Mount Thorley Warkworth Operation

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (semi-soft coking)
  • Coal (thermal)
  • Coal (metallurgical & thermal)
Mining Method
  • Truck & Shovel / Loader
  • Dragline
Production Start1981
Mine Life2037
SnapshotMount Thorley Warkworth (MTW) is an integrated operation of two open cut coal mines, Warkworth Mining Limited (WML) and Mount Thorley Operations (MTO).

The Mount Thorley Warkworth (MTW) underground mine: The potential growth project concept remains subject to study and assessment.
Related AssetsMount Thorley Mine, Warkworth Mine

Owners

SourceSource
CompanyInterestOwnership
Yancoal Australia, Ltd. 83 % Indirect
Yancoal Australia acquired Mount Thorley and Warkworth (MTW) on 1 September 2017 and manages the mine on behalf of the joint venture partners:

-Mount Thorley: Yancoal Australia (80%) and POSCO Australia (20%);

-Warkworth: Yancoal Australia (84.5%), Nippon Steel Australia (9.5% per cent) and Mitsubishi Materials (Australia) (6%).

Contractors

ContractorContractDescriptionRef. DateSource
Coal & Allied (NSW) Pty Ltd Mine Operator Mount Thorley Warkworth (MTW) is managed and operated by Coal & Allied (NSW) Pty Ltd., a wholly owned subsidiary of Yancoal Australia Limited (YAL). Dec 31, 2023

Deposit type

  • Sedimentary

Summary:

Mount Thorley Warkworth (MTW) is located within the Sydney Basin of New South Wales (NSW), a world–class export thermal coal mining district.

The Sydney Basin is a north-south trending basin, containing generally flat lying Permian Triassic sequences, approximately 250 km long, averages 100 km in width, ranges from 2km to 4km in depth and covers an area of approximately 37,000 km2 onshore and 15,000 km2 offshore.

Sedimentation in the Sydney Basin can be divided into many distinct depositional episodes, related to marine transgression and regression an terrestrial sedimentation. In the Sydney Basin the total thickness of the sedimentary package ranges on average from 2 to 3 km over much of the basin, based primarily on drill-hole records and deep seismic profiles.

Coal bearing formations in Permian aged sediments are extensive in the Sydney Basin and range in depth from near the surface to over 1 km. The Sydney Basin is divided into five major coalfields; Southern, Central, Newcastle, Hunter and Western, and comprised of black anthracite coal bed of a few centimetres to several meters, interbedded with sandstones, shales, tuffs and claystone. During coal bore drilling in the late 19th Century a number of bores encountered flows of natural gas.

The Late Permian coal measures show sources of both oil and gas, with the offshore basin possibility more prone to oil Fine grained sediments deposited during the brief marine incursions that took place during the Late Permian may also have some potential as oil sources.

Reserves at December 31, 2023



Mineral Resources are reported inclusive of Mineral Reserves.
CategoryOre TypeTonnage CommodityMarketable Coal
Proven In-Situ (OP) 157 Mt Coal (metallurgical & thermal) 109 Mt
Probable In-Situ (OP) 89 Mt Coal (metallurgical & thermal) 60 Mt
Proven & Probable In-Situ (OP) 246 Mt Coal (metallurgical & thermal) 169 Mt
Measured Total 710 Mt Coal (metallurgical & thermal)
Indicated Total 380 Mt Coal (metallurgical & thermal)
Inferred Total 240 Mt Coal (metallurgical & thermal)
Total Resource Total 1,330 Mt Coal (metallurgical & thermal)

Mining Methods

  • Truck & Shovel / Loader
  • Dragline

Summary:

The proposed mining method within MTW is the same as that currently employed. Large electric face shovels, hydraulic excavators and front-end loaders are utilised to load haul trucks to remove pre-strip and parting material. Draglines are used to expose lowest coal seams. Ancillary equipment in the form of drills, graders, rubber-tyred dozers and water carts will provide the mining equipment with support as required. Coal is extracted by front-end loaders and/or excavators loading haul trucks.

The current mining equipment will continue to be used. In general, changes may occur due to replacement or as technology changes.

Overburden and Interburden Material
Overburden removal at MTW is centred on shovel pre-stripping methods and dragline “stripping”. Multiple bench pre-stripping is used to expose shallower coal seams with a combination of dragline and shovel operations to remove lower interburden. Overburden removal operations generally proceed as follows:

- Tree clearing and timber harvesting is carried out under contract. Topsoil removal is carried out under contract using small earthmoving equipment such as a D6 bulldozer with a loader and trucks.

- Overburden is drilled. Generally holes stop short of the coal seams to reduce blast damage to vthe coal. Hole diameters range from 200mm to 270mm. Drill patterns depend on hole depth and hole diameter but pattern sizes will generally range from 5m x 6m to 10m x 12m.

- The overburden material is blasted according to design parameters specific to the geology, the presence of water, and the type of machine intended to dig the material. Overburden and interburden greater than 2.0m in thickness require fragmentation by drill and blasting.

- Overburden/interburden removal is performed by one of three basic methods:

- Shovel / Truck Fleet: The majority of the uppermost seams in the sequence are exposed using an electric shovel loading 240 and 320 tonne trucks. Overburden waste is hauled to dumps located across the site.
- Dragline: Single or double pass removal of loose overburden into previous strip, leaving a thin layer of material overlying the coal seam.
- Dozers: Dozers will be used to remove thin layers of interburden by directly pushing blasted overburden material into the previous void.

Coal
If the coal seam was uncovered by dragline, the thin layer of rock will be cleaned by tracked and wheeled dozers and graders. The coal seams may be blasted, ripped by dozers or free-dug by loaders depending on the nature and thickness of the coal. FrontGend loaders will operate with 180 tonne capacity trucks which haul the raw coal to either the North or South CPPs.

Mine Design
There are currently three operational pits at MTW:
- Loders pit,
- West pit and
- North pit.

In 2023, within Warkworth, mining activities continued to advance in a westerly direction in both North and West Pits; and the North Out of Pit (NOOP) Dam excavation by heavy mining equipment commenced in February 2022 and continued during the reporting period. North, West and South Pit voids were used for dumping overburden & coarse rejects from the North & South CHPP. Mount Thorley operations continues to be utilised for fine tailings and overburden emplacement. Exploration drilling was conducted within the relevant mining leases ahead of mining and within the pit to gain further information on the resource. All mining related activity is in line with the current development consent.

Existing in-pit crib hut infrastructure was upgraded at West Pit South and North Pit North with Occupation Certificates obtained on 21 July 2023. The upgraded infrastructure includes in-pit muster areas, supervisor work stations, dispatch, and upgraded amenities and effluent treatment systems (with Singleton Council approval).

The following new heavy mining equipment was commissioned in 2023:
o Eight dozers
o Three haul trucks
o Two graders
o One excavator
o One Drill

The following heavy mining equipment was decommissioned in 2023:
o Ten dozers
o Two haul trucks
o Two graders
o One Excavator
o One Wheel Loader
o One Shovel
o One Drill

Comminution

Crushers and Mills

TypeModelSizePowerQuantity
Roll crusher 1
Rotary breaker 2
Sizer 3

Processing

  • Centrifugal concentrator
  • Wet Screening
  • Wash plant
  • Spiral concentrator / separator
  • Gravity separation
  • CHPP
  • Desliming
  • Crush & Screen plant
  • Flotation
  • Dense media separation
  • Dewatering

Summary:

Mineral Processing
Coal will be washed in both the North CPP and South CPP in accordance with market requirements.

North CCP
The North CPP has a nominal capacity of 6.6 million washed saleable tonnes per annum, additional capacity is available through the North CHPP’s bypass facility. This system has not been tested to its maximum capabilities, however historically around 6% of the Run-of-Mine (ROM) coal has been bypassed annually or as high as 1Mt per annum.

The North CPP is a two module plant, each capable of a raw feed rate of 800tph. Raw coal is screened into two sizes, with coarse coal of diameter > 1.4mm treated in a single or two-stage dense medium cyclone circuit and the fine fraction washed in a two-stage spiral process.

The coarse coal circuit relies on relatively simple gravity separation, with coal particles floating in a magnetite and water mixture known as dense medium. The heavier non-coal material sinks while the coal floats. The speed of separation is enhanced for coarse coal particles by pumping the combined dense medium and ROM coal slurry through 1.15 m diameter dense medium cyclones. Products are dewatered in vibrating basket centrifuges prior to stockpiling.

Fine coal is cleaned in a process circuit that does not use a dense medium. It is mixed with water and pumped through classifying cyclones to remove the very fine particles (de-sliming), which generally contain a very high proportion of non-coal materials including clays. The deslimed fines are then fed to spiral separators, which separate materials by gravity, taking advantage of the differing centrifugal effects produced by coal and non-coal particles as they wind their way down the spiral pathways.

Ultra-fine coal from the classifying cyclone overflow is sent to the Beneficiated Dewatered Tailings (BDT) plant, where the coal fraction is separated by a two stage flotation circuit, deGwatered and sent to clean coal stockpiles. Reject material is sent to the tailing thickener for dewatering and thickening before being pumped to a final disposal location within the tailings storage facility.

Coarse reject is disposed of in the active mine dumps and “mixed” with normal waste dumping of the mining operations.

The coal is washed in accordance with market requirements at the North CPP, which operates 7 days a week, stopping for maintenance one day every month.

South CCP
The South CPP has a nominal capacity of 5.3 million saleable tonnes per annum. ROM coal is delivered by rear dump trucks into two raw coal receival bins. The coal is then broken down to a maximum size of 125mm in two rotary breakers, then stacked by two automatic luffing and slewing rail mounted stackers on a single 70,000 tonne design capacity raw coal stockpile.

The raw coal is reclaimed using a bridge type scraper reclaimer to a 300 tonne surge hopper where the feed is split between two 600 tph CPP modules.

Raw coal is wet screened with the +31.5 mm oversize fraction transferred to a dense medium drum. The drum product is crushed through a double roll crusher before being transferred to the clean coal stockpiles. -31.5 mm fraction is screened at 0.5 w/w mm on de-sliming screens with the -31.5 + 0.5 w/w mm fraction being treated in two stages of dense medium cyclones.

The coarse coal circuit relies on gravity separation, with coal particles floating in a magnetite and water mixture known as dense medium. The heavier non-coal material sinks while the coal floats. The speed of separation is enhanced for coarse coal particles by pumping the combined dense medium and ROM coal slurry through dense medium cyclones. Rejects from the primary DMC stage are rewashed at a higher density in the secondary dense medium cyclone to ensure efficient recovery of combustible material. Products are dewatered in vibrating basket centrifuges prior to stockpiling.

The -0.5 w/w mm undersize materials from the de-sliming screens is pumped through two stages of classifying cyclones to remove the high ash clay slimes prior and to thickening and feeding this material to the flotation circuit for recovery. Reject material is sent to the tailing thickener for dewatering and thickening before being pumped to a final disposal location within the tailings storage facility.

Coarse reject is disposed of in the active mine dumps and “mixed” with normal waste dumping of the mining operations.

The coal is washed in accordance with market requirements at the South CPP, which operates 7 days a week, stopping for maintenance one day every month.

Coal Stockpiles
North
ROM coal is delivered from the mine into two raw coal receival hoppers. The coal is then sized through 3 stage Abon crushers to a top size of 50 mm, which is then stacked via two automatic luffing and slewing rail mounted stackers on twin 47,000 tonne design capacity raw coal stockpiles.

Clean coal products are reclaimed from one of two stockpiles at the CPP which have a total design capacity 158,000 tonnes. Two reclaimers are used to feed, via conveyor, the train loading bin at the Mt Thorley Coal Loader (MTCL) facility. Coal is dispatched through this facility by rail to PWCS at Newcastle.

Bypass coal is crushed and sized to 50mm and conveyed around the CPP directly to the product stockpiles.

The North CPP also uses an emergency stockpile (CC8) as required. The raw and product coal stockpiling facilities and operations have not changed since the previous reporting period.

South
ROM Coal is delivered from the mine into two raw coal receival hoppers. The coal is then broken down to a top-size of 125 mm in two rotary breakers, then stacked via two automatic luffing and slewing rail mounted stackers on a single 70,000 tonne design capacity raw coal stockpile.

Clean coal products are reclaimed from stockpiles using a bucket wheel reclaimer that feeds the train loading bin at the MTCL facility. Coal is dispatched through this facility by rail to PWCS at Newcastle. The raw and product coal stockpiling facilities and operations have not changed since the previous reporting period.

Water Supply

Summary:

A total of 502mm of rainfall was recorded at MTW in 2023 producing a calculated 5,361ML of runoff from developed, disturbed and mining catchments. Water falling on clean water catchments is diverted off site into natural systems where possible. Rainfall runoff was the largest input to the site mine water balance in 2023.

Water was required to be imported to meet site demand during 2023. During the reporting period 545 ML was imported from the LUG bore by MTW, compared to the previous reporting period (41ML extracted in 2022).

MTW also sources water from the Hunter River via the Mount Thorley Joint Venture (MTJV) water supply scheme. Singleton Shire Council holds the high security water licence on behalf of the scheme members. Singleton Shire Council maintains and operates the scheme to supply raw water to MTW, Glencore’s Bulga Coal complex, and to meet Council’s own needs. MTW’s share of the MTJV allocation is 1,009 ML per water reporting year.

Production

CommodityUnits2024202320222021202020192018201720162015
Coal (metallurgical & thermal) Mt 11 ^11 8.1 11 12 12 12 12 12 12 
All production numbers are expressed as clean coal. ^ Guidance / Forecast.

Operational metrics

Metrics2024202320222021202020192018201720162015
Coal tonnes mined 16.7 Mt ^17.2 Mt12.4 Mt16.5 Mt17.5 Mt17.6 Mt17.6 Mt17.7 Mt18.1 Mt17.1 Mt
Waste 94.6 Mbcm ^97 Mbcm76.8 Mbcm87.5 Mbcm98,217 Mbcm96.8 Mbcm98.6 Mbcm101.67 Mbcm96.9 Mbcm103.16 Mbcm
Reject 5,371 kt ^5,755 kt4,387 kt5,299 kt6,179 kt5,432 kt5,376 kt5,939 kt5,379 kt
Raw coal annual capacity 18.5 Mt
^ Guidance / Forecast.

Production Costs

Commodity production costs have not been reported.

Financials

Units2017
Revenue M AUD 944  
EBITDA M AUD 407  

Heavy Mobile Equipment

HME TypeModelSizeQuantityRef. DateSource
Cable reel truck Caterpillar 992C 2 Nov 11, 2020
Dozer (crawler) Caterpillar D11 6 Nov 11, 2020
Dozer (crawler) Caterpillar D11T 21 Nov 11, 2020
Dozer (rubber tire) Caterpillar 854 4 Nov 11, 2020
Dozer (rubber tire) Caterpillar 834 1 Nov 11, 2020
Dragline P&H 9020 1 Nov 11, 2020
Dragline Marion 8200 1 Nov 11, 2020
Dragline Bucyrus-Erie 1370WB 1 Nov 11, 2020
Drill Reedrill SK75i 4 Nov 11, 2020
Drill Reedrill SKSS 2 Nov 11, 2020
Drill Sandvik D75KS 1 Nov 11, 2020
Excavator Hitachi EX550 2 Nov 11, 2020
Excavator Liebherr EX9800 21 Jul 31, 2021
Excavator Hitachi EX3600 4 Nov 11, 2020
Grader Caterpillar 16G 1 Nov 11, 2020
Grader Caterpillar 16H 1 Nov 11, 2020
Grader Caterpillar 16M 2 Nov 11, 2020
Grader Caterpillar 24H 2 Nov 11, 2020
Grader Caterpillar 24M 1 Nov 11, 2020
Loader (FEL) LeTourneau L1850 3 Nov 11, 2020
Loader (FEL) Caterpillar 998 2 Nov 11, 2020
Scraper Caterpillar 657G 2 Nov 11, 2020
Shovel P&H 4100 XPC 3 Nov 11, 2020
Truck (dump) Caterpillar 795F 360 t 12 Nov 11, 2020
Truck (dump) Caterpillar 793 240 t 9 Nov 11, 2020
Truck (dump) Komatsu 830E 240 t 46 Nov 11, 2020
Truck (dump) Caterpillar 789C 190 t 17 Nov 11, 2020
Truck (haul) NHL NTE360A 327 t 28 Feb 3, 2022
Truck (service) 4 Nov 11, 2020
Truck (water) Caterpillar 785 7 Nov 11, 2020

Personnel

Mine Management

Job TitleNamePhoneProfileRef. Date
CHPP Maintenance Superintendent Leah Miller LinkedIn Oct 6, 2024
Environmental & Community Manager Gary Mulhearn 02-6570-1734 LinkedIn Oct 6, 2024
General Manager David Bennett (02)6570-1500 Dec 31, 2023
Health, Safety & Training Manager Adam Rice LinkedIn Oct 6, 2024
Maintenance Manager Warwick Gloster LinkedIn Oct 6, 2024
Mining Superintendent Robert McGrath LinkedIn Oct 6, 2024

Total WorkforceYear
1,418 2023
1,360 2022
1,275 2021
1,275 2020
1,300 2019