Mining Intelligence and News
Australia

Lady Loretta Mine

Click for more information

Categories

Overview

Mine TypeUnderground
StatusActive
Commodities
  • Zinc
  • Lead
  • Silver
Mining Method
  • Sub-level open stoping (SLOS)
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotThe Lady Loretta mine forms an integral part of the Mount Isa Zinc Operation and is characterized by a well-defined and finite orebody. It has been publicly announced in recent years that the mine is slated for closure in the second half of 2025.

Owners

SourceSource
CompanyInterestOwnership
Glencore plc. 100 % Indirect

Contractors

Lock

- subscription is required.

Deposit type

  • SEDEX

Summary:

Lead-zinc-silver mineralisation occurs in a galena and sphalerite rich massive sulphide lens located in carbonaceous pyritic shales and siltstones. The deposit consists of a tight syncline dislocated by a number of major faults. The deeper and high grade portion of the deposit reaches 500m below the surface.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits2023202220212020
Zinc t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Lead t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Silver oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Operational metrics

Metrics202320222021202020192018
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.5 Mt8 Mt

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required May 15, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required May 15, 2024
....................... Subscription required ....................... Subscription required Subscription required May 15, 2024
....................... Subscription required ....................... Subscription required Subscription required May 15, 2024

EmployeesContractorsYear
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019

Aerial view:

Lock

- subscription is required.