Mining Intelligence and News
Brazil

Jambreiro Project

Click for more information

Categories

Overview

Mine TypeOpen Pit
StagePermitting
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Mine Life... Lock
SnapshotIn December 2024, the Jambreiro Iron Ore Project received priority status from Minas Gerais for its significant social and economic impact, with the State's Economic Development Committee approving its inclusion in the prioritized environmental permitting process.

In 2024, in response to growing interest from potential off-take partners and customers, Centaurus commenced a new study on the potential of the Jambreiro Project to deliver a Direct Reduction (DR) quality pellet feed concentrate

For the 3.0Mtpa project, a new Environmental Impact Assessment (EIA/RIMA) has been submitted and is currently awaiting approval. Key environmental approvals, including LP and LI, have already been issued. Regarding the Mines Department and the Ministry of Mines and Energy, the Plan of Economic Evaluation (PAE) has been approved, and the mining leases have been granted.

Owners

SourceSource
CompanyInterestOwnership
Centaurus Metals Ltd. 100 % Indirect
The Jambreiro Iron Ore Project comprises three granted Mining Leases (ML’s). All of these ML’s are 100%-owned by Centaurus Brasil Mineração Ltda, a wholly-owned Brazilian subsidiary of Centaurus.

Contractors

Lock

- subscription is required.

Deposit type

  • Iron formation hosted

Summary:

The Jambreiro Project is part of a sequence of Archean to lower Proterozoic iron formations (locally known as “itabirite”) and described as the Guanhães Group in the Guanhães region. Mineralisation is hosted in a metavolcanic-sedimentary sequence of rocks including itabirites, quartz-mica schist, amphibolite and gneiss. The friable itabirite extends to a vertical depth of 120m before becoming more compact. The principal ore zone, known as the Tigre Deposit, has a strike extent of 1.8km with true widths varying between 40-80m.

There are three satellite prospects in the immediate project area within 500m of the Tigre Deposit, being: the Cruzeiro, Galo and Coelho (North and South) Deposits. The friable iron mineralisation is continuous along strike, homogenous, medium to coarse grained and composed of mainly hematite and quartz with small amounts of magnetite.

The Itabirite mineralisation comprises concentrations of medium - coarse grained friable, semi-compact and compact material that have undergone enrichment. The mineralisation is composed of quartz, hematite, magnetite, martite with minor goethite, limonite, amphibole (Grunerite), Mica (muscovite) and clay minerals.

Itabirite thicknesses vary from 10m to up to 100m generally dipping 45-70° to the W-SW. The combined strike length of the mapped mineralisation is around 3,000m. Itabirite has been intersected at depths of 240m with friable itabirite intersected to 80m.

With the combination of the Tigre (1,700m), Cruzeiro (1,200m), Galo (1,500m) and Coelho (900m) prospects, the Jambreiro Resource has dimensions of approximately 5,500m of total strike length. The ore body outcrops in most places with a localized thin colluvial cover in places and is open at depth with the deepest mineralisation being intersected at 240m depth. The mineralisation is between 10-100m thick with the average thickness in the main deposit (Tigre) being around 60m.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnitsAvg. AnnualLOM
Iron Ore kt 1,00017,900
All production numbers are expressed as concentrate.

Operational metrics

Metrics
Stripping / waste ratio 0.68 *
Waste tonnes, LOM 29,522 kwmt *
Ore tonnes mined, LOM 43,339 kwmt *
Total tonnes mined, LOM 72,861 kwmt *
* According to 2019 study.

Production Costs

CommodityAverage
Cash costs Iron Ore  ....  Subscribe
Total cash costs Iron Ore  ....  Subscribe
Assumed price Iron Ore  ....  Subscribe
* According to 2020 study / presentation.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M AUD  ......  Subscribe
Gross revenue (LOM) $M AUD  ......  Subscribe
EBITDA (LOM) $M AUD  ......  Subscribe
Pre-tax NPV @ 8% $M AUD  ......  Subscribe
After-tax NPV @ 8% $M AUD  ......  Subscribe
After-tax IRR, %  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 28, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 28, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 28, 2025

Total WorkforceYear
...... Subscription required 2019

Aerial view:

Lock

- subscription is required.