Mining Intelligence and News
South Africa

Belfast Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotBelfast experienced several challenges at the start of the reporting 2023 that impacted production targets. In response, Belfast implemented several actions that contributed to a record production second half of the year and steady state for the operation. Vision 2025 was launched with the purpose of driving safety and increasing production volumes to 3.5Mt.

The Belfast licence to operate (BLTO), previously Belfast life optimisation (BXP), pre-feasibility study progressed well and is anticipated to be completed in 2024.

Future studies will address:
• Securing surface rights;
• Securing environmental approvals.

Owners

SourceSource
CompanyInterestOwnership
Exxaro Resources Ltd. 100 % Indirect

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

Belfast mine is on the far eastern edge of the Witbank coalfield. The coalfield extends about 190km east-west between the towns of Springs and Belfast, and about 60km in a north-south direction between the towns of Middelburg and Ermelo.

The Witbank coalfield has up to five coal seams in the middle Ecca group sediments of the Karoo supergroup. The Karoo sequence in the area is represented by the Dwyka formation and the middle Ecca with little or no lower Ecca development. The middle Ecca sequence of coal horizons, interbedded with sediments, is highly truncated due to erosion with only very minor areas where the full sequence is developed.

Main seams: S2, S3 and S4 are exploited where economical.

Locally, mainly three seams are targeted (S2, S3 and S4). S5 was intersected in only a few drill holes in the northern part of the project area. S2, the most prevalent seam, is consistently developed, except in areas where it has been eroded. It has an average thickness of 2.6m and gently dips to the south. S3 and S4 are sporadically developed due to erosion and both have an average thickness of 1.0m.

Due to the mine’s proximity to the northern edge of the Witbank basin, the primary control of coal development is the current weathering surface. The deposit is divided by a perennial stream, into two resource blocks under two distinct spurs in the surface topography. There is no indication of pertinent faulting from the drill hole information, but potential intrusions of dolerite dykes are outlined by regional airborne magnetics, indicating the possible occurrence of regional north-south trending dykes.

There are no known geological structures that may affect the geology or coal seam continuity.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits202420232022202120202019
Coal (thermal) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
All production numbers are expressed as clean coal. ^ Guidance / Forecast.

Operational metrics

Metrics20232022202120202019
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.08 Mt

Production Costs

Commodity production costs have not been reported.

Financials

Units2020
Sustaining costs M ZAR  ....  Subscribe
Growth Capital M ZAR  ....  Subscribe
Capital expenditures M ZAR  ....  Subscribe

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2024
....................... Subscription required ....................... Subscription required Subscription required Aug 14, 2024

Aerial view:

Lock

- subscription is required.