Mining Intelligence and News
United States

Pogo Mine

Click for more information

Categories

Summary

Mine TypeUnderground
StatusActive
Commodities
  • Gold
  • Silver
Mining Method
  • Longhole open stoping
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotThe Pogo Operation includes the Pogo underground mine and milling facilities, where all underground ore is treated. The plant is capable of processing both partially refractory and free-milling ores. The plant has the capability to treat both partially refractory and free milling ores.

In FY2025, mill improvement works were completed.

FY26 capital investment at Pogo is forecast to support underground development and infrastructure to increase mining volumes, expand access to new areas, and advance mill optimisation works focused on throughput and recovery. FY26 planned mill shutdowns are forecast in July, November and March.

Owners

SourceSource
CompanyInterestOwnership
Northern Star Resources Ltd. 100 % Indirect
The Pogo operation is 100% owned by Northern Star Resources Ltd. through Northern Star (Pogo) LLC.

Contractors

Lock

- subscription is required.

Deposit type

  • Breccia pipe / Stockwork
  • Vein / narrow vein
  • Intrusion related

Summary:

The Project is in the Tintina Mineral Belt, which is a 200 km-wide, 1,200 km-long arc, broadly bounded by the Tintina-Kaltag fault systems to the north and the Denali-Fairwell fault systems to the south. The region contains numerous economic deposits of gold in addition to copper, lead, zinc, silver and tungsten deposits.

The lithological units in the Pogo deposit area are dominantly high-grade metamorphic rocks intruded by later felsic to intermediate intrusive units. Key metamorphic rocks include biotite feldspar gneiss, augen gneiss and mafic schist derived from both sedimentary and igneous protoliths. Metamorphic mineral assemblages observed consist of quartz, feldspar, biotite, chlorite, muscovite, sillimanite, andalusite and garnet. The 50km long Goodpaster batholith (granite-tonalite-diorite) is the dominant intrusive complex in the district. Locally small felsic to intermediate stocks and dykes are present. The principal mineralisation is hosted in biotite-quartz-feldspar paragneiss and orthogneiss, although all other lithologies are cut. Where the veins cross intrusives, they tend to split and become stockwork zones.

Gold at Pogo is predominantly hosted within laminated quartz veins ranging in thickness from <0.5 m to >10 m. Mineralised veins contain around 3% sulphides (arsenopyrite, pyrite, pyrrhotite, loellingite, chalcopyrite, bismuthinite, sphalerite, galena, molybdenite, tetradymite, maldonite) and a variety of Bi-Pb-Ag sulphosalts.

The Pogo gold deposit is an example of a Reduced Intrusive Related Gold Deposit (RIRGD), characterised by a low sulphide content, (typically <5%) and a reduced ore mineral assemblage, that typically comprises pyrite and lacks primary magnetite or hematite. In brief, these deposits typically have the following characteristics:
- Mineralisation occurs as sheeted vein deposits or stockwork assemblages and often combines gold with variably elevated Bi, W, As, Po, Py, Mo, Te, and/or Sb, but low concentrations of base metals.
- Restricted and commonly weak proximal hydrothermal alteration
- Spatially and temporally related to reduced intrusions of intermediate to felsic composition.

Dimensions
Liese – The generally shallowly north-westerly dipping Mineral Resource extends approximately 1,300m in a north-easterly direction along strike and 1,300m down dip.

Eastern Deeps – The shallow to moderately north-westerly dipping Mineral Resource extends approximately 530m in a north-easterly direction along strike, and 600m down dip.

North Zone – The steeply east dipping Mineral Resource extends approximately 950m in a northerly direction along strike, and 970m down dip. A flatter component, dipping west, extends 250m by 190m.

South Pogo – The moderately north-westerly dipping Mineral Resource extends approximately 1100m in a north-easterly direction along strike, and 760m down dip.

Fun Zone – the generally moderate to steep-westerly dipping Mineral Resource extends approximately 880m in a westerly direction across strike, 650m in a northerly direction across- strike and 915m down dip.

Central Zone - The shallow to moderately north-westerly dipping Mineral Resource extends approximately 750m in a north-easterly direction along strike, and 500m down dip.

Hill 4021 – the Hill 4021 prospect consists of two zones of stacked, shallowly dipping mineralised structures with combined extents approximately 1,900 m in a north-westerly direction along strike and 500 m down dip.

Goodpaster is situated ~1,500 m northwest of the nearest Pogo underground development. The deposit is laterally extensive occupying an approximate footprint of 1,830 m by 760 m with a width up to 550 m. Lode orientations are variable but broadly dip ~30° to 280° however conjugate orientations are common.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits202420232022202120202019201720162015
Gold koz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe184 271 269 281 
All production numbers are expressed as metal in doré. ^ Guidance / Forecast.

Operational metrics

Metrics2025202420232022202120202019201720162015
Annual ore mining rate  ....  Subscribe
Annual processing rate  ....  Subscribe
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe783,505 t
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Tonnes milled  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe796,318 t884 kt941,856 tons926,603 tons
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe0.8 Mt
Daily ore mining rate  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe3,300 tons
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1,515,117 tons1,516,576 tons

Production Costs

Commodity2025202420232022202120202019
Credits (by-product) Gold  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Cash costs (sold) Gold  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
All-in sustaining costs (sold) Gold  ....  Subscribe 1,705 / oz  AUD
All-in sustaining costs (sold) Gold  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
All-in costs Gold  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
^ Guidance / Forecast.
** Net of By-Product.

Mine Financials

Units20252024202320222021202020192017
Capital expenditures (planned) M USD
Growth Capital M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Capital expenditures M 32  USD
Revenue M  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 253.1  AUD
Pre-tax Income M  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -31.9  AUD 102  USD
After-tax Income M  ....  Subscribe -20  AUD
EBITDA M  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 18  AUD
Operating Cash Flow M  ....  Subscribe  ....  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 1, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 1, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 1, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 1, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 1, 2025
....................... Subscription required ....................... Subscription required Subscription required Sep 1, 2025

Workforce

EmployeesTotal WorkforceYear
...... Subscription required 2025
...... Subscription required 2024
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017
...... Subscription required 2016
...... Subscription required 2015
...... Subscription required 2014

Aerial view:

Lock

- subscription is required.