Mining Intelligence and News
Morocco

Boumadine Project

Click for more information

Categories

Summary

Mine TypeOpen Pit & Underground
Study CompletedPreliminary Economic Assessment
Study in ProgressPreliminary Economic Assessment Update
Commodities
  • Gold
  • Silver
  • Zinc
  • Lead
  • Copper
  • Germanium
Mining Method
  • Truck & Shovel / Loader
  • Longhole open stoping
  • Cut & Fill
  • Sub-level open stoping (SLOS)
Backfill type ... Lock
Mine Life... Lock
SnapshotIn 2025, an update of the Boumadine PEA was commenced, which is expected to be completed in H2 2025.

The gold and silver within the pyrite of the Boumadine ore is encapsulated leaving it unleachable by traditional methods. The Au/S ratio for Boumadine is far from the generally seen ratio for existing projects. Aya Gold & Silver Inc. is currently assessing the potential of various gold and silver extraction technologies.

In 2024, 107,683m of drilling within the Boumadine main trend and other targets was completed, that culminated in a mineral resource update on February 24, 2025.

Aya Gold & Silver Inc. added 15 permits in 2024, expanding Boumadine’s exploration footprint to 212km2 by year end. The company also added 4 mining licenses in January 2025 to extend its land package to 272 km2.
Latest NewsAya Gold & Silver Reports High-Grade Drill Results at Boumadine, Extends Tizi Zone to 2.2km and Identifies New Regional Targets     April 8, 2025

Owners

SourceSource
CompanyInterestOwnership
L'Office Nationale des Hydrocarbures et des Mines 15 % Indirect
Aya Gold & Silver Inc. 85 % Indirect
Boumadine Global Mining S.A. was incorporated on December 31, 2019 with Aya Gold & Silver Inc. and Office National des Hydrocarbures et des Mines (ONHYM) as 85%-15% shareholders respectively.

Boumadine Global Mining S.A. (BGM) holds the mining title of the Boumadine Mining License.

Contractors

Lock

- subscription is required.

Deposit type

  • Vein / narrow vein
  • Epithermal
  • Breccia pipe / Stockwork

Summary:

Deposit Type
Boumadine mineralization traditionally was considered to be hosted only in felsic tuffs (Abia et al., 2003; Bouabdellah and Levresse, 2016; Duplessis et al., 2019). However, drilling completed from 2017 to 2023 intercepted mineralized veins within mafic tuffs. Furthermore, the mineralized veins in the mafic tuffs appear to be more continuous, richer and thicker than in the felsic tuffs.

Hydrothermal alteration at Boumadine resembles that found in high sulphidation (acid) epithermal systems. Aluminous alteration is more proximal to sulphide-rich mineralized zones and the propylitic alteration more distal. Propylitization is generally induced by the convection of surface fluids, whereas aluminous alteration results from the contribution of acidic magma-derived fluids during degassing of andesite/diorite subvolcanic intrusions.

On the other hand, high-sulphidation deposits are composed of sulphides rich in S and Cu, such as tennantite and enargite. At Boumadine, the sulphides are mainly pyrite and minor sphalerite and galena, and trace chalcopyrite. This sulphide mineral affiliation is more like that of a volcanogenic massive sulphide type.

Aya Gold & Silver Inc. preferred interpretation is that the mineralizing system at Boumadine developed under shallow submarine conditions in a graben setting (Bouabdellah and Levresse, 2016). In this model, magma-derived high-temperature acidic fluids/vapours containing Au and Ag ascend from the subvolcanic andesite/diorite intrusions and mix with circulating low-temperature, seawater-derived chlorinated fluids containing Fe, Zn and Pb. Mixing, cooling and wall rock reactions drive metal precipitation and deposition in volcaniclastic rocks below the seafloor.

Mineralization
The Boumadine mineralized zones generally consist of 1 to 4 m-wide massive sulphide lenses/veins oriented N20°W and dipping 70° east. The massive sulphide veins (>70% sulphide) are composed mainly of pyrite, sphalerite, galena, arsenopyrite and chalcopyrite, with subordinate amounts of cassiterite, silver-rich sulphosalts, stannite, enargite, bismuthinite, native copper and bismuth. The main mineralization zone is generally surrounded by a 1 to 10 m (locally up to 20 m) thick halo of 10 to 30% disseminated pyrite and two types of veinlets: 1) quartz-carbonate-galena-sphalerite veinlets; and 2) massive pyrite veinlets (Freton, 1988).

Within massive sulphide veins, zones of breccias with silicified angular fragments and round fragments have been completely replaced by pyrite. Those breccia zones underline the presence of syn-volcanic faults, which probably served as fluid pathways for the mineralization. In weathered felsic tuffs, breccia fragments can be replaced by pyrite which locally form large, mineralized sub-zones as much as 10 m thick. Those thick sub-zones are interpreted to be the upper part of the hydrothermal system. Geochemically, there is a strong positive correlation of gold with silver and copper and a weaker correlation of zinc with lead and molybdenum.

U/Pb single zircon dating from a “chonolithic” rhyolite intrusion cutting the mineralized veins yielded an age of 553±16 Ma (Levresse, 2001). This result is consistent with a late Neoproterozoic maximum age for the mineralization.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnitsAvg. AnnualLOM
Gold Metal in conc./ doré oz 327,226
Silver Metal in conc./ doré oz 19,734,105
Zinc Metal in concentrate t 149,540
Lead Metal in concentrate t 38,749
Gold Equivalent Metal in conc./ doré oz 108,6751,305,325
Germanium Metal in concentrate kg 16,150

Operational metrics

Metrics
Daily ore mining rate 2,000 t *
Daily processing capacity 2,000 t *
Hourly processing capacity 100 t *
Annual ore mining rate 660 kt *
Annual processing capacity 660 kt *
Ore tonnes mined, LOM 7.59 Mt *
Tonnes processed, LOM 7.59 Mt *
* According to 2019 study.

Production Costs

CommodityUnitsAverage
Assumed price Germanium USD 2,200 / kg *  
Assumed price Lead USD 2,501 / t *  
Assumed price Zinc USD 3,125 / t *  
Assumed price Silver USD 21 / oz *  
Assumed price Gold USD 1,380 / oz *  
* According to 2019 study / presentation.

Operating Costs

CurrencyAverage
OP mining costs ($/t milled) USD  ....  Subscribe
Combined mining costs ($/t milled) USD  ....  Subscribe
Processing costs ($/t milled) USD  ....  Subscribe
G&A ($/t milled) USD  ....  Subscribe
Total operating costs ($/t milled) USD  ....  Subscribe
* According to 2019 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
Total CapEx $M USD  ......  Subscribe
OP/UG OpEx $M USD  ......  Subscribe
Processing OpEx $M USD 347.3
Refining and transportation $M USD  ......  Subscribe
G&A costs $M USD 13.3
Total OpEx $M USD  ......  Subscribe
Income Taxes $M USD  ......  Subscribe
Gross revenue (LOM) $M USD  ......  Subscribe
EBITDA (LOM) $M USD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 5% $M USD  ......  Subscribe
Pre-tax NPV @ 6.5% $M USD  ......  Subscribe
After-tax NPV @ 5% $M USD  ......  Subscribe
After-tax NPV @ 6.5% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Apr 17, 2025
....................... Subscription required ....................... Subscription required ........... Subscription required May 24, 2019
....................... Subscription required ....................... Subscription required Subscription required Apr 17, 2025
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Apr 17, 2025
....................... Subscription required ....................... Subscription required Subscription required Apr 17, 2025
....................... Subscription required ....................... Subscription required Subscription required Apr 17, 2025

Workforce

Total WorkforceYear
...... Subscription required 2019

Aerial view:

Lock

- subscription is required.