Mining Intelligence and News
Chile

El Zorro (Ternera-Phase 1) Project

Click for more information

Categories

Overview

Mine TypeOpen Pit
StagePreliminary Economic Assessment
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
Mine Life... Lock
SnapshotTesoro Gold advances exploration activities, expands resource base and advances development of world-class gold mine at El Zorro Gold Project.

In January 2025, Tesoro Gold announced significant assay results from its ongoing infill and extensional drilling program at the El Zorro Gold Project.

Tesoro Gold plans update Production Schedule and Scoping Study post Mineral Resource Estimate update.

Owners

SourceSource
CompanyInterestOwnership
Tesoro Gold Ltd. 89.1 % Indirect
Tesoro’s 100%-owned Chilean subsidiary by ordinary shares, Tesoro Mining Chile SpA (TMC) has increased its ownership of the Joint Venture company that holds the El Zorro concessions, El Zorro S.C.M. to approximately 94.42% (from 85%).

The minority Shareholder in El Zorro S.C.M., being Wanaco SpA (Wanaco), declined to participate in the capital increase, resulting in TMC increasing its ownership in El Zorro S.C.M. to approximately 94.42%. Tesoro’s underlying ownership interest in El Zorro is now approximately 89.1%.

On 31 August 2024, the Tesoro received notice that certain claims filed by Wanaco in February 2024 relating to an alleged “abandonment” of works under the option and JV agreement have been dismissed by the 29th Civil Court of Santiago. The Court ordered Wanaco to pay costs in favour of Tesoro. The Court’s dismissal represents a further rejection of Wanaco SpA's attempts to have mining concessions, currently owned by Tesoro subsidiary El Zorro S.C.M., transferred.

Contractors

Lock

- subscription is required.

Deposit type

  • Breccia pipe / Stockwork
  • Vein / narrow vein
  • Intrusion related

Summary:

The El Zorro Project area is in an early Cretaceous volcanic arc containing structurally controlled batholitic intrusions. During this period extensional tectonic activity included the formation of the intra-arc, sinistral, strike-slip Atacama Fault System along the Coastal Cordillera. The metallogenesis during the evolution of the Chilean Andes was dominated by copper-gold mineralisation characterised by several Late Jurassic and Early Cretaceous volcanic-hosted Cu-Ag manto-type deposits, mesothermal Cu-Au-Ag veins and iron oxide copper-gold (IOCG) deposits. Although the El Zorro mineralisation is located within a belt characterised by IOCG-type mineralisation, the El Zorro mineralisation is more typical of an intrusive related gold deposit type.

The mineralisation model is considered to be an intrusive related gold deposit. The key characteristics that are consistent with this style deposit include:
• Low sulphide content, (typically <5%); reduced ore mineral assemblage that typically comprises pyrite and lacks primary magnetite or hematite
• Mineralisation occurs as sheeted vein deposits or stockwork assemblages and often combine gold with variably elevated Bi, W, As, Mo, Te, and/or Sb but low concentrations of base metals as seen in the initial four holes by Tesoro at El Zorro
• Restricted and commonly weak proximal hydrothermal alteration
• Intrusions of intermediate to felsic composition.

The oldest rocks in the project area are Palaeozoic sediments of probable Devonian to Lower Carboniferous age. These have been intruded by a Jurassic granodiorite body of the Coastal Batholith Series which has thermally metamorphosed the sediments around the intrusion contact. Fine-grained sediments have been metamorphosed to phyllites and massive fine grained dark hornfels and the more arenaceous sediments to quartzites.

Within the El Zorro Project, the main mineralised intrusions are underlain by a Devonian age sedimentary rock sequence consisting of interbedded siltstone, volcaniclastics, and minor quartzite, all of which has been variably metamorphosed and folded.

The sediments have been intruded by multiple mineralised tonalite to diorite intrusions which have been emplaced as dykes and sills. A large granodiorite intrusion has thermally metamorphosed the sediments within several hundred metres of the contact resulting in highly resistant phyllite, dark fine grained hornfels and quartzite. The phyllite is a very fine grained, foliated, black, dense rock.

The later stage intrusive tonalites occur as south-west to north-east striking bodies dipping toward the south-east.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

Operational metrics

Metrics
Annual ore mining rate  ....  Subscribe
Annual processing capacity  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2023 study.

Production Costs

CommodityUnitsAverage
Cash costs Gold USD  ....  Subscribe
All-in sustaining costs (AISC) Gold USD  ....  Subscribe
Assumed price Gold USD  ....  Subscribe
* According to 2023 study / presentation.

Operating Costs

CurrencyAverage
OP mining costs ($/t mined) USD  ....  Subscribe
OP mining costs ($/t milled) USD  ....  Subscribe
Processing costs ($/t milled) USD  ....  Subscribe
G&A ($/t milled) USD  ....  Subscribe
Total operating costs ($/t milled) USD  ....  Subscribe
* According to 2023 study.

Project Costs

MetricsUnitsLOM Total
Pre-Production capital costs $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
Total CapEx $M USD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 5% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
Pre-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jan 17, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 17, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 17, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 17, 2025

Total WorkforceYear
...... Subscription required 2023

Aerial view:

Lock

- subscription is required.