Thunderbird Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusActive
Commodities
  • Zircon
  • Ilmenite
  • Heavy Minerals
  • Leucoxene
Mining Method
  • Truck & Shovel / Loader
  • Dry mining
Production Start... Lock
Mine Life... Lock
SnapshotThunderbird is one of the largest and highest-grade zircon mineral sands deposits in the world and contains valuable heavy minerals including ilmenite, zircon, and leucoxene which are extracted and exported via the Port of Broome to our global offtake partners.

Construction activities at Thunderbird were completed during the 2024 financial year in line with schedule and budget. First ore production occurred ahead of schedule in October 2023. The maiden shipment of Thunderbird products to customers was completed in January 2024, with the first bulk shipment departing Broome in March 2024 completing the transition of Sheffield Resources into a mineral sands producer.

Owners

SourceSource
CompanyInterestOwnership
Sheffield Resources Ltd. 50 % Indirect
YGH Australia Investment Pty Ltd. 50 % Indirect
Kimberley Mineral Sands Joint Venture (KMSJV) is a 50/50 joint venture between Sheffield Resources Limited (Sheffield) and YGH Australia Investment Pty Ltd (Yansteel), formed to develop the Thunderbird Mineral Sands Project.

Contractors

Lock

- subscription is required.

Deposit type

  • Mineral sands

Summary:

Thunderbird is the first significant mineral sand deposit to be discovered in the Phanerozoic Canning Basin, and is one of the largest and highest grade mineral sands deposits globally, including those currently in production. The Thunderbird deposit formed during an Early Cretaceous marine regression and is hosted by highly weathered Broome Sandstone.

Mineralisation occurs as a thick, broad sheet like body striking northwest, extending from surface to a maximum known depth of 155m over an area at least 11km by 7km. These extents have not been closed off with mineralisation remaining open to the north, south and west. The average depth to top of the main body of mineralisation is 24m and the average mineralised thickness 45m. The deposit is flatlying along the north-eastern flank, but with a dip steepening to 4°along the south-western flank.

Enclosed within the Thunderbird formation is a continuous, very-high grade heavy minerals (>7.5%) zone named the “GT Zone”. This zone is up to 43m thick (average 15m) over an area at least 9km by 7km, strikes approximately north-south, follows the dip of the Thunderbird formation and is open along strike to the south and north.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

CommodityUnits2024
Zircon kt  ....  Subscribe
Ilmenite kt  ....  Subscribe
Leucoxene kt  ....  Subscribe
Titanium dioxide kt
All production numbers are expressed as concentrate.

Operational metrics

Metrics2024
Ore tonnes mined  ....  Subscribe
Waste  ....  Subscribe
Tonnes processed  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Financials

Units2024
Revenue M AUD  ....  Subscribe
Pre-tax Income M AUD  ....  Subscribe
After-tax Income M AUD  ....  Subscribe
Operating Cash Flow M AUD  ....  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Dec 6, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 6, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 6, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 6, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 6, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 6, 2024

Total WorkforceYear
...... Subscription required 2024

Aerial view:

Lock

- subscription is required.