Mining Intelligence and News
Canada

True North Complex

Click for more information

Categories

Summary

Mine TypeUnderground
StatusInactive / Suspended
Commodities
  • Gold
  • Silver
Mining Method
  • Longhole stoping
Production Start... Lock
SnapshotThe True North Complex includes an inactive underground gold mine and mill. Underground operations are suspended, with access to the mine temporarily closed. Until late 2022, 1911 Gold processed tailings through the mill.

Mineral Resources are reported for the True North Project, encompassing the True North Mine Complex, SG1 Mine, and SG3 deposit. The Company is actively exploring the Rice Lake greenstone belt to discover new resources for mill feed.

In July 2023, 1911 Gold entered an agreement with Grid Metals to lease the mill for lithium ore processing from the Donner Lake project. The agreement was terminated in February 2025.

As of 2024, the Company continued efforts to restart the True North gold mine, aiming for late 2026. However, there is no assurance the restart will be economically viable.
Latest News1911 Gold Intersects up to 58.66 g/t Gold over 1.40 m on San Antonio West Zone at True North     June 10, 2025

Owners

SourceSource
CompanyInterestOwnership
1911 Gold Corp. 100 % Indirect
1911 Gold Corporation owns and operates the Rice Lake property which holds the True North gold mine and mill.

Contractors

Lock

- subscription is required.

Deposit type

  • Mesothermal
  • Vein / narrow vein
  • Orogenic
  • Tailings

Summary:

The True North Gold Deposit is a classical Archean orogenic gold deposit, consisting of quartz-carbonate vein systems hosted by brittle-ductile shear zones and faults in volcanic and sedimentary rocks (greenstones). The deposit is hosted by a north-younging, moderately inclined, succession of volcanic and sedimentary rocks, belonging to the 2.73–2.72 Ga Gem assemblage. At Rice Lake, this assemblage includes volcanic sandstone and conglomerate, tholeiitic basalt flows and gabbro sills and dacitic volcaniclastic rocks, intruded by various felsic porphyry dikes.

All the vein-hosted gold mineralization at True North is hosted within the Townsite Unit of the Bidou Lake Assemblage and within the SAM unit gabbro which intrudes the Townsite Unit. The Bidou Lake Assemblage forms a north-facing stratigraphic sequence of tholeiitic basalt to intermediate volcanic flows, dacite crystal tuffs and breccias overlain by well stratified felsic epiclastic rock interpreted to be of pyroclastic and sedimentary origin. The stratigraphic sequence is intruded by tholeiitic gabbro sills and dykes and felsic porphyry dykes.

In the True North deposit, the gold-bearing quartz veins occur mainly as either “16-type” shear zone veins or “38-type” tensional fracture stockwork veins or, where they intersect, as a combination of the two vein types. The 16-type appear to be fault fill veins with generally higher grades and more continuity, which are laminated with pressure solution seams (stylolites) and trend north-northeast.

Tailings Management Area
The Tailings Management Area (TMA) is located approximately 1-mile (1.6 km) north of the process plant in an area naturally defined by bedrock ridges around the perimeter of a previously flat boggy area. The original ground surface of the bog was near elevation 889 feet above sea level (asl) (271 m asl) (geodetic) with bedrock ridges on the south and west sides up to 920 feet above sea level (asl) (280 m asl) and bounded to the north by bedrock up to elevation 985 feet asl (300 m asl).

The TMA currently consists of eight dykes with a number of the embankments separated by bedrock outcroppings such that they follow an A/B nomenclature. The embankments have been designed and constructed in various stages and phases from 1997 onwards to the most recent raises and improvements completed from 2012 to 2014. The current configuration of the TMA consists of a tailings pond and polishing pond, separated by dyke 7. The west half (approx.) of the tailings pond has reached its capacity, with tailings placed up to the crest of dykes 1, 2, 8, and a portion of dyke 3, while the east half of the tailings pond contains tailings submerged beneath water ranging in depth from less than 3 feet (1m) to several feet (meters). No spillway or low-level outlet structures are present in the TMA. It is understood that the TMA has been designed to safely retain water from the mill discharge, runoff, and storm events.

In order to increase the capacity to retain tailings, the former Operator began development of a new area termed the East Tailings Management Area (ETMA). The ETMA is located directly east of the TMA and currently consists of dyke 9 along its south perimeter, with dyke 6 of the TMA forming the containment along the west side. The natural contours to the north and east provide containment of the remainder of the ETMA.

Dyke 9 has an overall length of nearly 5,000 feet (1,500 m) and at its current constructed elevation, has a height of 10 feet to 13 feet (3m to 4 m). No spillway or low-level outlet structures are present in the ETMA. It is understood that the TMA has been designed to safely retain water from the process plant discharge, runoff, and storm events.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

During the year ended December 31, 2023, the Company completed the clean-out of the mill that had started in December 2022, recovering 478 ounces of gold.
CommodityUnits20232022202120202019201820172016
Gold oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe5,6537,29927,87710,187
Silver oz 3,174853
Gold Equivalent oz 27,91910,199
All production numbers are expressed as metal in doré.

Operational metrics

Metrics2022202120202019201820172016
Daily processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe2,500 tons
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe222,134 tons249,817 tons297,826 tons95,710 tons
Daily processing rate  ....  Subscribe  ....  Subscribe  ....  Subscribe262 tons
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe19,301 tons309,343 tons51,768 tons

Production Costs

Commodity202220212020201920182017
Cash costs (sold) Gold Equivalent 1,504 / oz  USD
Total cash costs (sold) Gold  ....  Subscribe  ....  Subscribe  ....  Subscribe 1,880 / oz  CAD 2,603 / oz  CAD
All-in sustaining costs (sold) Gold  ....  Subscribe  ....  Subscribe  ....  Subscribe 2,168 / oz  CAD 2,762 / oz  CAD

Operating Costs

Currency2016
UG mining costs ($/t mined) USD  ....  Subscribe

Mine Financials

Units2023202220212020201920182017
Capital expenditures M USD 14.5  
Revenue M  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 12.3  CAD 18  CAD 32.6  USD
Operating Income M  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -8.6  CAD -17.3  CAD -17  USD
Pre-tax Income M  ....  Subscribe  ....  Subscribe  ....  Subscribe -7.8  CAD -33.1  CAD
After-tax Income M  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jun 17, 2025
....................... Subscription required ....................... Subscription required Subscription required Jun 17, 2025

Workforce

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2016

Aerial view:

Lock

- subscription is required.