Willow Creek Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (metallurgical)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotThe Willow Creek mine produces hard coking coal (HCC) and pulverized coal injection (PCI) product. The coal is processed on site then transported by rail to the Trigon Terminal.

Conuma Resources Limited completed a preliminary feasibility study in September 2022, but as of early 2025, this study is not public. Conuma Resources Ltd. continued baseline monitoring for Willow Creek Extension project.

Owners

SourceSource
CompanyInterestOwnership
ERP Compliant Fuels, LLC 100 % Indirect
Conuma Resources Ltd. (operator) 100 % Direct
Conuma Coal Resources Ltd. operates surface mine operations at Willow Creek.

Conuma Coal Resources Ltd. (Conuma Coal) is a subsidiary of West Virginia-based mining company ERP Compliant Fuels.

Deposit type

  • Sedimentary

Summary:

All of the deposits of interest for the Willow Creek property refer to the potentially surface mineable coals.

There are seams present in other formations of the sequence in this area but their distribution and commercial significance has not yet been determined for the Willow Creek Property.

The Gething Formation seams of interest are those numbered from 1 through 8 and Seam A. Another seam, referred to as Seam 9, achieves mineable thickness from place to place.

A minimum coal thickness of 1.0m is required to meet the criteria for inclusion to the mineral resource. Partings were considered separable from the seam if they were greater than 1.0m, and non separable if less than 1.0m. If the parting was greater than 3.0m, the seam packages were modeled separately, and considered as a repeat.

Seam naming has been kept the same, with the seams called Seam 1 at the top of the section and Seam 8 at the bottom. Seam A occurs in the north only, between Seams 4 and 5. On some sections a zero was added to the end of the seam name to identify seam splits (e.g. Seam 7 is represented as Seam 70 where intact and Seam 71 and Seam 72 to indicate splits).

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

Production for 2023 and 2024 is a forecast calculated based on quarters 1-3 of 2023 and 2024, respectively.
CommodityUnits2024202320222021202020192018
Coal (metallurgical) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe0.80.5
All production numbers are expressed as clean coal.

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Feb 11, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 11, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 11, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 10, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 11, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 11, 2025

Workforce

EmployeesYear
...... Subscription required 2024
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021

Aerial view:

Lock

- subscription is required.