Search Criteria
Asset Type        
Status
Search result: 79 assets.
Add Search Criteria
Main Categories
Company Asset
Stage Status
Commodity Location
Mine Type Mining Method
Deposit Ore Processing
Type, select and click "Add"  
                                    
Asset
Open Pit
Underground
Project
Mining   Scale **
tpd
Processing Scale **
tpd
Backfill
Shaft depth, m
Life of Mine, y
Metrics Mining and Processing, kt
2023 2022 2021 2020 2019 2018 Projects
AssetOpen PitUGProjectMining ScaleProcessing ScaleBackfillShaft, mLife of MineMetrics202020192018201720162015Projects
Brazil
............................ Subscription required
23,000
BF
846
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • 4,888
  • 2,800
  • 7,968
  • 3,700
  • 10,395
  • 3,800
  • 9,303
  • 3,200
  • 6,200
  • 3,000
  • -
  • -
Brazil
............................ Subscription required
35,0003,550
17
Brazil
............................ Subscription required
6,900
30
  • Ore tonnes mined
  • 2,400
  • 2,300
  • 2,100
  • 1,900
  • -
  • -
  • -
Brazil
............................ Subscription required
75,0004,200
URF
2
  • Stripping / waste ratio
  • Waste
  • Ore tonnes mined
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • 11.99
  • 13,724
  • 1,144
  • 14,868
  • 1,514
  • 11.92
  • 25,384
  • 2,129
  • 27,513
  • 1,538
  • 7.85
  • 17,378
  • 2,214
  • 19,592
  • 1,670
  • 8.67
  • 12,140
  • 1,401
  • 13,541
  • 1,615
  • 6.34
  • 9,209
  • 1,452
  • 10,661
  • 1,379
  • -
  • -
  • -
  • -
  • -
Brazil
............................ Subscription required
18
> 3,000
CPF, CRF, URF
12
  • Ore tonnes mined
  • Tonnes processed
  • 722
  • 1,311
  • -
  • 100
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
Brazil
............................ Subscription required
67,000
8
  • Stripping / waste ratio
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • 6.39
  • 3,222
  • 20,578
  • 23,800
  • 3,167
  • 6.43
  • 3,180
  • 20,442
  • 23,622
  • 3,383
  • 6.09
  • 3,267
  • 19,901
  • 23,168
  • 3,227
  • 6.55
  • 1,845
  • 12,082
  • -
  • 1,571
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
Brazil
............................ Subscription required
3
Brazil
............................ Subscription required
> 12,0007,100
17
  • Ore tonnes mined
  • Tonnes processed
  • 4,301
  • 2,476
  • 3,425
  • 2,422
  • 3,515
  • 2,477
  • 4,198
  • 2,401
  • 4,076
  • 2,266
  • 4,667
  • 2,264
  • -
  • -
Brazil
............................ Subscription required
40,0009,450
10
  • Ore tonnes mined
  • Tonnes processed
  • -
  • -
  • 3,304
  • 3,300
  • 3,295
  • 2,170
  • -
  • 3,300
  • -
  • 2,090
  • -
  • 2,270
  • -
  • -
Brazil
............................ Subscription required
> 1,300
URF
3
  • Daily ore mining rate
  • Daily processing capacity
  • Annual processing capacity
  • Ore tonnes mined
  • Tonnes processed
  • -
  • -
  • -
  • -
  • -
  • -
  • 2
  • 720
  • 442
  • 444
  • 1.2
  • 2
  • 720
  • 447
  • 447
  • 1.3
  • 2
  • 720
  • 434
  • 433
  • 1.1
  • 2
  • 720
  • -
  • 433
  • 1.3
  • 2
  • 720
  • -
  • 377
  • -
  • -
  • -
  • -
  • -
Brazil
............................ Subscription required
9
Brazil
............................ Subscription required
11,0008,600
CPF, CRF
700
18
  • Daily processing capacity
  • Annual processing capacity
  • Ore tonnes mined
  • Total tonnes mined
  • Tonnes processed
  • -
  • 4,200^
  • -
  • -
  • 3,300^
  • 9.6
  • 3,200
  • -
  • -
  • 2,864
  • 9.6
  • 3,200
  • 2,259
  • -
  • 2,371
  • 9.6
  • 3,200
  • 2,251
  • -
  • 2,272
  • -
  • -
  • 2,460
  • 3,255
  • 2,425
  • -
  • -
  • 2,300
  • 5,933
  • 2,258
  • -
  • -
  • -
  • -
  • -
Brazil
............................ Subscription required
URF
3
  • Annual processing capacity
  • Ore tonnes mined
  • Waste
  • Total tonnes mined
  • Tonnes milled
  • -
  • 800^
  • -
  • -
  • -
  • -
  • 686
  • -
  • -
  • 746
  • 800
  • 511
  • 493
  • 1,004
  • 732
  • -
  • 799
  • 1,926
  • 2,724
  • 781
  • -
  • 469
  • 4,850
  • -
  • 774
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
  • -
Brazil
............................ Subscription required
68
  • Annual mining capacity
  • Plant annual capacity
  • -
  • -
  • 120,000
  • 40,000
  • 120,000
  • 40,000
  • 120,000
  • -
  • 120,000
  • -
  • 103,000
  • -
  • -
  • -
200,00061,000
27
  • Daily milling rate
  • Daily milling capacity
  • Plant annual capacity
  • Ore tonnes mined
  • Waste
  • Tonnes milled
  • -
  • 65
  • 24,000
  • 29,508
  • -
  • 22,233
  • -
  • 65
  • 24,000
  • 26,319
  • -
  • 22,752
  • -
  • 65
  • 24,000
  • 37,294
  • -
  • 24,121
  • -
  • -
  • 24,000
  • 29,386
  • -
  • 19,192
  • -
  • 65
  • 24,000
  • 18,240
  • -
  • 11,911
  • 63
  • 65
  • 23,400
  • 33,788
  • 31,306
  • 22,929
  • -
  • -
  • -
  • -
  • -
  • -
> 160,000
50
260,000159,000
9
  • Plant annual capacity
  • Ore tonnes mined
  • Waste
  • Tonnes processed
  • -
  • -
  • -
  • -
  • 66,000
  • 42,252
  • 51,269
  • 56,422
  • 66,000
  • 52,379
  • 44,005
  • 60,046
  • 61,000
  • 52,653
  • 27,398
  • 54,255
  • 61
  • 49,535
  • 28,164
  • 57,621
  • 61,000
  • 47,910
  • 26,435
  • 54,141
  • -
  • -
  • -
  • -
33
  • Ore tonnes mined
  • 2,700
  • 2,600
  • 2,600
  • 2,600
  • 1,700
  • -
  • -
33
Operations
*** Multi - mine Operation
*    Part of an Operation
^   Guidance / Forecast / Projected Avg. Annual
ยจ   Combined production. Please see the Property Profile for details.
**  Certain values are approximate and rounded. Calculated by AI algorithm.
CPF - Cemented paste backfill
CHF - Cemented hydraulic fill
CRF - Cemented rockfill
CBF - Cemented backfill (undefined)
UHF - Unconsolidated hydraulic fill
URF - Unconsolidated rockfill
BF    - Undefined backfill