Mining Intelligence and News
Australia

Broadmeadow East Mine

Click for more information

Categories

Overview

Mine TypeOpen Pit
StatusCare and Maintenance
Commodities
  • Coal (thermal)
  • Coal (coking)
Mining Method
  • Truck & Shovel / Loader
  • Auger
  • Highwall
Production Start... Lock
SnapshotBroadmeadow East is a part of the Burton Complex.

Coal production started in July 2022 and was initially processed through neighbouring mine Carborough Downs CHPP under a coal washing and infrastructure sharing arrangement with Fitzroy Australia. Processing transitioned through the nearby Burton CHPP, post-refurbishment.

Opencut mining paused at Broadmeadow East in May 2024 due to the close proximity (300m standoff) to a powerline traversing the Mine.

The decision to pause the Broadmeadow East Mine followed a detailed strategic review by the Company of its portfolio which included a strict capital allocation assessment. Due to an uneconomic sum of capital expenditure required to move the powerline currently traversing the mining lease, the asset was placed in care and maintenance in May 2024. Bowen Coking Coal retains optionality to return to Broadmeadow East on a reasonably quick restart basis should an economic solution for the powerline infrastructure relocation be secured

Owners

SourceSource
CompanyInterestOwnership
Formosa Plastics Group 10 % Indirect
Bowen Coking Coal Ltd 90 % Indirect
Broadmeadow East mine was 100% owned by Bowen Coking Coal as at 30 June 2024. On 5 July 2024, MPC Lenton Pty Ltd, a wholly owned subsidiary of the Formosa Plastics Group, acquired a 10% interest in the Broadmeadow East mine, as announced by BCB on 8 July 2024.

Deposit type

  • Sedimentary

Summary:

At Broadmeadow East, the only economic seams occur in the Rangal Coal Measures which overlie the Fort Cooper Coal Measures. The Rangal Coal Measures are approximately 90m thick and contain five seams in descending order: the Burton Rider seam, the Leichhardt seam, the Upper Vermont seam, the Middle Vermont seam and the Lower Vermont seam. Only the Leichhardt seam is currently determined to be commercially viable in the Broadmeadow East area. The seams all crop in an elongated strip, broadly striking north northwest. The Rangal Coal Measures comprise interbedded fine to medium grained lithic sandstone, siltstone, mudstone and coal.

The Project area lies within the Permo-Triassic Bowen Basin. Coal seams occur within the Rangal Coal Measures and underlying Fort Cooper Coal Measures which are Late Permian in age. Coal seams in the Broadmeadow East deposit dip to the North-West, West at approximately 8 - 10 degrees. The target seam is the Leichhardt seam in the Rangal Coal Measures, which are extensively mined in the area. The drill hole density (core and chip) in the deposit allow for a good level of confidence in seam splitting, seam thickness, coal quality and location of sub-crop lines.

The Broadmeadow East ML deposit area occurs within a structurally complex zone on the eastern side of the Collinsville Shelf in the north Bowen Basin. The deposit is located on the eastern upthrown side of the Burton Range Fault, a regional scale meridional midTriassic thrust fault which lies to the west of the Broadmeadow mining leases and trends in a north-northwesterly direction.

The economic coal seams in the north Bowen Basin lie within the Permian Blackwater and Back Creek Group. The Blackwater Group comprises two late Permian coal-bearing sequences; the Fort Cooper Coal Measures and the Rangal Coal Measures, while the Back Creek Group contains the Moranbah Coal Measures. The economic Burton Coal Project deposits occur within the Rangal Coal Measures.

The Rangal Coal Measures contain the only economic coal seams in the Broadmeadow East ML area of which only the Leichhardt seam (BL), with an average thickness of between 3.5 and 4.2m is considered potentially commercial.

The coal resources are in the west limited by the subcrop, otherwise resources exist over the entire ML70257. The strike length is approximately 2,800m.

Depth of the BL seam at the subcrop is approximately 20m (Base of Weathering) and increases to approximately 300m in the north-east of the ML.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Milling equipment has not been reported.

Processing

Lock

- subscription is required.

Production

Broadmeadow East was placed in care and maintenance in May 2024.
CommodityUnits20242023
Coal (metallurgical & thermal) Mt  ....  Subscribe  ....  Subscribe
All production numbers are expressed as clean coal.

Operational metrics

Metrics20242023
Coal tonnes mined  ....  Subscribe  ....  Subscribe
Stripping / waste ratio  ....  Subscribe  ....  Subscribe

Production Costs

Commodity production costs have not been reported.

Financials

Units2024
Revenue M AUD  ....  Subscribe
EBITDA M AUD  ....  Subscribe

Heavy Mobile Equipment

Lock

- subscription is required.

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Nov 6, 2024
....................... Subscription required ....................... Subscription required Subscription required Nov 6, 2024

Aerial view:

Lock