Thacker Pass Project

Click for more information

Categories

Overview

Mine TypeOpen Pit
StageConstruction
Commodities
  • Lithium
Mining Method
  • Truck & Shovel / Loader
Project Timeline... Lock
Mine Life... Lock
SnapshotThacker Pass is now the largest measured lithium reserve and resource in the world and has the potential to become an unmatched district, generating American jobs and helping the U.S. regain independence of its energy supply.

Construction of Thacker Pass to reach total nominal design capacity of 160,000 t/y of LiCO is planned over five phases. Each of Phases 1 through 4 are expected to be spaced 4 years apart with Phase 5 beginning at the same time as Phase 4. Construction of Phases 2 through 5 is expected to occur over a 13-year period, from the start of Phase 1 rst production. The lithium carbonate production plants for Phase 1 through 4 is expected to have excess capacity that would take brine feed from Phase 5 to maintain their nominal production capacity of 40,000 t/y. Additional required permitting for Phases 2 through 5 will be initiated following the completion of Phase 1 construction.

Construction of Phase 1 commenced in early 2023.
Latest NewsLithium Americas Increases Mineral Resource and Reserve for Thacker Pass     January 7, 2025

Owners

SourceSource
CompanyInterestOwnership
General Motors Holdings LLC 38 % Indirect
Lithium Americas Corp. 62 % Indirect
The Project is indirectly owned by Lithium Nevada Ventures LLC (LN). LN is a joint venture between the Lithium Americas Corp., which has a 62% ownership, and General Motors Holdings LLC, which has a 38% ownership.

Lithium Americas is the manager of the Project.

Contractors

Lock

- subscription is required.

Deposit type

  • Sedimentary

Summary:

Deposit Types
Lithium enrichment (greater than 1,000 ppm) in the Thacker Pass deposit and deposits of the Montana Mountains occur throughout the caldera lake sedimentary sequence above the intra-caldera Tuff of Long Ridge. The exact cause for the lithium enrichment in the caldera lake sediments is still up for debate. The presence of sedimentary carbonate minerals and magnesium-smectite (hectorite) throughout the lake indicates that the clays formed in a basic, alkaline, closed hydrologic system.

It is likely that two primary mechanisms play a role in the genesis of the Thacker Pass deposit: (1) neoformation of smectite in a closed lake, rich in lithium due to the leaching of nearby and underlying volcanic glass (Benson et al., 2017b); and (2) alteration of a portion of the smectite-bearing clays to illite during intracaldera hydrothermal alteration associated with the uplift of the Montana Mountains.

Caldera lake sediments of the McDermitt Caldera contain elevated lithium concentrations compared to other sedimentary basins. Exploration results support the proposed model and have advanced the understanding of the geology of the Thacker Pass deposit.

Geology
The Project is located within an extinct 40x30 km supervolcano named McDermitt Caldera, which was formed approximately 16.3 million years ago (Ma) as part of a hotspot currently underneath the Yellowstone Plateau. Following an initial eruption and concurrent collapse of the McDermitt Caldera, a large lake formed in the caldera basin. This lake water was extremely enriched in lithium and resulted in the accumulation of lithium-rich clays.

Late volcanic activity uplifted the caldera, draining the lake and bringing the lithium-rich moat sediments to the surface resulting in the near-surface lithium deposit which is the subject of the Project.

The Thacker Pass deposit sits sub-horizontally beneath a thin alluvial cover and is partially exposed at the surface. The sedimentary section consists of alternating layers of claystone and volcanic ash. Basaltic lavas occur intermittently within the sedimentary sequence. The moat sedimentary section at the Project site overlies the indurated intra-caldera Tuff of Long Ridge. A zone of silicified sedimentary rock, the Hot Pond Zone (HPZ), occurs at the base of the sedimentary section above the Tuff of Long Ridge.

Clay in the Thacker Pass deposit includes two distinct types of clay mineral, smectite and illite. Smectite clay occurs at relatively shallow depths in the deposit and contain roughly 2,000 – 4,000 parts per million (ppm) lithium. Higher lithium contents (commonly 4,000 ppm lithium or greater) are typical for illite clay which occurs at relatively moderate to deep depths and contain values approaching 9,000 ppm lithium in terms of whole-rock assay.

Mineralization
The Thacker Pass deposit sits sub-horizontally beneath a thin alluvial cover at Thacker Pass and is partially exposed at the surface. The Thacker Pass deposit is the target of a multi-phase mining development as the Thacker Pass Project. It lies at relatively low elevations (between 1,500 m and 1,300 m) in caldera lake sediments that have been separated from the topographically higher deposits to the north due to post-caldera resurgence and Basin and Range normal faulting. Exposures of the sedimentary rocks at Thacker Pass are limited to a few drainages and isolated road cuts. Therefore, the stratigraphic sequence in the Thacker Pass deposit is primarily derived from core drilling.

The sedimentary section, which has a maximum drilled thickness of about 160 m, consists of alternating layers of claystone and volcanic ash. Basaltic lavas occur intermittently within the sedimentary sequence. The claystone comprises 40% to 90% of the section. In many intervals, the claystone and ash are intimately intermixed. The claystones are variably brown, tan, gray, bluish-gray and black, whereas the ash is generally white or very light gray. Individual claystone-rich units may laterally reach distances of more than 152 m, though unit thickness can vary by as much as 20%. Ash-rich layers are more variable and appear to have some textures that suggest reworking. All units exhibit finely graded bedding and laminar textures that imply a shallow lacustrine (lake) depositional environment.

Surficial oxidation persists to depths of 15 m to 30 m in the moat sedimentary rock. Oxidized claystone is brown, tan, or light greenish-tan and contains iron oxide, whereas ash is white with some orange- brown iron oxide. The transition from oxidized to unoxidized rock occurs over intervals as much as 4.5 m thick.

The moat sedimentary section at Thacker Pass overlies the hard, dense, indurated intra-caldera Tuff of Long Ridge. A zone of weakly to strongly silicified sedimentary rock, the Hot Pond Zone (HPZ), occurs at the base of the sedimentary section above the Tuff of Long Ridge in most of the cores retrieved from the Thacker Pass deposit. Both the HPZ and the underlying Tuff of Long Ridge are generally oxidized.

Most of the moat sedimentary rocks drilled in the Thacker Pass basin contain high levels of lithium (>1,000 ppm). Intervals that consist mostly of ash or volcanic rock have lithium contents of less than 800 ppm whereas intervals dominated by claystone contain more lithium (>1,000 ppm). Many intervals have very high lithium contents (>4,000 ppm). Intervals with extreme lithium contents (>8,000 ppm) occur sporadically in the Thacker Pass deposit.

There is no obvious change in lithium content across the boundary between oxidized and unoxidized rock. The highest lithium grades generally occur in the middle and lower parts of the sedimentary rock section, or in sections where these rocks have been uplifted to surface.

The lithium content of the Thacker Pass deposit claystone can generally be correlated to the color and texture of the rock, as well as the amount of mixed-in ash. Intervals with the highest lithium grades (>4,000 ppm) generally contain gray to dark-gray or black claystone with less than 10% ash. Intervals of bluish-gray claystone with low ash content have moderate lithium content (generally 2,500 ppm to 3,000 ppm). Intervals of light-colored claystone (e.g., tan, light gray, greenish-tan) have lower lithium grades (generally 1,500 ppm to 2,500 ppm). Intervals of mixed claystone and ash are common and have variable lithium contents (generally 1,500 ppm to 3,000 ppm) depending on the type of claystone and proportion of ash present.

Mineralogy
Clay in the Thacker Pass deposit includes two distinctly different mineral types, smectite and illite, based on chemistry and X-ray diffraction (XRD) spectra. Smectite drill intervals contain roughly 2,000 – 4,000 ppm Li. The chemistry and structure of the smectite at McDermitt is most similar to hectorite, a subtype of smectite (Na0,3(Mg,Li)3Si4O10(OH)2), though chemically the clay is intermediate between hectorite and two other smectites, stevensite and saponite (Morissette, 2012). Supported hectorite clay occurs elsewhere in the McDermitt Caldera and has been documented by several authors (e.g., Odom, 1992; Rytuba and Glanzman, 1978; Morissette, 2012; Castor and Henry, 2020).

Drill intervals with higher lithium contents (commonly 4,000 ppm Li or greater) contain clay typical for illite (Morissette, 2012; Castor and Henry, 2020). This illite clay occurs at relative moderate to deep depths in the moat sedimentary section and sporadically occurs in intervals that contain values approaching 9,000 ppm lithium in terms of a whole-rock assay, higher than what a hectorite crystal can accommodate. The Li-rich illite is similar in character to tainiolite, a subtype of illite (K2[Mg4Li2]Si8O20(OH,F)4) (Morissette, 2012; Castor and Henry, 2020).

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

CommodityUnitsAvg. AnnualLOM
Lithium t 135,13211,486,261
All production numbers are expressed as carbonate.

Operational metrics

Metrics
Annual ore mining rate  ....  Subscribe
Annual mining rate  ....  Subscribe
Annual production capacity  ....  Subscribe
Stripping / waste ratio  ....  Subscribe
Waste tonnes, LOM  ....  Subscribe
Ore tonnes mined, LOM  ....  Subscribe
Total tonnes mined, LOM  ....  Subscribe
Tonnes processed, LOM  ....  Subscribe
* According to 2024 study.

Production Costs

CommodityUnitsAverage
Cash costs Li2CO3 USD  ....  Subscribe
Total cash costs Li2CO3 USD  ....  Subscribe
Assumed price Li2CO3 USD  ....  Subscribe
* According to 2024 study / presentation.

Operating Costs

CurrencyAverage
OP mining costs ($/t mined) USD  ....  Subscribe
* According to 2024 study.

Project Costs

MetricsUnitsLOM Total
Initial CapEx $M USD  ......  Subscribe
Working capital $M USD  ......  Subscribe
Sustaining CapEx $M USD  ......  Subscribe
Closure costs $M USD  ......  Subscribe
Total CapEx $M USD  ......  Subscribe
OP OpEx $M USD  ......  Subscribe
G&A costs $M USD 3,746
Total OpEx $M USD  ......  Subscribe
Total Taxes $M USD  ......  Subscribe
Royalty payments $M USD  ......  Subscribe
Net revenue (LOM) $M USD  ......  Subscribe
EBITDA (LOM) $M USD  ......  Subscribe
Net Income (LOM) $M USD  ......  Subscribe
Pre-tax Cash Flow (LOM) $M USD  ......  Subscribe
After-tax Cash Flow (LOM) $M USD  ......  Subscribe
Pre-tax NPV @ 10% $M USD  ......  Subscribe
Pre-tax NPV @ 8% $M USD  ......  Subscribe
After-tax NPV @ 10% $M USD  ......  Subscribe
After-tax NPV @ 8% $M USD  ......  Subscribe
Pre-tax IRR, %  ......  Subscribe
After-tax IRR, %  ......  Subscribe
After-tax payback period, years  ......  Subscribe

Required Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Dec 31, 2024
....................... Subscription required ....................... Subscription required Subscription required Dec 31, 2024
....................... Subscription required ....................... Subscription required Subscription required Jan 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 19, 2025
....................... Subscription required ....................... Subscription required Subscription required Jan 19, 2025

EmployeesYear
...... Subscription required 2024

Aerial view:

Lock

- subscription is required.