Mining Intelligence and News
Spain

Riotinto Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Copper
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
Mine Life... Lock
SnapshotProyecto Riotinto consists of an operating open pit mine (Cerro Colorado), the Riotinto Processing Plant and the E-LIX plant. In addition, the development stage San Dionisio and San Antonio deposits are located adjacent to the Cerro Colorado pit.

On 21 July 2023 Atalaya received the resolution for the Integrated Environmental Authorisation of E-LIX plant to produce copper and zinc cathodes within the Riotinto Project, from ore concentrates obtained from the current process. Atalaya will begin operation on this plant in 2024.

Construction is nearing completion at the 50 MW solar plant at Riotinto. The Atalaya continues wind-speed testing and evaluation for the potential installation of wind turbines at Riotinto.

Owners

SourceSource
CompanyInterestOwnership
Atalaya Mining Plc. 100 % Indirect
Atalaya Riotionto Minera, S.L.U. (operator) 100 % Direct
The main operating subsidiary of Atalaya Mining Plc is the 100% owned Atalaya Riotinto Minera, S.L.U. which owns and operates Proyecto Riotinto.

Contractors

Lock

- subscription is required.

Deposit type

  • VMS
  • Breccia pipe / Stockwork

Summary:

Deposit Types
Rio Tinto is a Volcanogenic Massive Sulfide (VMS) deposit located in the IPB (Iberian Pyrite Belt), which forms part of the Hercynian orogenic belt.

Mineralization
In the Rio Tinto area, mineralization occurs in five separate zones along the anticline: San Dionisio, Cerro Colorado - Filón Sur - Filón Norte, and Planes-San Antonio. Mineralization is typical of the VMS deposits and occurs as three different types of mineralization: sulfide stockworks in the volcanic rocks, massive sulfide orebodies, generally, on top of the stockwork zones and/orintercalated with rocks of the transition series, and weathering products of the mentioned primary mineralization types which are represented by gossans and secondary enrichment zones. The latter are restricted to within 70 m of the surface (Palomero, 1990).

Sulfide Stockwork
The stockworks occur as irregular veins, fractures, and fissures filled with quartz and sulfides (pyrite, chalcopyrite, galena, sphalerite), magnetite, quartz, chlorite, calcite, and barite cutting the volcanic host rocks. The top of the stockwork marks the base of the massive sulfides. The veins become thicker towards the surface. Close to the massive sulfides, most stockworks are made up of veins with lesser amounts of strongly replaced volcanic rocks. The stockworks can extend up to 400 m downwards from the contact with the massive sulfides down to the basic volcanic unit.

There is a spatial zonation within the stockwork where three types of stockwork can be distinguished:
• Pyritic stockwork zones, also referred to as pyrite chimneys or pyrite feeder zones, consisting of intense pyrite mineralization and local chalcopyrite (e.g., Planes). Average sulfur content of this type of stockwork is 20%.
• The cupriferous stockwork (average 2% Cu content and 30% S). This is a vein-type mineralization with a high concentration of chalcopyrite and is usually adjacent to and parallel to the contact with the massive sulfides. This copper envelope is locally referred to as “cloritas” ( Botin & Singh, 1981). The “cloritas” stockwork is highly developed at the base of the San Dionisio massive sulfide body where veining is parallel to contact with the massive sulfides. It is also found below the Filón Sur and Filón Norte deposits.
• The lower stockwork zone consisting of a sericitic envelope restricted to the acid volcanic rocks contiguous to the “cloritas” cupriferous stockwork. Copper and sulfide contents are much lower than in the previously described stockwork types. The lower stockwork is the main mineralization of Cerro Colorado. Zone 2a described at the footwall of the “cloritas” of the Alfredo underground mine is also a stockwork of this type.

The Planes-San Antonio deposit has a poorly developed stockwork of reduced size compared with San Dionisio. A semi-massive pyrite zone without base metals is located at the base of the Planes deposit.

Massive Sulfide
Massive sulfide mineralization consists of lenses of massive pyrite overlaying the felsic volcanic and the stockworks, usually with greater lateral extent than the stockwork zones. The sulfide minerals are frequently recrystallized with relicts of primary textures within the pyrite.

The primary sulfide mineralization consists mostly of pyrite, with minor chalcopyrite, sphalerite, galena, tetrahedrite, and sulfosalts of Sb and As in intergranular spaces or in microfractures. Chalcopyrite is the dominant copper mineral and mostly occurs within small fracturesin the pyrite; on a lesser extent it occurs in isolation.

The massive sulfide deposits are present as dismembered lenses along the axis and the flanks of the anticline and are overlain by shales of the Culm series. Currently, massive sulfides remain only at San Dionisio and San Antonio. At Filón Sur, Filón Norte, and Planes the massive sulfides have almost entirely been removed by mining. In the core of the anticline at Cerro Colorado-Salomón open pit, it is believed that the deposits originally formed an almost continuouslens of massive sulfides of about 5 km long, 750 m wide, and 40 m thick, containing more than 500 million tonnes of sulfide mineralization.

The San Dionisio sulfide body is the largest deposit at Rio Tinto. It is a homogeneous pyritic body containing sphalerite and chalcopyrite with minor amounts of galena, arsenopyrite, and tetrahedrite. While the distribution of Pb-Zn is not regular, the copper content increases toward the contact with “cloritas”, and maximum copper grade isfound at the contact between the massive sulfides and “cloritas”. Thisfootwall contact is gradational to locally abrupt. The upper contact is usually sharp and mineralization in the hanging wall rocks is very rare. The San Dionisio deposit has been described in the literature as a stratiform massive sulfide orebody with a syncline shape derived from folding. An extensive study of the geology and the mineralogy of the San Dionisio sulfide body by R.A. Read in 1967 strongly indicates that the deposition of sulfides is a replacement of a favorable folded volcanic horizon.

San Dionisio Massive sulfides have been extensively mined at the Atalaya pit and the Alfredo underground mine up to the 26th floor, approximately down to 135 m elevation.

At the Planes-San Antonio deposit, the massive sulfides are planar and are represented by two orebodies. The first is the Planes deposit, which is overlying the pyrite stockwork and is completely mined out; and the second is the San Antonio deposit, which occurs outside the limits of the stockwork and isintercalated with pyroclastic volcanic rocks. The San Antonio deposit is a pyritic stratiform sheet, apparently formed as a chemical sediment on the sea floor (Williams, Stanton, & Rambaud, 1975). The San Antonio massive sulfide mineralization contains more than 40% S, is enriched in Cu, Pb, and Zn, and has a maximum thickness of 38 m. Laterally, the massive orebody splits in several bands separated by barren tuffs.

Gossan
Gossans and secondary mineralization have formed in places over the stockwork and sulfide mineralization. Leaching and oxidation of an important volume of sulfides in Cerro Colorado and minor amounts in the Atalaya open pit developed extensive gossans, which were mined for gold and silver. Gossans and supergene enrichment zones are characterized by the occurrence of secondary minerals goethite-limonite and chalcocite-covellite respectively.

Gossan has also been mined at Planes 50 m west of the Planes shaft (Williams, Stanton, & Rambaud, 1975). Gossans and secondary mineralization have been mined out and are no longer a significant resource.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityProductUnits202420232022202120202019201820172016
Copper Metal in concentrate t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe44,950 42,114 37,164 26,179 
Copper Payable metal t  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe42,93540,30635,50425,353
Copper Concentrate kt  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe195181166122
^ Guidance / Forecast.

Operational metrics

Metrics202420232022202120202019201820172016
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe10,366,903 t10.8 Mt9.3 Mt7.7 Mt
Waste  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe17.9 Mt17.7 Mt
Tonnes milled  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe10,453,116 t9.8 Mt8.8 Mt6.5 Mt
Annual milling capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe15 Mt9.5 Mt9.5 Mt9.5 Mt
Stripping / waste ratio  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe1.7 1.6 2.1 1.8
Total tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
^ Guidance / Forecast.

Production Costs

CommodityUnits20242023202220212020201920182017
Credits (by-product) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe
Cash costs Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 1.8 / lb **   1.94 / lb **   1.91 / lb **  
All-in sustaining costs (AISC) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 2.14 / lb **   2.26 / lb **   2.3 / lb **  
^ Guidance / Forecast.
** Net of By-Product.

Financials

Units2023202220212020201920182017
Sustaining costs M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 9.8   8   7.4  
Revenue M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 187.9   189.5   160.5  
Operating Income M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 36.5   40   24.7  
Gross profit M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 49.5   47.3   29.2  
Pre-tax Income M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 36.9   41.5   21.9  
After-tax Income M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 30.7   34.4   18.2  
EBITDA M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 61.3   53.5   41.3  
Operating Cash Flow M EUR  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 37.9   55.3   30.5  

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNamePhoneEmailProfileRef. Date
....................... Subscription required ....................... Subscription required ........... Subscription required ........... Subscription required Subscription required Sep 16, 2022
....................... Subscription required ....................... Subscription required Subscription required Jul 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 27, 2024
....................... Subscription required ....................... Subscription required Subscription required Jul 30, 2024

EmployeesContractorsTotal WorkforceYear
...... Subscription required ...... Subscription required ...... Subscription required 2023
...... Subscription required ...... Subscription required ...... Subscription required 2022
...... Subscription required ...... Subscription required ...... Subscription required 2021
...... Subscription required ...... Subscription required ...... Subscription required 2020
...... Subscription required ...... Subscription required ...... Subscription required 2019
...... Subscription required ...... Subscription required ...... Subscription required 2018

Aerial view:

Lock

- subscription is required.