Mining Intelligence and News
Australia

Garden Well Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit & Underground
StatusActive
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
  • Longhole open stoping
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotGarden Well site is a part of Duketon South Operation.

The Garden Well Operations include Garden Well open pits, Garden Well South underground mine, Tooheys Well, Russell’s Find and Erlistoun open pits, and Garden Well processing plant.

Garden Well South Underground mine commenced commercial production during May 2023.

During 2024, the Regis identified and commenced the development a new underground mining area at Garden Well Main. On 1 July 2024, the project started infrastructure development.

Owners

SourceSource
CompanyInterestOwnership
Regis Resources Ltd. 100 % Indirect
The Garden Well gold deposit is located on M38/1249, M38/1250, M38/283. Current registered holders of the tenements are: M38/1249 Regis Resources Ltd; M38/1250 and M38/283 Regis Resources Ltd and Duketon Resources Pty Ltd (100% subsidiary of Regis Resources Ltd).

Contractors

Lock

- subscription is required.

Deposit type

  • Orogenic
  • Vein / narrow vein
  • Breccia pipe / Stockwork

Summary:

Garden Well is located on the eastern limb of the Erlistoun syncline of the Duketon Greenstone Belt. The gold of the Garden Well Deposit occurs as supergene mineralisation within upper Archaean regolith and as hypogene mineralisation in fresh rock. No significant amounts of gold occur in the transported quaternary clay sequence.

The gold is associated with intensely sheared and folded ultramafic and shale units that have been hydrothermally altered to a silica-carbonate-fuchsite-chlorite-pyrite-arsenopyrite assemblage, and underlying chert units.

The gold mineralisation trends roughly north-south over a distance of 2,100m and dips 50º to 60º east which is sub-parallel to the ultramafic-sediment contact.

The approximate dimensions of the underground deposit are 1,600m along strike (N-S), 100m across strike (E-W), and 800m depth from 2,500mRL to 1,700mRL.

Garden Well South
The geology of Garden Well South (GWS) UG consists of a sequence of folded sedimentary and volcanic rocks. The sequence can be differentiated into fine grained siltstones, lapilli and tuff volcaniclastics, sedimentary breccias, black shales, banded iron formation, chert, interbedded chert/shale and a footwall basalt unit. All of the units strike NNW at approximately 340-350o. Folding is tight and plunges approximately 20o to the SSE.

Primary mineralisation is present as pyrite beds and veinlets within the western limb of the syncline, hosted by siderite-altered chert. Mineralisation at GDW is strongly controlled by lithological rock type.

The maiden GWS UG MRE is estimated from the initial target zone at GWS and extends over 700m down plunge to a depth of 500 meters below natural surface.

Gold is hosted in a moderate east to steeply dipping shear zone trending N-S. Gold mineralisation within chert, shale and BIF is associated with brecciated zones including elevated sulphides and quartz veins.

Garden Well Main
The geology of Garden Well Main underground consists of a sequence of folded sedimentary and volcanic rocks. The sequence can be differentiated into fine grained siltstones, lapilli and tuff volcaniclastics, sedimentary breccias, black shales, banded iron formation, chert, interbedded chert/shale and a footwall basalt unit. All the units strike NNW at approximately 340-350o . Folding is tight and plunges approximately 20o to the SSE. Primary mineralisation is present as pyrite beds and veinlets within the western limb of the syncline, hosted by sideritealtered chert.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnits202020192018201720162015
Gold koz  ....  Subscribe96112131158151
All production numbers are expressed as metal in ore.

Operational metrics

Metrics202020192018201720162015
Ore tonnes mined  ....  Subscribe3.2 Mt3.8 Mt4.3 Mt5.6 Mt5.2 Mt

Production Costs

Commodity production costs have not been reported.

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 4, 2024
....................... Subscription required ....................... Subscription required Subscription required Nov 4, 2024

EmployeesYear
...... Subscription required 2024
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020

Aerial view:

Lock

- subscription is required.