• Data Access
  • Your Email  
  • Your Email  
Keep me signed in.
Forgot your password?
Close
  • Forgot Your Password?
  • Enter the email you signed up with and we'll email it to you.
  • Your Email  
Close
Back
MDO
Mining Data Solutions
  • Home
  • Database
  • Subscribe
  • Sign In
  • Sign In
South Africa
Elikhulu TRP Mine (Evander Operation)

This page is not tailored to
devices with screen width under 750 px.
 Location:
37 W from Bethal, South Africa

  Address:
Private Bag X1012
Evander
South Africa
2280
Phone  ...  Subscription required
Fax+ 27-17-632-4046
WebsiteWeb
Additional Resources for Suppliers & Investors
Drill results over 30 g/t Au
Stay on top of recent discoveries.
Search drill results by commodity and grade.
Largest mines in the Americas
Mining and mill throughput capaciites.
Full profiles of select mines and projects.
Deepest underground mines
Shaft depth and mill throughput data.
Full profiles of select mines and projects.
Heavy mobile equipment
HME type, model, size and quantity.
Full profiles of select mines and projects.
Permitting and construction projects
Projects at the permitting or construction stage. Full profiles of select projects.
Mines with remote camps
Camp size, mine location and contacts.
Full profiles of select mines and projects.
Mines & projects in South Africa
A list of country's mines and projects.
Full profiles of select mines and projects.
  • Overview
  • Owners
  • Geology
  • Mining
  • Processing
  • Production
  • Reserves
  • Costs & Financials
  • Personnel
  • Filings & News

Thank you for browsing through mine profiles compiled by the Mining Data Online team.

Would you like to subcribe or schedule a Demo?
  • Name:
     
  • Company:
     
  • Position:
     
  • Phone:
  • Email:
  • Message:

Overview

StageProduction
Mine TypeTailings
Commodities
  • Gold
Mining Method
  • Hydraulic mining
Production Start...
Mine Life11 years (as of Jan 1, 2022)
The ore being treated at Elikhulu originated from the previously mined and metallurgically treated Kimberley Reef from the Winkelhaak, Leslie/Bracken and Kinross Mines as part of Evander Mines’ historical operations. The tailings of the treated material were deposited onto three TSFs that will be reclaimed in the following order: Kinross, Leslie/Bracken and Winkelhaak. Post their processing, these TSFs will be consolidated into a modern, single, enlarged regional Kinross tailings extension facility, thus reducing Evander Mines’ environmental footprint and associated environmental impact.


Owners

Source:
CompanyInterestOwnership
Employee Share Ownership Plan (the ‘ESOP’) 5 % Indirect
Pan African Resources plc 95 % Indirect

Contractors

Subscription required - Subscription is required.


Deposit Type

  • Tailings


Summary:

The ore being treated at Elikhulu originated from the previously mined and metallurgically treated Kimberley Reef from the Winkelhaak, Leslie/Bracken and Kinross Mines as part of Evander Mines’ historical operations. The tailings of the treated material were deposited onto three TSFs that will be reclaimed in the following order: Kinross, Leslie/Bracken and Winkelhaak. Post their processing, these TSFs will be consolidated into a modern, single, enlarged regional Kinross tailings extension facility, thus reducing Evander Mines’ environmental footprint and associated environmental impact. Deposition material of historically treated metallurgical tailings from the Winkelhaak, Leslie/Bracken and Kinross Mines. The material is confined to the deposition site of historical tailings and approximately 1m beneath the historical footprint. The ore consists of oxidised tailings containing pyrite-associated gold which was not recovered in the initial treatment process.


Mining Methods

  • Hydraulic mining


Summary:

Elikhulu is a surface re-mining site with road access from all surface material sources to the plant. Ore is pumped (hydraulic re-mining) to the Elikhulu plant in slurry form.

Elikhulu is expected to yield approximately 60Koz of gold per annum for the initial six years of production (while treating the Kinross and Leslie/Bracken TSFs). Thereafter, while processing the Winkelhaak TSF, production is expected to be approximately 45Koz per annum for the plant’s remaining six years. These production estimates exclude an Inferred Resource of 102Koz of gold delineated in the soil material beneath the existing tailings dumps.

During the 2022 year, earthworks commenced on the pumping station in preparation of remining the Leslie/Bracken TSF. The pump station is planned to be commissioned during the second quarter of the 2023 financial year. This pump station will allow for slurry from the Leslie/Bracken TSF to be moved to the Elikhulu plant at a rate of approximately 1.2mtpm. Mining of the Leslie/Bracken TSF will continue for the following five years of the modelled life of the Elikhulu operation. From here, remining will move to the Winkelhaak TSF for the remaining six years.


Crushing and Grinding


Processing

Flow Sheet: Subscription required

Summary:

- subscription is required.


Production:

CommodityUnits2022202120202019
Gold oz  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
All production numbers are expressed as metal in doré.
Subscription required - Subscription is required.

Operational Metrics:

Metrics2022202120202019
Ore tonnes mined  ......  Subscription required  ......  Subscription required  ......  Subscription required11,767,018 t
Annual production capacity  ......  Subscription required  ......  Subscription required  ......  Subscription required75 koz of gold metal in doré
Tonnes processed  ......  Subscription required  ......  Subscription required  ......  Subscription required10,848,209 t
Annual processing capacity  ......  Subscription required  ......  Subscription required  ......  Subscription required14,400,000 t
Subscription required - Subscription is required.

Reserves at June 30, 2022:
Mineral Reserves Paylimit values are calculated at 0.2g/t, applying a gold price of US$1,706/oz.
Mineral Resources Paylimit values are calculated at 0.1g/t Au, applying a gold price of US$1,906/oz.

CategoryTonnage CommodityGradeContained Metal
Proven 48.91 Mt Gold 0.31 g/t 0.49 M oz
Probable 110.36 Mt Gold 0.27 g/t 0.95 M oz
Proven & Probable 159.27 Mt Gold 0.28 g/t 1.44 M oz
Measured 52.16 Mt Gold 0.31 g/t 0.52 M oz
Indicated 106.38 Mt Gold 0.27 g/t 0.92 M oz
Measured & Indicated 158.53 Mt Gold 0.28 g/t 1.44 M oz
Inferred 8.73 Mt Gold 0.27 g/t 0.07 M oz
Total Resource 167.26 Mt Gold 0.28 g/t 1.52 M oz

Commodity Production Costs:

CommodityUnits2022202120202019
Cash costs (sold) Gold USD  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
All-in sustaining costs (AISC) Gold USD  ......  Subscription required†  ......  Subscription required†  ......  Subscription required†  ......  Subscription required†
All-in costs Gold USD  ......  Subscription required†  ......  Subscription required†  ......  Subscription required†  ......  Subscription required†
† Net of By-Product.
Subscription required - Subscription is required.

Operating Costs:

Units2022202120202019
Total operating costs ($/t milled) ZAR 51454033

Financials:

Units2022202120202019
Capital expenditures M ZAR  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
Revenue M ZAR  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
EBITDA M ZAR  ......  Subscription required  ......  Subscription required  ......  Subscription required  ......  Subscription required
Subscription required - Subscription is required



Heavy Mobile Equipment:

Mine Management:

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Oct 4, 2022
Subscription required - Subscription is required.

Staff:

EmployeesContractorsTotal WorkforceYear
Subscription required Subscription required Subscription required 2022
Subscription required Subscription required Subscription required 2021
Subscription required Subscription required Subscription required 2020
Subscription required Subscription required Subscription required 2019
Subscription required Subscription required Subscription required 2018

Corporate Filings & Presentations:

DocumentYear
Integrated Report 2022
Year-end Mineral Reserves 2022
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2021
................................... Subscription required 2020
................................... Subscription required 2020
................................... Subscription required 2019
................................... Subscription required 2019
................................... Subscription required 2019
Annual Report 2018
Year-end Mineral Reserves 2018
Corporate Presentation 2016
Subscription required - Subscription is required.

Subscription required - Subscription is required.

Terms of Use Privacy Policy © 2017-2023 MDO Data Online Inc.