSource
CompanyInterestOwnership
Glencore plc. 23.3 % Indirect
Compañía Minera Chungar S.A.C. (operator) 100 % Direct
Volcan Compañía Minera S.A.A. is a subsidiary of Glencore AG, which is a subsidiary of Glencore Plc., owner of 63% of common class A voting shares and an economic interest of 23%, excluding treasury shares.

Compañía Minera Chungar S.A.C. is a wholly-owned subsidiary Volcan Compañía Minera S.A.A., and has two mining units, Animon and Alpamarca.

In Q4 2022, Glencore commenced a process to dispose of its 23.3% economic interest in Volcan, which is ongoing. As a result, the carrying amounts of Volcan assets and liabilities as at 31 December 2023 and 31 December 2022 are classified as held for sale.

Deposit type

  • Vein / narrow vein

Summary:

The Alpamarca deposit is a structurally-controlled vein-type deposit located in the Pacaros district of the province of Huaral.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits2023202220212020
Zinc t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Lead t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Silver oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Operational metrics

Metrics202320222021202020192018201720162015
Stripping / waste ratio  ....  Subscribe  ....  Subscribe  ....  Subscribe13.8 4.4 2 7.8 10.6
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe552 kt438 kt958 kt910 kt713 kt
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe7,620 kt1,930 kt1,700 kt7,600 kt7,600 kt
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Daily mining capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 12, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 12, 2024

Aerial view:

Lock

- subscription is required.