Overview
Stage | Production |
Mine Type | Open Pit & Underground |
Commodities |
|
Mining Method |
- Truck & Shovel / Loader
- Bord-and-pillar
- Continuous
|
Mine Life | 2033 |
The Millennium and Mavis Downs project project is adjacent to Poitrel and shares access to Red Mountain coal handling and preparation plant, and coal loading and transport infrastructure.
Millennium is operating as a conventional open -cut truck and shovel operation. Auger mining ended in April 2023. Underground mining development drivage has commenced, with development coal expected from late 3Q 23. |
Source:
p. 89,112
April 15, 2021 - MetRes Pty Ltd, a 50/50 joint venture (JV) between Stanmore Coal and M Resources, has acquired the Millennium and Mavis Downs coal mine in Queensland from Peabody Energy.
M Mining Pty Ltd, a wholly owned subsidiary of M Resources, is the joint venture manager and operator.
GEAR’s effective interest in Stanmore is 64.01%.
Contractors
- Subscription is required.
Summary:
The Millennium project area lies within the Permo-Triassic Bowen Basin. The Bowen Basin consists of 10 kilometre (km) thick sequences of volcanic, shallow marine and terrestrial sediments and is categorised back-arc to foreland basin.
Coal seams occur within the Rangal Coal Measures which are Late Permian in age. These seams dip to the west at approximately 4 - 7 degrees within the Millennium Lease and 4 – 10 degrees to the east at Mavis Downs.
The coal seams of interest found within the Project area are as follows – Leichhardt and Vermont Upper 1. Additional seams were intersected in the historic drilling and in part analysed these were the M seam and plies of the Vermont Lower Seams.
The target seams have a cumulative thickness of approximately 7 m across the deposit.
Mining Methods
- Truck & Shovel / Loader
- Bord-and-pillar
- Continuous
Summary:
Auger and open-cut mining continued throughout 2022. Auger mining ending in April 2023 at the Millennium and Mavis Downs mine. Underground mining development drivage has commenced, with development coal expected from late 3Q 23.
Open cut
• Open cut mining method is planned to be conventional strip mining where the floor dip is suitable, and terrace mining where the floor dip is steeper. Waste will be drilled and blasted before being removed by bench using one large 600 t and one 350 t hydraulic excavators and rear dump trucks. The mined waste will be backfilled in the voids behind the active mining operations. No ex-pit dump needed to be created within the mining schedule.
• Open cut coal is planned to be mined by one 350 t hydraulic excavators and hauled by suitable matched rear dump trucks to a ROM stockpile pad before being processed by a coal handling and processing plant.
Underground
• The Millennium and Mavis Underground mines are proposed to operate as continuous miner-based Bord and Pillar operations.
• The Millennium and Mavis Underground mines are proposed to exploit the Leichhardt Seam. Conventional continuous miner-based mining methods are proposed to mine the reserve, with in-seam development by continuous proposed miners used to develop sub-panels panels.
• Personnel and equipment access to the underground project will be provided by transport roadways ad associated portal entries, while a dedicated conveyor roadway and portal entry will provide coal clear ........
Source:
Summary:
- subscription is required.
Production:
The Company’s Millennium Mine ceased production in March 2020, with sales continuing throughout May 2020. Mining recommenced at Millennium and Mavis Downs in August 2021.
Commodity | Units | 2022 | 2020 | 2019 | 2018 | 2017 | 2016 |
Coal (metallurgical)
|
Mt
| ...... | ...... | ...... | 1.7 | 3 | 3.2 |
Heat Content | BTU/lb | | | 12,600 | 12,600 | 12,600 | 12,600 |
- Subscription is required.
Reserves at December 31, 2022:
Mineral Resources are reported inclusive of Mineral Reserves.
Category | Tonnage | Commodity | Marketable Coal |
Proven
|
2.4 Mt
|
Coal (metallurgical)
|
2.2 Mt
|
Probable
|
3.6 Mt
|
Coal (metallurgical)
|
3 Mt
|
Proven & Probable
|
6 Mt
|
Coal (metallurgical)
|
5.2 Mt
|
Measured
|
18.6 Mt
|
Coal (metallurgical)
|
|
Indicated
|
11.8 Mt
|
Coal (metallurgical)
|
|
Inferred
|
10 Mt
|
Coal (metallurgical)
|
|
Total Resource
|
40 Mt
|
Coal (metallurgical)
|
|
Commodity Production Costs:
| Commodity | Units | 2022 |
Cash costs (sold)
|
Coal (metallurgical)
|
USD
|
......
|
- Subscription is required.
Financials:
| Units | 2022 |
Revenue
|
M AUD
| ...... |
Pre-tax Income
|
M AUD
| ...... |
After-tax Income
|
M AUD
| ...... |
- Subscription is required
HME Type | Model | Size | Quantity | Status | Leased or Contractor | Ref. Date | Source |
Continuous Miner
|
.......................
|
|
.......................
|
Required
|
|
Oct 27, 2021
|
p.1
|
Excavator
|
|
600 t
|
.......................
|
Existing
|
|
Apr 15, 2021
|
p.22,26
|
Excavator
|
|
350 t
|
.......................
|
Existing
|
|
Apr 15, 2021
|
p.22,26
|
.......................
|
.......................
|
|
.......................
|
Required
|
|
Oct 27, 2021
|
p.1
|
Truck (dump)
|
|
|
|
Existing
|
|
Apr 15, 2021
|
p.22,26
|