Mining Intelligence and News
Australia

Mardie Project

Click for more information

Categories

Summary

Mine TypeIn-Situ
Study CompletedFeasibility
StageConstruction
Commodities
  • Salt (rock)
  • Potash
Mining Method
  • Brine mining
Project Timeline... Lock
Mine Life... Lock
SnapshotThe Mardie Salt and Potash Project will be the largest solar salt project in Australia and the third largest globally.

The Optimized Feasibility Study was published on April 21, 2021. The updated base case financial model for project was released on June 20, 2023.

The project will comprise nine evaporation ponds, salt and SOP crystallisers plus salt washing and SOP process plants. Product will be shipped onto capsize vessels from jetty with a conveyor system.

A main construction commenced in early 2022.

Full-scale operations commenced on 15 April 2025. Salt construction 61 per cent complete. Secondary seawater intake, ponds six to nine, and the haul road were completed.

As at May 2025, SOP FEED studies are underway to understand the full operational flowsheet, cost and schedule. A decision on the SOP Plant is due after completion of the FEED. Early design for a pilot plant has commenced to test the design at Mardie before committing to a full-scale production plant.

Owners

SourceSource
CompanyInterestOwnership
Mardie Minerals Pty Ltd. (operator) 100 % Direct
BCI Minerals Ltd. 100 % Indirect
The Mardie Project is 100% owned by Mardie Minerals Pty Ltd, a wholly owned subsidiary of BCI Minerals Limited.

Contractors

Lock

- subscription is required.

Deposit type

  • Brine

Summary:

The Project area straddles the coastal plain and salt marshes, extending offshore across tidal flats and into the shallow marine environment along the Pilbara coast. The coastal plain in the Project area is a broad expanse of low-lying alluvium sloping gently seawards, fringed by tidal flats, mangroves, sand dunes and sandy shoals.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityProductUnitsAvg. AnnualLOM
Sulfate of potash (SOP) Fertilizer kt 1407,900
NaCl Salt Mt 5.4310

Operational metrics

Metrics
Annual processing rate  ....  Subscribe
Annual brine extraction  ....  Subscribe
* According to 2023 study.

Production Costs

CommodityAverage
All-in sustaining costs (AISC) NaCl  ....  Subscribe
All-in sustaining costs (AISC) Sulfate of potash (SOP)  ....  Subscribe
Assumed price NaCl  ....  Subscribe
Assumed price Sulfate of potash (SOP)  ....  Subscribe
* According to 2023 study / presentation.

Project Costs

MetricsUnitsLOM Total
Total CapEx $M AUD  ......  Subscribe
Pre-tax NPV @ 7% $M AUD  ......  Subscribe

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Jun 22, 2025
....................... Subscription required ....................... Subscription required Subscription required Jun 22, 2025
....................... Subscription required ....................... Subscription required Subscription required Jun 22, 2025
....................... Subscription required ....................... Subscription required Subscription required Jun 22, 2025
....................... Subscription required ....................... Subscription required Subscription required Jun 22, 2025
....................... Subscription required ....................... Subscription required Subscription required Jun 22, 2025
....................... Subscription required ....................... Subscription required Subscription required Jun 22, 2025
....................... Subscription required ....................... Subscription required Subscription required Jun 22, 2025

Workforce

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2023

Aerial view:

Lock

- subscription is required.