Mining Intelligence and News
Australia

Tritton Operation

Click for more information

Categories

Overview

Mine TypeUnderground
StatusActive
Commodities
  • Copper
  • Gold
  • Silver
Mining Method
  • Sub-level open stoping (SLOS)
  • Bench stoping
  • Longhole open stoping
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotTritton Operations features an underground mining complex that feeds a conventional processing plant. Copper concentrate produced at the operation is railed to the Port of Newcastle for export to customers internationally.

Tritton Operation key deposits:
• In production - Tritton, Budgerygar, Avoca Tank, Murrawombie underground;
• Development Ready - Murrawombie open pit,
• Study Phase - Constellation.

The Murrawombie open pit mining is expected start date in November 2024. The pit will be mined in two phases, with 1.2Mt ore supplied to the mill over FY25 and FY26.

Constellation deposit:
• Updated Mineral Resource Q3 FY25.
• Mining study on underground, open pit and heap leach to be completed following resource update.
• Advancing EIS and permitting activities for a future mining operation.
Related AssetsMurrawombie Mine, Tritton Mine

Owners

SourceSource
CompanyInterestOwnership
Aeris Resources Ltd. 100 % Indirect
Tritton Resources Pty Ltd (operator) 100 % Direct
The Tritton Copper Operations is operated by Tritton Resources Pty Ltd, a 100% owned subsidiary of Aeris Resources Limited.

Contractors

Lock

- subscription is required.

Deposit type

  • VMS

Summary:

The Tritton Copper Operations consists of Tritton Operation Tritton, Budgerygar, Avoca Tank, Murrawombie and Constellation deposits.

The Tritton mine includes Tritton and Budgerygar deposits.

Tritton deposit
The Tritton deposit is a sulphide copper mineralised body located on ML1544 in central New South Wales (NSW), Australia. The deposit geology is best described as a structurally controlled sulphide deposit. Copper mineralisation, in the form of chalcopyrite is associated with a late-stage regional deformational event.

Sulphide mineralisation within the Tritton tenement package has been classified as either a structurally controlled epigenetic sulphide system or a stratiform “Besshi style” volcanogenic massive sulphide (VMS) deposit. Recent geological investigations at both the Tritton and Murrawombie deposits have identified a sulphide mineralisation occurring late in the structural deformation events. There is decreasing support for the VMS model of deposit formation as we can better undertsnading of the deposits.

Sulphide mineralisation is dominated by massive, banded and stringer pyrite +/- chalcopyrite, with a relatively consistent massive pyrite – chalcopyrite unit along the hanging wall contact. Alteration assemblages adjacent to mineralisation are characterized by an ankerite/chlorite footwall and silica sericite hanging wall.

The main Tritton mineralised zone is tabular in nature with an overall down dip length of 1.9 kilometres with mineralisation still open at depth. Mineralisation begins at approximately 155m below surface (5,115mRL). The main body varies in thickness averaging 6-8m above the main “roll over” at 4,500mRL. Below the “roll over” the mineralised sulphide package thickens with true widths in the order of 15 to 30m to 4,300mRL. Below this the mineralised body dips at a shallower angle (25) and thickens to 70m thick down to the 3,970mRL. The mineralised system below 4,300mRL level is influenced by a NW-SE trending F4 fold corridor. Within the fold corridor the mineralised system becomes progressively deformed and is responsible for the geometry change (N-S trend to E-W trend) and increased thickness.

Budgerygar Deposit
The Budgerygar mineralised system is tabular in nature with an overall down dip length of 750m with mineralisation still open at depth. Mineralisation begins at approximately 70m below surface (5,200mRL). The mineralised lodes vary in thickness averaging 6-10m and dip between 35° - 45° east. Strike extents vary from 50m to 150m.

Murrawombie Deposit
The Murrawombie deposit is a sulphide copper deposit located on ML1280 in central New South Wales (NSW), Australia. The deposit geology is best described as a structurally controlled sulphide deposit. Copper mineralisation, in the form of chalcopyrite is associated with a late-stage regional deformational event.

Copper mineralisation at the Murrawombie deposit is hosted within early to mid-Ordovician turbidite sediments, forming part of the Girilambone Group. Turbidite lithologies range from shale, siltstone, fine grained sandstone and occasional medium-coarse grained sandstones. Occasional mafic sills intrude the sediment package. Several regional deformation events are evident at the Murrawombie deposit. Sulphides (pyrite and chalcopyrite) occur along sites of dilation associated with a later ductile deformational event. Post mineralisation faulting is common in the form of north-south striking (mine grid) graphitic faults.

The Murrawombie deposit consists of several elongate sulphide envelopes orientated parallel to a pervasive S2 fabric which is interpreted as forming parallel to bedding. The elongate sulphide lodes are defined by a long down dip axis (+300m) and a shorter strike (100m to 150m) and thickness (30m). To date eleven sulphide lodes have been discovered at Murrawombie with the 102, 105 and 108 lodes the largest discovered to date. Sulphide mineralisation is dominated by pyrite and chalcopyrite, which varies from massive pyrite +/- chalcopyrite to erratic stringer pyrite/chalcopyrite veins. Sulphide mineralisation pinch and swells which is in part a result of bounding graphitic fault zones deforming the mineralised lenses. Post mineralisation faulting, in particular graphitic faults trend at an oblique angle (approximately 10°) to mineralisation. The graphitic faults constrain the northern strike extensions of the Murrawombie mineralised system.

The Murrawombie resource occurs as several discrete/stacked tabular lenses covering an area approximately 750m north–south and 900m east–west with mineralisation starting from near surface. Fresh mineralisation begins at approximately 140m below surface.

The Murrawombie mineralised system is tabular in nature with an overall down dip length of 750m with mineralisation still open at depth. Mineralisation begins at approximately 70m below surface (5,200mRL). The mineralised lodes vary in thickness averaging 5-15m and dip between 35° - 55° east. Strike extents vary from 50m to 250m.

Avoca Tank Deposit
The main Avoca Tank Deposit is based on several discrete tabular lenses over an area approximately 130 m north west – south east, 100 m north east – south west and with mineralisation starting from 50m below the surface with fresh mineralisation approximately staring from 75m below surface. The individual tabular lenses have strike lengths ranging from 15 to 60m and a down dip extent ranging from 130 to 360m. The lenses vary in true width from 2 to 30m. Narrow across strike mineralisation also occurs in the footwall of the Main Avoca Tank resource and trend approximately perpendicular to the main Avoca Tank mineralisation with an approximate strike length ranging from 40 to 140m.

The Avoca Tank mineralised system is elongated in nature with a currently defined down-dip extent of 340 m. The top of the currently defined mineralisation is approximately 80m below surface (5125 mRL). Mineralised lodes generally trend NNW-SSE and steeply dip to the east at 80 degrees, They have a mean true thickness of 5.2 m, ranging from 0.1 m to 21 m.

Constellation Deposit
The Constellation mineralised system is tabular in nature with an overall down dip length of 1,100m with mineralisation still open at depth. Mineralisation begins from 4m below surface (~160mRL). The mineralised lodes vary in thickness averaging from 1-25m. The main sulphide body dips between 30° - 35° SE with a strike extent typically between 200m to 300m. The sub-vertical sulphide body along the northern margin of the deposit trends east-west with a thickness typically =10m.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityProductUnits202420232022202120202019201820172016
Copper Metal in concentrate M lbs  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe59 59 51 66 
Gold Metal in concentrate koz  ....  Subscribe  ....  Subscribe  ....  Subscribe
Silver Metal in concentrate koz  ....  Subscribe  ....  Subscribe  ....  Subscribe
Copper Concentrate kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe119118100125
Copper Cement M lbs  ....  Subscribe  ....  Subscribe  ....  Subscribe0.130.20.30.7
^ Guidance / Forecast.

Operational metrics

Metrics202420232022202120202019201820172016
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.8 Mt1.8 Mt1.8 Mt
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1,673,066 t1,615,855 t1,457,406 t1,693,951 t
Tonnes milled  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1,669,274 t1,592,165 t1,467,244 t1,700,860 t

Production Costs

CommodityUnits20242023202220212020201920182017
Credits (by-product) Copper AUD  ....  Subscribe -0.25 / lb   -0.24 / lb   -0.15 / lb  
All-in sustaining costs (AISC) Copper AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 3.43 / lb **   3.31 / lb **   3.51 / lb **  
All-in costs Copper AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
C1 cash costs Copper AUD  ....  Subscribe 2.78 / lb **   2.6 / lb **   2.6 / lb **  
** Net of By-Product.

Financials

Units20242023202220212020201920182017
Capital expenditures (planned) M AUD
Growth Capital M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 4.9   3.6   1.8  
Sustaining costs M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 27.5   30.6   37  
Capital expenditures M AUD  ....  Subscribe  ....  Subscribe 32.4   34.2   38.8  
Revenue M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 231.6   235.9   168  
Gross profit M AUD  ....  Subscribe 13.8   37.8   -4.2  
Pre-tax Income M AUD  ....  Subscribe -8.3   61.5   -27  
After-tax Income M AUD  ....  Subscribe -12.7   55.3   -33.3  
EBITDA M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 38.9   55.8   15.9  

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 28, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 28, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 28, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 28, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 28, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 28, 2024

EmployeesYear
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017

Aerial view:

Lock

- subscription is required.