Mining Intelligence and News
Tanzania

North Mara Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit & Underground
StatusActive
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
  • Longhole open stoping
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotNorth Mara Gold Mine is a combination of Gokona Pit and Underground, Gena Pit and Rama Pit.

Restart mining at Gena Pit was in H2 2023.

As of the end of 2024, commenced development of new surface decline at Gokona deposit (Gokona Boxcut Project) as well as paste plant and filtration plant commissioning in final stages of completion.

Gokona Boxcut Project - next steps:
• New portal on east mine to enable mining of the Gokona cutback in 2025.
• Decline development completion: Q1 2025.
• Gokona cutback to commence: Q2 2025.

Life of Mine Plan: Stable +300koz production for 10 years, with mining currently planned to end by 2033 and stockpile feeding until end of current mine life in 2038.

Owners

SourceSource
CompanyInterestOwnership
Government of Tanzania 16 % Indirect
Barrick Gold Corp. 84 % Indirect
Twiga Minerals Corporation Ltd. (operator) 100 % Direct
Barrick Gold Corp. owns 84% of North Mara mine, with the Government of Tanzania owning 16%.

Twiga Minerals, the joint venture between the Tanzanian government and Barrick Gold Corporation, operates North Mara mine.

Contractors

Lock

- subscription is required.

Deposit type

  • Vein / narrow vein

Summary:

The North Mara Mine is situated within the Mara Greenstone Belt. The underlying geology comprises felsic and mafic volcanics intercalated with sediments which are intruded by various granitoid and gabbroic plutonic rocks. Tertiary volcanic lava flows partially cover the underlying Archaean geology and the ore bodies are structurally controlled, shear-hosted lode gold deposits. There are several types of gold mineralisation including shear-zone-related quartz vein and disseminated gold.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits20252024202320222021202020192018201720162015
Gold koz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe334 336 324 378 287 
All production numbers are expressed as metal in doré. ^ Guidance / Forecast.

Operational metrics

Metrics2024202320222021202020192018201720162015
Stripping ratio OP  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.39 4.47
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe6,333 kt3,657 kt3,801 kt3,192 kt3,659 kt
Waste OP  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe7,930 kt9,783 kt
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe14,263 kt16,935 kt15,953 kt15,996 kt15,408 kt
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2,459 kt2,847 kt2,841 kt2,830 kt2,833 kt
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Daily processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe8,000 t8,000 t
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2.8 Mt2.8 Mt

Production Costs

CommodityUnits202520242023202220212020201920182017
Cash costs (sold) Gold USD
Total cash costs (sold) Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 654 / oz   609 / oz   513 / oz  
Total cash costs (sold) Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 646 / oz **   603 / oz **   509 / oz **  
All-in sustaining costs (sold) Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 810 / oz   836 / oz   777 / oz  
All-in sustaining costs (sold) Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 802 / oz **   830 / oz **   773 / oz **  
All-in costs Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 832 / oz   861 / oz   808 / oz  
All-in costs Gold USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 824 / oz **   804 / oz **  
^ Guidance / Forecast.
** Net of By-Product.

Operating Costs

Currency20242023202220212020
OP mining costs ($/t mined) USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
UG mining costs ($/t mined) USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Processing costs ($/t milled) USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
G&A ($/t milled) USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Mine Financials

Units20242023202220212020201920182017
Growth Capital M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Sustaining costs M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 48   25.8   22.6  
Capital expenditures M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 57   81.6   90.9  
Revenue M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 462   423.2   408.2  
Operating Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 146  
EBIT M USD 139.4   170.6  
EBITDA M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 243   201.1   225.5  

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Apr 13, 2025
....................... Subscription required ....................... Subscription required ........... Subscription required Subscription required Apr 13, 2025
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Mar 10, 2025
....................... Subscription required ....................... Subscription required Subscription required Mar 10, 2025
....................... Subscription required ....................... Subscription required Subscription required Apr 13, 2025
....................... Subscription required ....................... Subscription required Subscription required Apr 13, 2025
....................... Subscription required ....................... Subscription required Subscription required Apr 13, 2025
....................... Subscription required ....................... Subscription required Subscription required Apr 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Apr 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Apr 27, 2024

Workforce

Aerial view:

Lock

- subscription is required.