Mining Intelligence and News
Liberia

Western Range Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Iron Ore
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotWestern Range Project includes the Mt. Tokadeh, Mt. Gangra, and Mt Yuelliton deposits and has been mining direct shipping ore ("DSO") from the Mt. Tokadeh and Mt. Gangra deposits in northern Nimba, Liberia.

On September 10, 2021, the Liberian Government and ArcelorMittal signed an amendment to the Mineral Development Agreement (MDA). The Phase 2 expansion includes the construction of a 15 million tonnes per annum concentrator plant project to treat oxidized and transitional ores to significantly ramp up production of premium iron ore.

First concentrate is expected during the fourth quarter of 2024.

Under the agreement the Company has further expansion opportunities up to 30 million tonnes per annum.

Owners

SourceSource
CompanyInterestOwnership
Government of Liberia 15 % Indirect
ArcelorMittal SA 85 % Indirect
ArcelorMittal’s ownership at ArcelorMittal Liberia Limited (AML) is 85%, with the remaining 15% owned by the Liberian Government.

Deposit type

  • Banded iron formation

Summary:

The ArcelorMittal iron ore deposit at Yekepa, also known as the Nimba No. 1 Mine and referred to above as Mount Tokadeh, is also located in Liberia, <5 km SW of the Guinea-Liberia-Core d'Voire border intersection and 5 km from the original Nimba mine in Liberia. Following the civil war and subsequent changes in control, ArcelorMittal commenced mining of the Mount Tokadeh deposit at Yekepa, in 2011. Mineralisation occurs as a siliceous goethite/hematite/magnetite ore, containing ~60% Fe, 10% SiO2, 2% Al2O3 and 0.1% P. It is derived from a banded iron formation on Mount Gangra in the Yekepa Range.

Three deposits within the MDA are grouped under the name “Western Range Project”, which includes the Mt. Tokadeh, Mt. Gangra and Mt Yuelliton deposits.

The Nimba Itabirites is a 250 to 450-meter-thick recrystallized iron formation. Although the iron deposits at Mt. Tokadeh, Mt. Gangra and Mt Yuelliton fit the general definition of Itabirite as laminated metamorphosed oxide-facies iron formation, they are of lower iron grade than the ore previously mined at Mount Nimba.

The Nimba deposits are hosted by the 1400 m thick Nimba Supergroup exposed as ridges bounded by lowlands of the older Yekepa Supergroup of quartzo-feldspathic gneisses and orthoamphibolites. The lower half of the Nimba Supergroup is comprises metamorphosed mafic volcanics of the Seka Valley Schists. The upper half of the supergroup is composed of metasediments subdivided into the:
• Gbahm Ridge Formation - 250 m of quartz-chlorite-graphite phyllite with accessory muscovite, garnet, biotite, carbonate and tourmaline. The upper 50 m contains unward increasing interbeds of metachert;
• Nimba Itabirite - a 250 to 400 m thickness of predominantly magnetite-quartz banded iron formation (BIF) which hosts the main orebody;
• Mt Alpha Formation - >100m thickness of phyllite mainly composed of quartz and biotite with subordinate chlorite, muscovite, garnet, amphibole and pyrite.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits20232022202120202019201820172016
Iron Ore Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe4.44.622.1
All production numbers are expressed as fines.

Operational metrics

Metrics20232022202120202019201820172016
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe4.3 Mt4.6 Mt1.9 Mt2 Mt

Production Costs

Commodity production costs have not been reported.

Financials

Units20232022202120202019
Revenue M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 257  
After-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 115  
Operating Cash Flow M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 84  

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Mar 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Mar 27, 2024

Total WorkforceYear
...... Subscription required 2018

Aerial view:

Lock

- subscription is required.