Mining Intelligence and News
Canada

Genesee Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusClosing / Closed
Commodities
  • Coal (thermal)
Mining Method
  • Dragline
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotTo support the transition to burning 100% natural gas at Genesee power plant 1 and 2 in 2024, excess coal inventory was extracted prior to the conclusion of coal mining at Genesee in the fourth quarter of 2023.

In 2024, Capital Power recorded decommissioning provisions for the Genesee coal mine (the Genesee Mine) as it was obliged to remove the facilities at the end of their useful lives and restore the mine sites to their original condition.

Decommissioning provisions for the Genesee Mine were incurred over time as new areas were mined, and a portion of the liability is settled over time as areas are reclaimed prior to final pit reclamation. The timing of reclamation activities could vary and the decommissioning provisions could change depending on potential future changes in environmental regulations and cost estimates.

Westmoreland Coal Company became a privately held company on March 15, 2019. The company has not publicly reported 2018-2020 Genesee Mine production data.

Owners

SourceSource
CompanyInterestOwnership
Prairie Mines & Royalty ULC (PMRULC) (operator) 50 % Indirect
Westmoreland Mining LLC (WML) 50 % Indirect
Capital Power 50 % Indirect
The Genesse mine is a 50/50 joint venture between Capital Power and Prairie Mines & Royalty ULC, a subsidiary of Westmoreland (PMRU). PMRU is the operator.

Deposit type

  • Sedimentary

Summary:

There are up to six coal seams (layers) of coal at Genesee Mine located at varying depths. There are typically between 3 and 5 mineable coal seams ranging between 4 and 6 metres in combined thickness. The interburden (layer of dirt and sandstone) between the coal seams varies in thickness.

The coal at Genesee is “sub-bituminous” meaning it is low in sulphur and burns hotter than other varieties of coal which makes it ideal for electricity production.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits20222021202020192018201720162015
Coal (thermal) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe4.34.855.15.2
Heat ContentBTU/lb8,2688,2788,398
Sulfur%0.20.220.230.19
All production numbers are expressed as ROM coal.

Operational metrics

Metrics20222021202020192018201720162015
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe4.3 Mt4,770,438 t5,560 k tons5,627 k tons
Annual mining capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe6,600 k tons5,627 k tons5,745 k tons

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required May 6, 2025
....................... Subscription required ....................... Subscription required Subscription required May 6, 2025

Workforce

EmployeesYear
...... Subscription required 2020
...... Subscription required 2019
...... Subscription required 2018
...... Subscription required 2017
...... Subscription required 2015

Aerial view:

Lock

- subscription is required.