Mining Intelligence and News
South Africa

Klipspruit Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit & Underground
StatusActive
Commodities
  • Coal (thermal)
Mining Method
  • Dragline
  • Truck & Shovel / Loader
  • Bord-and-pillar
  • Continuous
Production Start... Lock
Mine Life... Lock
SnapshotThe Klipspruit mine is a part of the Seriti Power (SAEC) Operation.

Klipspruit Colliery (KPS) operation consists of three mining areas:
• KPS Main Pit which includes the Main Pit, Smaldeel and Bankfontein Pits;
• “KPSX” or Klipspruit Extension Weltevreden including Pit BD, Pit H, Pit G and Pit S; and
• “KPSS” or Klipspruit South which includes the KPSS East of the Thungela conveyor and the KPSS West of the Thungela conveyor.

The KPSX mining of Pit BD was amended from OC to UG in October 2022.

KPS intends to apply for a change in mining method to the remainder of the KPSX and KPSS reserves from OC to UG (including all future mining areas of KPSX that fall outside of the Pit BD and inclusive of Pit H). This project has been termed and will for the purposes of this application be referred to as, the “Nwabu Project”.

Owners

SourceSource
CompanyInterestOwnership
Seriti Resources Holdings Proprietary Ltd. 90 % Indirect
Seriti Resources Holdings Proprietary Ltd. is a broad-based, 92.76% black-owned and controlled South African mining company co-owned by four anchor shareholders: Masimong Group, Thebe Investments, Zungu Investments (Zico) and Community Investment Holdings (CIH).

Seriti holds a 90% interest in Seriti Power (Pty) Ltd., while an Employee Trust and Community Trust each hold a 5% interest.

Seriti Power (Pty) Ltd. is the holder of a Mining Right for coal in respect of its Klipspruit Colliery operation.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

The topography of the Klipspruit area is generally flat to gently sloping, at a mean elevation of approximately 1,600 m. The area drains towards the north. The unconsolidated material that overlies the solid sediments consists of soil, sand, laterite and clay. The thickness of this unconsolidated overburden averages 6 m, but varies depending on the depth of weathering.

Exploration boreholes target the full coal-bearing sequence and terminate in Dwyka Tillite. The sedimentary strata comprises mainly white, fine- to coarse-grained sandstone layers with alternating shale and shaly sandstones with bioturbated layers in places. The No.2 and No.4L Seams are separated by sandy shales grading into medium-grained sandstone towards the top. Coarse grained, hard sandstone layers are present immediately above the No.4L Seam.

Coal seams preserved in the Klipspruit area include No.5, No.4U, No.4L, No.3, No.2 and No.1 Seams. As a result of the topographic surface sloping to the north, all of the coal seams except for No.2 and No.1 Seams have been affected by weathering. This is especially true of the No.5 Seam, which is almost totally lost to erosion north of the Ogies Dyke.

A dolerite dyke has been identified in the Bankfontein area, which has affected Coal Resources mainly in the No.4U Seam. This was the result of deep weathering adjacent to the dyke.

The Ogies Dyke is a well-known post-Karoo intrusive structure that extends for some 70 km in an east-west direction. It forms the southern boundary of the main Klipspruit opencast resource area, and separates it from the Klipspruit South resource area. The dyke varies in thickness from 40 m to 70 m and dips steeply to the south. It does not vertically displace the coal seams.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnits202320222020201720162015
Coal (thermal) Mt  ....  Subscribe  ....  Subscribe  ....  Subscribe6.57.37.8
All production numbers are expressed as clean coal. * Production numbers were reported as 'Average annual'

Operational metrics

Metrics2017
Annual production capacity 8 Mt of coal (thermal) clean coal

Production Costs

Commodity production costs have not been reported.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Feb 13, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 13, 2025
....................... Subscription required ....................... Subscription required Subscription required Feb 13, 2025

Workforce

EmployeesContractorsTotal WorkforceYear
...... Subscription required 2024
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required 2017

Aerial view:

Lock

- subscription is required.