Mining Intelligence and News
Australia

Cadoux Project

Click for more information

Categories

Overview

Mine TypeOpen Pit
StagePermitting
Commodities
  • Aluminum
Mining Method
  • Truck & Shovel / Loader
Project Timeline... Lock
Mine Life... Lock
SnapshotCadoux Limited’s integrated HPA production consists of two operating sites: one being the mining and beneficiation of feedstock at Cadoux and second the refining of feedstock for HPA production at Kwinana.

The project has two stages: Stage 1 develops a 1 ktpa Small Scale HPA Plant (SSP), while Stage 2 focuses on a 10 ktpa commercial plant.

During the FY2024, Cadoux’s HPA project development benefitted from detailed design and engineering for SSP. This phase of development work resulted in an excellent gaps analysis between the two HPA production formats and provided a clear platform for a staged / modular production expansion model towards the targeted full production rate.

In August 2024, Cadoux announced the completion of Stage 1, Phase 1 of its planned SSP and the commencement of Phase 2 of the project. Phase 2 is expected to be completed by December 2024.

Owners

SourceSource
CompanyInterestOwnership
Cadoux Ltd. 100 % Indirect
Kokardine Kaolin Pty Ltd. (KKPL) (operator) 100 % Direct
Cadoux Ltd. holds 100% interest in the Cadoux kaolin deposit, a high purity alumina project in Western Australia.

Contractors

Lock

- subscription is required.

Deposit type

  • Metamorphic hosted

Summary:

The Cadoux (HPA) Project area is underlain by weathered granitoid Archaean rock of the Yilgarn Granites is the likely parent material for the kaolin. Here, deep weathering of the feldspathic and ferromagnesian minerals within the metamorphosed granitic has resulted in the formation of kaolinite. There is no outcrop but recognizable granitoid fragmental rocks are sometimes present just below surface. The crust of the overburden comprises gravel and sands over reddish to off-white clay. White kaolin underlies the overburden followed by weathered, partial oxidized and then fresh granitoids at depth.

The recent drilling at the property has revealed a weathering profile which is very common in Western Australia with the granitoid rocks, deeply weathered forming a leached, kaolinized zone under a lateritic crust. Analysis at the Laboratory shows particle size distributions are typical of “primary style” kaolin clays produced from weathered granites. The crust of overburden comprises gravel and sands over reddish to off-white clay to an average depth of 5 m. White kaolin then averages approximately 16 m before orange to yellow sandy and mottled clays are intersected which are followed by recognisable rounded granitoid material. The thickness of the kaolin profile varies from less than 1 m to a maximum of 22 m. Fresh granitoids are found at depths of between 10 m and 30 m. All kaolin resources are within 4 m to 11 m of the surface.

The upper low K2O zone (K2OCD= 1) is generally thicker up to roughly 20 m than the lower zone (‘high’ K2O – K2OCD=2) which is up to approximately 10 m thick.

The mineralisation is close to horizontal, dipping on average about 1° towards 070°. The strike extent is roughly 1 km and across strike width is roughly 500 m for the bulk northern/central part of the deposit, with the total north south dimension being ~1.4 km including the un-mineralised central/south portion (see plan view diagram in body of report). The combined thickness of the mineralisation zones is greatest in the north-eastern part of the deposit (~15 m to 25 m), thinning to the northwest (~4m) and southwest (~4 m to 12 m).

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnitsAvg. Annual
Alumina t 10,000
All production numbers are expressed as powder.

Operational metrics

Metrics
Annual ore mining rate  ....  Subscribe
* According to 2021 study.

Production Costs

CommodityUnitsAverage
C1 cash costs Alumina USD  ....  Subscribe
Assumed price Alumina USD  ....  Subscribe
* According to 2021 study / presentation.

Project Costs

MetricsUnitsLOM Total
Working capital $M USD  ......  Subscribe
Closure costs $M USD  ......  Subscribe
Total CapEx $M USD  ......  Subscribe
Gross revenue (LOM) $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax NPV @ 8% $M USD  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 2, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Aug 8, 2024

Aerial view:

Lock

- subscription is required.