Mining Intelligence and News
Australia

Wodgina Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Lithium
  • Spodumene
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotOn 23 February 2023, MinRes announced that it had entered into a binding agreement with Albemarle Corporation (Albemarle) for a change in ownership structure of their interests in the Wodgina lithium mine and Kemerton hydroxide plant. The agreement included an ownership change for Wodgina to 50/50 (previously 60/40) and the Kemerton hydroxide plant to 85/15 (from 60/40). Further on 20 July 2023, MinRes announced it had amended the terms of the transaction with Albemarle. The amended agreement included an ownership change of the remaining interest in the Kemerton hydroxide plant, resulting in Albemarle taking full ownership of Kemerton. As the sale is expected to be completed within 12 months, the net amount of the assets being sold (disposal group) has been classified as an asset held for sale.

Owners

SourceSource
CompanyInterestOwnership
Mineral Resources Ltd. (operator) 50 % Indirect
Albemarle Corp. 50 % Indirect
Oct. 18, 2023 Albemarle Corporation announced it has closed on the restructuring of its MARBL joint venture with Mineral Resources Limited.

Albemarle has 100% ownership of the Kemerton lithium hydroxide processing facility in Australia and retains full ownership of its Qinzhou and Meishan lithium processing facilities in China.

Joint ownership of the Wodgina mine, with Albemarle and Mineral Resources each owning a 50% share and Mineral Resources serving as the operator.

Deposit type

  • Pegmatite

Summary:

The 3600-2800Ma North Pilbara basement terrane consists of a series of ovoid multiphase granitoidgneiss domes bordered by sinuous synformal to monoclinal greenstone belts.

The Wodgina Greenstone Belt is a north to northeast plunging synclinal structure 25km long and 5km wide, preserved as a roof pendant separating the Yule and Carlindi granitoid complexes. It is composed principally of interlayered mafic and ultramafic schists and amphibolite, with subordinate komatiite, clastic sediments, BIF and chert. The komatiitic and metasedimentary units within the Wodgina area are tentatively correlated to the Kunagunarrina and Leilira Formations respectively.

Archean volcanic activity and sedimentation was followed by the intrusion of Archean granitic batholiths with consequent deformation and metamorphism of the sequence. Late stage granitic intrusions resulted in the emplacement of simple and complex pegmatite sills and barren quartz veins.

The Wodgina pegmatite district contains a number of prospective pegmatite groups, including the Wodgina Deposit.

The Wodgina lithium mineralisation is hosted within a number of sub-parallel, sub-horizontal, northeast trending pegmatite intrusive bodies which base of the massive pegmatite apparently with a dip at between 5° to 30° to the west-southwest.

At this time individual pegmatites vary in strike length from approximately 200m to 400m. The thinner near surface pegmatites vary from 10m to 30m in thickness, but vary locally from less than 2m to up to 35m thick. The massive basal pegmatite varies from 120m to 200m thick. The pegmatites intrude the mafic volcanic and metasedimentary host rocks of the surrounding greenstone belt.

The lithium in the Cassiterite Pit and shallower pegmatites occurs as 10 - 30 cm long grey-white spodumene crystals within medium grained pegmatites comprising primarily of quartz, feldspar, spodumene and muscovite. Typically the spodumene crystals are oriented orthogonal to the pegmatite contacts. Some zoning of the pegmatites parallel to the contacts is observed, with higher concentrations of spodumene occurring close to the upper contact. In the massive basal pegmatite, the spodumene is distributed within fine-grained quartz, feldspar, spodumene and muscovite matrix.

A total of 40 separate pegmatite lenses have been interpreted. Individually they extend over strike lengths of between 100m and 1000m; with a project strike extending over 1.4km. Cross strike extents range from 50 to 300m for individual lenses, with vertical thicknesses of the lenses ranging from 5 to 50m.

The pegmatite lenses have been interpreted to a maximum depth of 300m below the surface.

The Li2O area of the resource consists of two main areas of the Cassiterite deposit, respectively 200m x 300m and 100m x 200m.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

Wodgina was in care and maintenance from FY20 to February FY22.
CommodityProductUnits20242023202220182017
Lithium Hydroxide kt  ....  Subscribe  ....  Subscribe
Spodumene Concentrate kt  ....  Subscribe  ....  Subscribe
^ Guidance / Forecast.

Operational metrics

Metrics20232022202020182017
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe
Annual production capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe
Annual mining capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe4 M wmt4 M wmt

Production Costs

CommodityUnits20232022
Cash costs Spodumene AUD  ....  Subscribe  ....  Subscribe
Total cash costs Spodumene AUD  ....  Subscribe  ....  Subscribe

Financials

Units20232022
Revenue M AUD  ....  Subscribe  ....  Subscribe
EBITDA M AUD  ....  Subscribe  ....  Subscribe

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 31, 2023
....................... Subscription required ....................... Subscription required Subscription required Oct 31, 2023
....................... Subscription required ....................... Subscription required Subscription required Oct 31, 2023
....................... Subscription required ....................... Subscription required Subscription required Oct 31, 2023
....................... Subscription required ....................... Subscription required Subscription required Oct 31, 2023

EmployeesYear
...... Subscription required 2022

Aerial view:

Lock

- subscription is required.