Mining Intelligence and News
United States

Goldrush Project

Click for more information

Categories

Summary

Mine TypeUnderground
Study CompletedFeasibility
StageConstruction
Commodities
  • Gold
Mining Method
  • Longhole open stoping
  • Longitudinal open stoping
  • Transverse open stoping
Backfill type ... Lock
Project Timeline... Lock
Mine Life... Lock
SnapshotGoldrush Project, at Cortez, is expected to be a long-life underground mine.

On December 11, 2023, the US Bureau of Land Management has issued a Record of Decision (“ROD”) approving Nevada Gold Mines’ (“NGM”) plan of operations for its new Goldrush underground mine at the Cortez Complex.

On April 25, 2024, Barrick Gold Corporation ("Barrick") announced the official opening of the Goldrush underground mine in the Cortez Complex.

During 2024, underground development, bulk sampling, test mining, and other exploration continued at Goldrush. Major development fronts included developing levels out to the south and advancing the Red Hill ramp and continuing upper level drill platforms. Activities in 2025 will focus on verifying geological, geotechnical and hydrogeological models developed during the feasibility study.

Owners

SourceSource
CompanyInterestOwnership
Newmont Corp. 38.5 % Indirect
Barrick Gold Corp. (operator) 61.5 % Indirect
Starting in the first quarter of 2021, Goldrush is reported as part of Cortez as it is operated by Cortez management.

Barrick is the operator of the joint venture and owns 61.5%, with Newmont owning the remaining 38.5% of the joint venture.

Contractors

Lock

- subscription is required.

Deposit type

  • Sediment-hosted
  • Carlin-type

Summary:

Goldrush deposit is part of the Cortez deposits, which are Carlin-type sedimentary rock-hosted deposits.

Exploration reveals that the deposit has a maximum thickness of 76 m, a width of about 425 m, and extends along strike for approximately 5,275 m. The deepest significant intercept is currently at 1,435 masl. The Goldrush system remains open to the north into Fourmile, to the southeast, and in multiple directions in the Ken Balleweg (KB) Domain.

Exploration to date shows that mineralization at Goldrush is primarily stratigraphically controlled, occurring within subunit 5 of the middle Wenban Formation and to a lesser extent along the contact between the Horse Canyon and Wenban formations.

Mineralization is associated with low-angle thrust faults and their related hanging wall antiforms that typically concentrate gold along fold hinges and/or east-dipping limbs. Gold occurs within extensive zones of decarbonatization and silicification within the Devonian rocks.

The system is marked by a large stratiform silicified and sulfidized breccia horizon from 15– 70 m thick that extends more than 7,000 m on a north–northwesterly strike.

Goldrush deposit length is 17,300 ft, deposit width is 1,400 ft, and deposit thicknesses range from 10-350 ft.

Mineralization
The main gold-bearing mineral is micrometre-sized arsenian pyrite that occurs as individual grains or as rims on pre-existing pyrite. Mineralization is primarily double-refractory and highly preg-robbing with both sulfides and active carbon present in the orebody. Mineralization exhibits low Ag:Au ratios with enrichment in arsenic, antimony, mercury, and thallium, and low base metal contents.

Seven mineralized domains are defined, from north to south, Crow’s Nest, Red Hill, KB North, KB South, 3½, Ranch, and Meadow.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Required Heavy Mobile Equipment

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Commodity Production

CommodityUnitsAvg. Annual
Gold oz 400,000
All production numbers are expressed as metal in doré.

Operational metrics

Metrics
Daily ore mining rate  ....  Subscribe
Daily waste mining rate  ....  Subscribe
Annual ore mining rate  ....  Subscribe
Annual processing rate  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
* According to 2023 study.

Production Costs

Commodity production costs have not been reported.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required May 5, 2025
....................... Subscription required ....................... Subscription required Subscription required May 5, 2025
....................... Subscription required ....................... Subscription required Subscription required May 5, 2025
....................... Subscription required ....................... Subscription required Subscription required May 5, 2025

Workforce

Total WorkforceYear
...... Subscription required 2024

Aerial view:

Lock

- subscription is required.