Mining Intelligence and News
South Africa

Kimberley(Ekapa) Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit & Underground
StatusActive
Commodities
  • Diamond
Mining Method
  • Block caving
  • Sub-level caving
Production Start... Lock
Mine Life... Lock
SnapshotKimberley Underground comprises three kimberlite pipe mines in close proximity: Bultfontein (10 ha at surface), Dutoitspan (11 ha) and Wesselton.

Ekapa is both a tailings mineral resource reclamation operation and an underground mining operation with two operational shafts.

Kimberley has been experiencing a tremendous water crisis which greatly impacts the water supply to all residents of Kimberley and surrounding areas.

Owners

SourceSource
CompanyInterestOwnership
Ekapa (operator) 100 % Direct
Ekapa Mining is the 100% owner of Ekapa Resources and Ekapa Minerals. Ekapa Resources is the owner of the underground mining rights and Ekapa Minerals is the owner of the surface mining rights. It is operated as one entity known as Ekapa and comprises five business units, namely Joint Shaft, Wesselton, Combined Treatment Plant (CTP), Surface Mining and Services and Support.

Deposit type

  • Kimberlite

Summary:

The discovery of the Kimberley Mines has been described above. The final one of five major mines to be discovered was the Wesselton Mine (previously called the Premier Mine, and not be confused with the Premier Mine (now Cullinan Mine) at Cullinan near Pretoria. Wesselton was discovered in 1891.

The original surface outcrop was approximately 4 ha in area, and from historic descriptions it formed a low hill of whitish coloured rock, today interpreted to be the calcretized cap of surface kimberlite.

Rapid mining led to the kimberlite being mined out and the mine closed by 1914. This means that no modern geological investigations were ever carried-out on probably the “archetypical” kimberlite. Maps of the mine show that it had a pipe-like shape, and that it probably consisted of diatreme-facies kimberlite.

The “west-end” portion of the mine yielded abundant brown stones of generally inferior quality as well as smoky, cracked sharp-edged octahedral diamonds. The northern portion of the pipe produced mostly boart, the north western sector peculiar brown stones, and the central and southern portions yielded high proportions of cleavage fragments.

Kimberley Mine. The distinctive features being the low abundance of boart, the rarity of white stones with white cleavage, the rarity of large macles, the presence of dodecahedral fancy stones with a deep yellow colour and a greater abundance of large yellow diamonds. He also noted that the low-grade western portion of the mine yielded a considerable proportion of brown stones of inferior quality.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits201820172016
Diamond carats 913,569938,934531,469

Operational metrics

Metrics201820172016
Tonnes processed 7,972,320 t8,107,584 t4,721,683 t

Production Costs

Commodity production costs have not been reported.

Operating Costs

Currency201820172016
Total operating costs ($/t milled) ZAR  ....  Subscribe  ....  Subscribe  ....  Subscribe

Mine Financials

Units20182017
Capital expenditures M USD 18.2   37.4  
Revenue M USD 107.5   108.4  

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 8, 2024
....................... Subscription required ....................... Subscription required Subscription required Nov 8, 2024
....................... Subscription required ....................... Subscription required Subscription required Nov 8, 2024
....................... Subscription required ....................... Subscription required Subscription required Nov 8, 2024
....................... Subscription required ....................... Subscription required Subscription required Nov 8, 2024

Workforce

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2018
...... Subscription required ...... Subscription required ...... Subscription required 2017
...... Subscription required ...... Subscription required ...... Subscription required 2016

Aerial view:

Lock

- subscription is required.