Mining Intelligence and News
Australia

Tallering Peak Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusClosing / Closed
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
SnapshotMining at The Tallering Peak was completed in June 2014 and the final shipment of remnant low grade ore occurred in March 2017.

Mount Gibson has retained its mining and exploration interests in the historic Tallering Peak mining area, to the north of which it continues to explore prospective ground for base metals mineralisation, together with its Fields Find interest.

The Mount Gibson also continues to assess regional exploration opportunities for base metals deposits. In WA's Mid-West region, the Company completed follow up work at the Baillys prospect near the former Tallering Peak iron ore mine, including a ground moving loop electromagnetic survey, as well as continuing a data review and planning additional mapping at the Butcher's Track project north of Tallering Peak. Negotiations also continued regarding potential farm-in and joint venture arrangements to prospective base metals exploration projects in the WA Goldfields region.

Owners

SourceSource
CompanyInterestOwnership
Mount Gibson Iron Ltd. 100 % Indirect
The Mount Gibson Iron has retained its mining and exploration interests in the historic Tallering Peak mining area,

Deposit type

  • Banded iron formation

Summary:

Tallering Peak Iron Ore Mine, situated approximately 63 kilometres north of Mullewa. More specifically, the proposed clearing area includes a rocky, upperslope part of the Tallering Ridge, a Banded Ironstone Formation (BIF) some 8 kilometres long, striking north-east to south-west, and elevated some 150 metres above the natural surrounding ground surface level.

The Tallering Ridge is the largest and southernmost of three distinct BIF ridges that occur within the Tallering Peak mining leases. It consists of two prominent peaks, Tallering Peak and Tallering Hill. The apex of Tallering Hill has been removed by mining operations, whilst Tallering Peak is located north-east of current mining operations, further along the ridge. The Tallering Ridge is currently being mined and consists of the T2, T3, T4, T6A and T6B pits to date.

BIF's are characterised by unique geology, soils and relative isolation. As a consequence, BIF's provide unique habitat for flora and fauna species. The biodiversity value of BIF's relates to the endemic plant species, rare and restricted plant species and distinct communities that exist in these unique landscapes.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

All production numbers are expressed as lump & fines.

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Dec 11, 2024

Aerial view:

Lock

- subscription is required.