Mining Intelligence and News
Indonesia

Batulicin - Sarongga Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Coal (thermal)
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotThe Batulicin-Sarongga mine produces low calorie sub bituminous coal.

Batulicin Site holds a large amount of coal resource and reserves. Its operational area that is spread out results in diverse coal quality, from lignite to bituminous. The characteristic of the coal is classified as young coal with low calories and high HGI, which both become a challenge for the Batulicin Site. This challenge is responded by implementing the basis of good mining technical principles and implementation of conservation in all aspects of mining. The short hauling distance makes the Batulicin Site own an economical value even though it produces low-calorie coal.

Owners

SourceSource
CompanyInterestOwnership
PT Bumi Resources Tbk. 70 % Indirect
PT Arutmin Indonesia (operator) 100 % Direct

Deposit type

  • Sedimentary

Summary:

Batulicin mine consists of Ata, Mereh, Saring, Mangkalapi and Sarongga deposits. Ata coal is characterized by low ash, high sulphur, high CV, while the coal from Mereh and Saring coal is characterized by high ash, low sulphur, and medium CV. Mereh coal is crushed and, apart from a small portion, washed to lower the ash content and heighten marketability. Sarongga coal is characterized by low ash, low sulphur and low CV.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits20232022202120202019201820172016
Coal (thermal) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe45.45.55.9
Sulfur%1.4
All production numbers are expressed as ROM coal.

Operational metrics

Metrics20232022202120202019201820172016
Coal tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe4 Mt5.5 Mt5.5 Mt5.9 Mt
Stripping / waste ratio  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2.1 bcm/t2.6 bcm/t2.3 bcm/t1 bcm/t
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe8.2 Mbcm14.1 Mbcm12.6 Mbcm5.8 Mbcm

Production Costs

Commodity production costs have not been reported.

Heavy Mobile Equipment

Fleet data has not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Jul 26, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 26, 2024

Aerial view:

Lock

- subscription is required.