White Pine North Project

Click for more information

Categories

Overview

Mine TypeUnderground
StagePermitting
Commodities
  • Copper
  • Silver
Mining Method
  • Room-and-pillar
  • Continuous
Mine Life... Lock
SnapshotAs of July 2023, Highland Copper Company will continue to work alongside Kinterra in advancing the White Pine North copper and silver project through permitting and feasibility study. Based on recent Highland experience, estimate is 12 to 18 months from application to issue permits.

The mine is divided in three sectors: the Eastern, Center and Western parts. The mine will be accessed via a new covered box-cut to establish a portal at the mine entrance from the surface, located at the western side of the deposit.

Development will be divided into two periods: a pre-production development period and a production period. In 2027, the first panel will begin to reach a production rate of 2,450 t/d. A ramp up of four years is expected to get to the final plant throughput underground production.

As of June 30, 2024, Environmental baseline studies have been initiated. Baselining is a key initial step to support permit applications.

Owners

SourceSource
CompanyInterestOwnership
Highland Copper Company Inc. 34 % Indirect
Kinterra Copper USA LLC (operator) 66 % Indirect
On July 24, 2023, the Highland Copper Company completed a transaction with Kinterra Copper USA LLC in which the Highland Copper Company sold 66% of the common shares of White Pine Copper LLC. Effective July 24, 2023, the Highland Copper Company held an interest of 34% in White Pine Copper LLC.

Kinterra Copper USA, LLC is the operator of the project.

Contractors

Lock

- subscription is required.

Deposit type

  • Sediment-hosted

Summary:

The White Pine copper deposit is located in the Western Upper Peninsula of Michigan (USA) on the south side of Lake Superior. The copper mineralization in the area of the former White Pine Mine occurs in the bottom 6 m (20 ft) of the Nonesuch Formation at the contact with the Copper Harbor Conglomerate. The shale and siltstone in the lower part of the Nonesuch Formation are divided into two (2) mineralized shale units, the lower “Parting Shale” and the upper “Upper Shale”. The mineralized units are laterally persistent over tens of kilometres. The Parting Shale has an average thickness of 2.2 m for the entire of the deposit, and the Upper shale has a thickness of around 3.0 m.

The mineralization of the White Pine North Project is classified as a reduced facies stratiform sediment-hosted copper deposit and is often compared to the Kuperschiefer-type in Germany and Poland.

Mineralization
Copper mineralization at the White Pine North deposit occurs in two modes -- as very fine-grained sulfide (chalcocite) and as native copper. Sulfide mineralization is estimated to account for 85-90% of the copper in the deposit, but both modes of copper are intimately associated throughout the deposit. The copper mineralization at White Pine North is very consistent. All drill holes within the deposit intercepted mineralized strata. Within the deposit, the grades of the copper mineralization are usually slightly above cut-off grade over normal mining configurations. Most of the beds in the mineralized horizon are interpreted as continuous over the entire deposit. The beds comprising the Parting Shale pinch out in the southwest part of the historical mine. The variation of the thickness of mineralized beds is also low from drill hole to drill hole.

Sulfide Mineralization: The dominant copper mineral in the White Pine North deposit is chalcocite (Cu2S). It occurs as fine-grained laminae in interbedded sandstone and shale, very-fine grained disseminations and discrete clots in siltstone, and in veinlets and veins. The top of the copper mineralization is identified as the Top of Mineralization (“TOM”) Line or “fringe,” a narrow transition zone between cupriferous and pyritic zones. The fringe is typically very narrow (a few inches) and is identified by the sequence: chalcocite, digenite, bornite, chalcopyrite, and pyrite. Immediately above the cupriferous zone is a narrow zone containing disseminated greenockite, galena, and wurtzite. The yellow color of greenockite is easily spotted in drill core when present. The TOM Line crosscuts stratigraphy. In the shallow areas of the mine to the west near the portal, the TOM Line is typically 9.5 m (30 ft) above the Lower Sand while to the east the TOM Line descends through the otherwise normally mineralized beds.

Native Copper: Native copper mineralization occurs throughout the deposit. The most significant occurrences are sheet copper and mineralized sandstone. Sheet copper forms along thrust surfaces in the southwest mine. The sheet copper in thrust surfaces is bedding parallel as well as cross-cutting stratigraphy. Sheets can reach spectacular sizes. It was observed that some sheets could be traced through entire pillars. Mineralized sandstone occurs in the uppermost part of the Copper Harbor Conglomerate and is invariably associated with trapped hydrocarbons. The greatest amounts of mineralized sandstone were found in areas adjacent to the White Pine fault.

Mixed Sulfide and Native Copper Mineralization: Native copper and chalcocite are found throughout the deposit. Native copper is found in close relationship to copper sulfide in sandy lenses and pods (load casts) in the Lower Transition. Native copper in the Lower Transition is more common in channels incised into the top of the CHC. Both chalcocite and native copper mineralization are ubiquitous features of the mineralization of the Dark Grey Massive bed as well; chalcocite occurs as very-fine grained disseminations; and native copper, as discrete blebs.

Structural Relationship: Structure imposes significant control on the distribution and grade of mineralization. Higher-grade mineralized zone is spatially associated with the White Pine fault and thrust and strike-slip faults in the Southwest mine. Part of the increase in grade is due to the presence of mineralized sandstone and/or sheet copper. In addition, chalcocite mineralization is also enhanced as wider lamellae and cross-cutting veins and veinlets in the laminites.

Formation Water: The formation water encountered in the CHC is an alkaline brine (Table 7.1) with a chloride and TDS content approximately twice that of seawater. These compositions are thought to represent an approximate original composition of the depositional lake water and mineralization bearing fluid. Further support for alkaline brines existing during Nonesuch times is the abundance of carbonate throughout the CHC and Nonesuch Formation. Hydrocarbons: The White Pine Mine is well-known for its hydrocarbon seeps. In many areas near the White Pine Fault, hydrocarbons seep out of the back, drip, and form puddles of “oil” on the floor. The most prolific seeps were noted in the northwest portion of the mine near and beneath the North Number One tailings dam.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityProductUnitsAvg. AnnualLOM
Copper Payable metal M lbs 942,101
Copper Metal in concentrate M lbs 2,177
Copper Concentrate kt 3,232
Silver Payable metal koz 1,21527,031
Silver Metal in concentrate koz 30,290

Operational metrics

Metrics
Daily ore mining rate  ....  Subscribe
Daily milling capacity  ....  Subscribe
Annual ore mining rate  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Tonnes milled, LOM  ....  Subscribe
* According to 2023 study.

Production Costs

CommodityUnitsAverage
Credits (by-product) Copper USD  ....  Subscribe
C1 cash costs Copper USD  ....  Subscribe
C3 fully allocated costs Copper USD  ....  Subscribe
Assumed price Copper USD  ....  Subscribe
Assumed price Silver USD  ....  Subscribe
* According to 2023 study / presentation.
** Net of By-Product.

Operating Costs

CurrencyAverage
UG mining costs ($/t milled) USD  ....  Subscribe
Processing costs ($/t milled) USD  ....  Subscribe
G&A ($/t milled) USD  ....  Subscribe
Total operating costs ($/t milled) USD  ....  Subscribe
* According to 2023 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
Closure costs $M USD  ......  Subscribe
UG OpEx $M USD  ......  Subscribe
Processing OpEx $M USD 711
Refining and treatment costs $M USD  ......  Subscribe
Transportation (haulage) costs $M USD 375
G&A costs $M USD 483
Total OpEx $M USD  ......  Subscribe
Mining Taxes $M USD  ......  Subscribe
Income Taxes $M USD  ......  Subscribe
Total Taxes $M USD  ......  Subscribe
Royalty payments $M USD  ......  Subscribe
Gross revenue (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 0% $M USD  ......  Subscribe
Pre-tax NPV @ 8% $M USD  ......  Subscribe
After-tax NPV @ 0% $M USD  ......  Subscribe
After-tax NPV @ 8% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 16, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 12, 2023
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Jul 12, 2023
....................... Subscription required ....................... Subscription required Subscription required Jul 12, 2023
....................... Subscription required ....................... Subscription required Subscription required Sep 16, 2024
....................... Subscription required ....................... Subscription required Subscription required Sep 16, 2024

EmployeesTotal WorkforceYear
...... Subscription required 2023
...... Subscription required 2019

Aerial view:

Lock

- subscription is required.