Mining Intelligence and News
Australia

Thunderbox & Bronzewing Operation

Click for more information

Categories

Overview

Mine TypeOpen Pit & Underground
StatusActive
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
  • Longhole open stoping
  • Sub-level open stoping (SLOS)
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotThunderbox & Bronzewing Operation includes the Thunderbox Operations (comprised of the open pit deposits - Thunderbox OP, Rainbow, Otto Bore, Bannockburn, North Well deposits and underground deposits - Thunderbox UG and Wonder deposits) and Bronzewing (Orelia Pit) Operations. In 2023, Bronzewing operations have been included in the Thunderbox operating segment.

As of 2024, the ore is sourced from the Thunderbox underground, Thunderbox open pits (D Zone and Otto Bore) plus the satellite Orelia open pit.

The Wonder Underground continues to ramp-up with high-grade ore feed expected from FY25.

The Thunderbox mill delivered a nameplate capacity of 6Mtpa for the June Quarter FY24, with a focus set on improving the consistency of the mill following the completion of the mill expansion in FY23.

The Bronzewing processing plant is currently on care and maintenance.
Related AssetsBronzewing Mine, Thunderbox OP Mine, Thunderbox UG Mine

Owners

SourceSource
CompanyInterestOwnership
Northern Star Resources Ltd. 100 % Indirect
The tenements (Thunderbox Operations) are all held by Northern Star (Thunderbox) Pty Ltd, Northern Star (SR Mining) Pty Ltd and Northern Star (Talisman) Pty Ltd which are all wholly owned subsidiaries of Northern Star Resources Ltd.

The Bronzewing Project`s tenements are variously registered (via Northern Star or wholly owned subsidiaries), with Northern Star Resources Limited being the 100% registered owner.

Contractors

Lock

- subscription is required.

Deposit type

  • Breccia pipe / Stockwork
  • Vein / narrow vein
  • Mesothermal

Summary:

Thunderbox Operation (TBO) includes the Thunderbox Project (comprised of the Thunderbox, Rainbow and Otto Bore gold deposits), the Kailis Project (comprised of the Kailis Stage 1 & 2 gold deposits), the Bannockburn Project (comprised of the Bannockburn and North Well gold deposits) and the Waterloo Project (comprised of the Waterloo and Amorac nickel deposits). In 2023, Bronzewing operations (Orelia Pit) have been included in the Thunderbox operating segment.

Thunderbox
Thunderbox is a mesothermal lode gold deposit located at the southern end of the Yandal greenstone belt in an area where several major shear zones converge and join with the Perseverance Fault.

The shear zone dips at 30° to 60° WSW, with the exception in the vicinity of the mineralisation, where the shear is vertical to steeply dipping. Mineralisation is hosted by strongly deformed, silicified and carbonate altered albite-quartz porphyry in the hangingwall of the shear zone. The shear juxtaposes foliated basalts and intrusive porphyries in the hangingwall against sedimentary rocks in the footwall. The zone of shearing is over 200m wide. An ultramafic unit occurs within the shear, in the footwall of the deposit and is attenuated along the shear. At the known extremities of the mineralisation, interpreted as a pepperitic apron, the porphyry host is less continuous and interchanges with mafic volcaniclastics.

The main gold related hydrothermal alteration assemblage comprises quartz-ankerite-arsenopyrite- pyrrhotite-galena and gold. Synmineralisation veins have a continuum of vein textures ranging from laminated to pseudo-breccias.

Throughout the Thunderbox Deposit, elevated grades occur within southerly plunging ore shoots that are more evident in the lateral extents of the orebody. Whilst the shoots persist centrally, the gold distribution is for more uniform and ubiquitous than in other areas.

Dimensions
Thunderbox mineralisation extends from 6879000mN to 6881000mN, 304000mE to 304400mE and 500 meters below surface

The Thunderbox shear generally strike NNW and dips 60° towards the WSW. In the vicinity of the strongest gold mineralisation the shear is vertical to steeply west dipping.

Rainbow
Locally the deposit is contained with a sheared unit with sediments in the footwall and mafics in the hanging wall. The shear dips to the west at approximately 450 and strikes 340 degrees.

Gold mineralisation at Rainbow occurs in shallow west dipping quartz +/-sulphide lodes within sheared basalts/sediments. Mineralisation occurs as one main lode, however other smaller lodes are apparent as is some supergene enrichment.

Dimensions
Rainbow mineralisation extends from 6888600mN to 6889200mN, 304750mE to 305000mE and 170 meters below surface. The shear system controlling mineralisation at Rainbow generally strikes North-South.

Otto Bore
Locally Otto Bore is situated within a NNW trending shear zone that dips moderately (50-60degrees) to the west. The mineralised zone largely hugs the rheological contact between the high-mg basalts and basalts. To the north mineralisation is also associated with a series of dolerites. Cross cutting NW trending faults are interpreted to disrupt the strike continuity of the main mineralisation and the southern extent of the Otto Bore deposit is terminated by a regional NNE trending shear. At depth higher grade mineralisation is typically associated with pervasive quartz veining and form short range southerly plunging shoots.

Dimensions
Otto Bore mineralisation extends from 6888600mN to 6889200mN, 304750mE to 305000mE and 170 meters below surface. The shear system controlling mineralisation at Otto Bore generally strikes North-South.

Kailis
Gold mineralisation at Kailis - Trump is hosted in quartz-sericite schist within a broad east-west trending, shallow to moderately dipping (40-50 degrees SSE) shear zone with a strike length in excess of 1800m. Mineralised intervals are often narrow (1-3m) but thicken to 8-20m in places. The shear zone encapsulates a high nugget mineralisation style with common occurrences of visual gold. The best gold grades tend to occur in the oxide and transitional zones with lower grades in the fresh rock. Mineralisation is open at depth but closed along strike.

Dimensions
The Kailis-Trump resource is contained within a + 40m wide shear zone which extends over a strike length of approximately 1,800m from 174,400mE to 176,200mE (MGA), and dips 30° to the south and flattens as move east toward Trump. Mineralisation is open at depth and to the west. It sits primarily within the oxide profile with economic mineralisation occurring at 30m below surface to 120m depth.

Bannockburn
The Central fault which hosts the Central orebody has a shallow northerly plunge and is the orebody on which the majority of the underground workings is focused There are a series of steeply east dipping lodes in the hangingwall of the central lode; these are interpreted as either tensional veins of reverse faults with shearing present along the veins. Black graphic shale units present within the stratigraphy have acted as a localised control on the mineralisation. The black shale units have taken up some of the deformation with stratigraphy parallel shearing and mafic sequences between the shales have extended to form steep east dipping extension veins.

Dimensions
Bannockburn mineralisation extends from 6849500mN to 6852500mN, 292500mE to 294500mE and 150 meters below surface. The Bannockburn gold deposit has a strike of 340° (NNW) and has a shallow plunge 5-10° to the NNW. The Bannockburn Shear dips steeply to the east, whilst the Central thrust varies from 30°dip to the west and east but is predominantly flat.

North Well
The mineralisation at North Well is confined to the Bannockburn Shear Zone (“BSZ”). The BSZ is a concave structure that has a strike length of approximately 30km, strikes roughly north south, and dips to the east. The BSZ is an approximately one kilometre wide zone of deformation that separates the basement granite/gneiss terrane to the west from greenstone terrane to the east. At North Well, the gold mineralisation is located approximately 400m from the main granite greenstone contact. Gold mineralisation is in east dipping basalts within a sequence of siltstones and acid volcaniclastics and occurs over a strike length of approximately 2600m and to a depth of 170m. Gold mineralisation is predominantly associated with quartz +/- sulphide filled shear structures.

Dimensions
North Well mineralisation extends from 6853875mN to 6856525mN, 291700mE to 292500mE and 250 meters below surface. The Bannockburn shear generally strikes north-south along the North Well deposit.

Orelia
Orelia is Archean gold mineralized deposit that is part of the Yandal Greenstone belt.
The stratigraphy dips approximately 60 degrees towards the west and strikes north-south. The oldest and the most western unit is the ultramafic sequence, towards the east, the komatiite unit has a sharp contact with a 2-5m massive sulphide/breccia unit. This contact is the Calista shear.

There are three main mineralised zones within the Archaean sequence; Orelia, Cumberland, and Calista.

Calista has two styles of mineralisation one shear hosted within the massive sulphides breccia unit in the contact between the ultramafic unit and the basalt and a stockwork of quartz-carbonate-sulphide veins within the basalt.

Orelia mineralisation consist mainly in a stockwork of quartz-carbonate-sulphide veins along the contacts of the Orelia dolerite and interflow sediment units that form a cigar/pipe like ore shoots.

Cumberland has two styles of mineralization: the narrow high-grade often presenting boudinage and inch and swell withe quartz veins with minor sulphides and low grade stockworks of quartz and quartz-carbonate veins related to the main veins.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

Annual milling capacity 7.8Mt: Thunderbox plant - 6Mt + Bronzewing plant (currently on care and maintenance) - 1.8Mt.
CommodityUnits202420232022202120202019201820172016
Gold oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe155,333145,152116,83731,465
All production numbers are expressed as metal in doré.

Operational metrics

Metrics20242023202220212020201920182017
Annual milling capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2.5 Mt2.5 Mt2.5 Mt
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe5,928,631 t
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe3,353 kt3,410,000 t2,611,000 t
Tonnes milled  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2,826 kt2,656,000 t2,305,000 t

Production Costs

CommodityUnits20242023202220212020201920182017
Credits (by-product) Gold AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Cash costs Gold AUD  ....  Subscribe 862 / oz   851 / oz   839 / oz  
Total cash costs (sold) Gold AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
All-in sustaining costs (AISC) Gold AUD  ....  Subscribe 1,004 / oz   1,071 / oz   1,253 / oz  
All-in sustaining costs (sold) Gold AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
All-in costs Gold AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
** Net of By-Product.

Financials

Units2024202320222021202020192018
Growth Capital M AUD  ....  Subscribe  ....  Subscribe 64.4   30.7  
Revenue M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 244.1   234.8  
Pre-tax Income M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 63.5   74.4  
EBITDA M AUD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Operating Cash Flow M AUD  ....  Subscribe  ....  Subscribe 117.1   65  

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 11, 2024
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Oct 11, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 17, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 17, 2024
....................... Subscription required ....................... Subscription required Subscription required Oct 17, 2024

Total WorkforceYear
...... Subscription required 2024
...... Subscription required 2023
...... Subscription required 2022
...... Subscription required 2021
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017

Aerial view:

Lock

- subscription is required.