Mining Intelligence and News
Australia

Ballarat Mine

Click for more information

Categories

Summary

Mine TypeUnderground
StatusActive
Commodities
  • Gold
Mining Method
  • Longhole open stoping
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotBallarat Gold Mine is a modern underground mine.

Since acquiring the mine in 2023, Victory Minerals has invested in replacing the aged underground mining fleet and equipment, implemented modern blasting technologies to improve efficiency while minimising environmental disturbance, and continued refining sustainable mining practices.

On 20 July 2024, the Ballarat Gold Mine received approval for an open-air waste storage facility, with Tailings Storage Facility 4 securing more than 10 years of production capacity.

By May 2025, Victory was commissioning new plant and equipment to return tailings from the processing facility back to the underground areas they were mined from, while construction of an upgraded milling and processing facility was underway and scheduled for completion by the end of 2025.

Victory has also committed to a tripling of the exploration drilling budget underground to explore and identify additional resources in and around the underground mine.

Owners

SourceSource
CompanyInterestOwnership
Victory Minerals Pty Ltd. (operator) 100 % Direct
Victory Minerals Holdings Pty Ltd. 100 % Indirect
The Ballarat Mine is owned and managed by Victory Minerals Pty Ltd., a wholly owned subsidiary of Victory Minerals Holdings Pty Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Orogenic
  • Vein / narrow vein

Summary:

The Ballarat goldfield is positioned in the hanging-wall of the crustal-scale north-south striking, west-dipping Williamson Creek reverse fault. Three north-trending mineralised zones are identified in the Ballarat goldfields: Ballarat East, Ballarat West (including Ballarat South) and Little Bendigo. Gold mineralisation is hosted by Ordovician turbidites of the Castlemaine Supergroup.

The Ballarat Goldmine is located in the Ballarat East goldfield and lies on the eastern limb of the Ballarat Anticline. The turbidites were folded into a series of north-south trending, tight, upright chevron-style anticlines with wavelengths ranging from 50 m to 300 m. Numerous parasitic folds occur around the hinge zones of the larger folds. The three major fold lines of the Ballarat East goldfield are the Sulieman, Scandinavian and First Chance Anticlines.

The Ballarat goldfields are divided into multiple ‘compartments’ by a series of major faults referred to as cross courses. Cross-course faults are sub-vertical, brittle faults that are un mineralised yet play an important role in the distribution of mineralisation, and gold tenors are relatively consistent within individual compartments. Cross courses typically trend northeast or northwest and have displacements ranging from centimetres to several hundreds of metres.

The Ballarat goldfield is an orogenic gold deposit. Vein mineral assemblages include several generations of quartz with chlorite, sericite, albite and carbonate minerals. Arsenopyrite and pyrite are the dominant sulphide minerals with galena, sphalerite, chalcopyrite and pyrrhotite also commonly observed. The estimated percentage of sulphide minerals in the veins is 2%. The host rocks show bleaching, carbonate aggregates, disseminated pyrite, arsenopyrite and pervasive halos of sericitic alteration around quartz veining.

Mineralogical observations that gold may occur in fractures within sulphide minerals or attached to the margins of sulphide grains indicate that gold was deposited after the sulphides. Gold occurs as native gold particles that range in size from several microns up to 30 mm.

The Ballarat Goldmine has three major productive lines of reef, located on anticlines of the same name: the Sulieman minor Line, the Scandinavian Line and the First Chance Line. A minor gold bearing line is the Oregon line to the east of development. The major folds are continuous along the length of the goldfield. Each line of reef is divided into several compartments ranging in length from 150m to 500m along strike.

Gold mineralisation occurs as en-échelon vein arrays linked to vertically stacked shallow to steep west-dipping reverse faults that cross cut the eastern limb of the anticlines. West-dipping faults are generally narrow (< 1 m wide) and mineralisation is constrained within the fault plane. The Mako Fault Zone (MFZ) in the Llanberris Compartment is an example of a west-dipping reverse fault zone. The fault zones dip between 20o and 70o, extend up to 250m along strike (north-south), 90m down dip and ranges in thickness from 0.5m to 6m. Veining comprises a combination of massive quartz, weakly laminated quartz, brecciated quartz and stockwork veins. Later faults, offsetting early stage veining, have been observed amongst a complex zone of shearing and fault gouge development.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

As of May 2025, Ballarat goldfields aiming to produce between 30,000 and 40,000oz of gold annually.

2020 production is reported for 5 quarters passed.
CommodityUnits20242022202120202019201820172016
Gold oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe41,83035,10441,39141,516
All production numbers are expressed as metal in doré.

Operational metrics

Metrics2022202120202019201820172016
Annual processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe600,000 t600,000 t600,000 t600,000 t
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe227,426 t
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe267,941 t260,165 t270,699 t251,000 t
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe273,072 t

Production Costs

Commodity202220212020201920182017
Cash costs Gold  ....  Subscribe  ....  Subscribe  ....  Subscribe
Cash costs (sold) Gold 1,313 / oz  USD 1,395 / oz  AUD 1,088 / oz  AUD
All-in sustaining costs (AISC) Gold  ....  Subscribe  ....  Subscribe  ....  Subscribe 1,578 / oz  AUD
All-in sustaining costs (sold) Gold 1,762 / oz  AUD 1,485 / oz  AUD

Mine Financials

Units202220212020201920182017
Capital expenditures M SGD  ....  Subscribe
Revenue M SGD  ....  Subscribe  ....  Subscribe  ....  Subscribe 70.1   59.1   72.6  
Gross profit M SGD  ....  Subscribe  ....  Subscribe  ....  Subscribe 7   -5.9   6.8  
Pre-tax Income M SGD  ....  Subscribe  ....  Subscribe  ....  Subscribe 1.2   -10.6   -0.5  
After-tax Income M SGD  ....  Subscribe  ....  Subscribe  ....  Subscribe 0.3   -10.6   -0.5  
Operating Cash Flow M SGD  ....  Subscribe  ....  Subscribe  ....  Subscribe 12.5   2.4   17.3  

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 18, 2025
....................... Subscription required ....................... Subscription required Subscription required Nov 18, 2025

Workforce

EmployeesContractorsTotal WorkforceYear
...... Subscription required 2025
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required ...... Subscription required ...... Subscription required 2014

Aerial view:

Lock

- subscription is required.