Mining Intelligence and News
Botswana

BK11 Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusCare and Maintenance
Commodities
  • Diamond
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotThe BK11 mine has been on care and maintenance since February 2012.

The initial phase of production at the BK11 Mine began in August 2010 but was halted in February 2012 due to the plant’s inability to effectively extract diamonds. The second phase, involving secondary and tertiary crushing circuits, as well as connection to the current electrical power infrastructure, is yet to commence.

Owners

SourceSource
CompanyInterestOwnership
Visionary Victor Resources 100 % Indirect
The BK11 mine is 100%-owned by Visionary Victor Resources.

Deposit type

  • Kimberlite

Summary:

The surface area of BK11 is presently modelled as 9.6Ha and overburden, consisting of Kalahari sands and calcretes, is relatively shallow at, on average less than, 4m. The overburden is underlain by intensely calcretised and silcretised low grade kimberlitic material up to a depth of approximately 20m.

A comprehensive exploratory drilling programme was undertaken to fully delineate the position, extent and morphology of the BK11 kimberlite pipe below the surface to a depth of approximately 150m, as well as to establish the mineral resource potential.

The BK11 kimberlite has been shown to be a classic “champagne glass” shaped pipe with a large crater bowl filled with layered volcaniclastic deposits (K2-K3) and talus slope deposits, commonly known as country rock breccia, closer to the crater walls. A rather less-well delineated “neck” of more massive volcaniclastic kimberlite (K4) and basalt breccia underlies the crater. The kimberlite is covered with a thin veneer of up to, on average, 4m of Kalahari sands and then gradational calcrete/silcrete units which are believed to be dominantly weathered K1 material. Several shaley kimberlite units are present in the upper pipe, dipping gently outwards from the K1 “knoll” in the centre of the pipe.

The western and central side of the kimberlite pipe at BK11 is characterised by a cleaner and subsequently higher grade kimberlite, containing a higher proportion of clear white crystals with very little boart. However the eastern side of the kimberlite pipe at BK11 is characterised by dirty, heavily diluted and therefore lower grade kimberlite.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 7, 2024

Aerial view:

Lock

- subscription is required.