Mine TypeOpen Pit & Underground
StatusActive
Commodities
  • Copper
  • Gold
  • Silver
  • Molybdenum
  • Lead
  • Zinc
Mining Method
  • Truck & Shovel / Loader
  • Room-and-pillar
  • Cut & Fill
  • Sub-level open stoping (SLOS)
Backfill type ... Lock
Production Start... Lock
Mine Life... Lock
SnapshotThe Jiama project is one of the largest copper gold polymetallic mines in China.

The decrease in production and profit was mainly attributed to the suspension of operations of the Jiama Mine following the overflow at the Guolanggou tailings pond on March 27, 2023. Operations began to gradually recommence as of December 15, 2023. The Phase II processing plant with a daily processing capacity of 34,000 tonnes resumed operations on May 30, 2024. The Phase I processing plant which had been in operation during the production ramp up phase ceased operations.

The China Gold International Resources is actively advancing the construction of the Phase III tailings dam, which is expected to be completed and put into operation in the first half of 2026.

Owners

SourceSource
CompanyInterestOwnership
China Gold International Resources Corp. 100 % Indirect
Tibet Huatailong Mining Development Co. Ltd. (operator) 100 % Direct
Jiama Copper-Polymetallic Mine is owned and operated by Tibet Huatailong Mining Development Co. Ltd., an indirect wholly-owned subsidiary of China Gold International Resources Corp. Ltd.

Contractors

Lock

- subscription is required.

Deposit type

  • Porphyry
  • Skarn

Summary:

The Jiama Project is located within the Gangdese Yanshanian epi-continental arc on the central southern portion of the Gangdese-Nianqing Tanggula Terrain. At the tenement scale, rock types are typically passive epi-continental clastics and carbonates. The stratigraphy is dominated by marbles and limestones of the Upper Jurassic Duodigou Formation and sandstones, slates and hornfels belonging to the Lower Cretaceous Linbuzong Formation. Although some mafic and intermediate to felsic dykes have been mapped in outcrop and drill core, the intrusive granitic body responsible for the wide spread contact metamorphism and copper-polymetallic mineralisation is yet to be identified. A number of thrust faults and shears concentrated between major geological contacts and a large detachment fault (Gliding Nappe Fault) have also been observed. Locally bedrock units are overlain by unconsolidated Quaternary colluvium and alluvium.

The Jiama deposit is a structurally controlled stratiform skarn-type copper-polymetallic system. The majority of high grade mineralisation is associated with shear zone contacts between the Duodigou and Linbuzong formations and shear related folding. The zone of mineralisation within fault hosted skarn alteration measures kilometres in both strike and dip and remains open at depth to the northeast.

Mineralisation is also associated with granite porphyry dykes intruding the ‘Duodigou Marble’ and observed within the overlying hornfels of the Linbuzong Formation.

Although both deposit types are of lower grade than that of the skarn, the hornfels style of mineralisation may potentially be of further economic value in the future.

Three types of copper-polymetallic mineralisation are recognised in the project area, these include skarn, hornfels and porphyry hosted deposits.

High grade copper-polymetallic mineralisation is associated with skarn type alteration within shear zone contacts between the Duodigou and Linbuzong formations. This stratiform fault zone is tabular to lenticular in shape, has a variable dip, strikes west-northwest and hosts the primary lode.

The mineralised body itself has a 60° near surface dip angle which flattens to an average dip of 10° with depth. Thicknesses vary between 2 m to 240 m, averaging 33 m, its strike length is approximately 2,400 m and its length down dip ranges between 150 to 1,900 m. It is primarily divided into two zones of mineralisation; the Niumatang Zone and the Jiama Zone. A number of smaller, lenticular shaped skarn-type mineralised bodies have also been identified below and to the southeast of the primary body, however they are generally discontinuous and of limited strike (<200 m) and thickness.

Copper mineralisation shares associations with chalcopyrite, bornite and chalcocite and is hosted by either thin veinlets, as disseminated sulphide crystals or as massive sulphide zones.

Hornfels hosted mineralisation is of lower grade than that of the skarn type deposits and occurs predominantly as disseminated sulphides. Mineralisation is fine grained and consists of copper in association with chalcopyrite, bornite and molybdenum. No massive sulphide zones or veining has been recognised within the texturally massive and highly fractures rock mass. Earlier observations of copper associated with pyrite and pyrrhotite coating fracture planes has been attributed to secondary enrichment.

The mineralised body shows no preferential orientation, it is shallow, tabular shaped and approximately 1,200 m in length, 1,000 m wide and generally 10 to 50 m thick, although a maximum thickness of 826 m was intercepted in drillhole ZK3216. It pinches out in the westsouthwest and in general is thinner towards both the west-northwest and east-southeast.

Mineralisation in porphyritic granodiorite and monzogranite is characterised by molybdenum with lesser amounts of chalcopyrite and bornite. Sulphides are medium to coarse grained and confined to a thin horizontal pipe shaped body with a maximum known thickness of 476 m. The porphyritic host lies beneath the Duodigou Formation and appears intruded into the sheared contact between the two basement units.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Production

Due to the overflow of the tailings dam on March 27, 2023, production at the Jiama Mine was suspended during most of 2023. On December 15, 2023, certain operations began gradual resumption following the receipt of approval from the Lhasa Municipal Government.
CommodityUnits2024202320222021202020192018201720162015
Copper M lbs  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe138 121 79 40 38 
Gold oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe67,910 70,262 47,710 26,250 24,037 
Silver oz  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe3,782,1513,212,4522,365,5781,233,3121,227,600
Molybdenum lbs  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe
Lead lbs  ....  Subscribe  ....  Subscribe
Zinc lbs  ....  Subscribe  ....  Subscribe
All production numbers are expressed as metal in concentrate. ^ Guidance / Forecast.

Operational metrics

Metrics2024202320222021202020192018201720162015
Daily processing capacity  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe50,000 t28,000 t6,000 t6,000 t
Ore tonnes mined  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe2,364,892 t2,132,483 t2,317,522 t
Tonnes processed  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe12,348,777 t10,431,401 t
^ Guidance / Forecast.

Production Costs

CommodityUnits2023202220212020201920182017
Cash costs (sold) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 2.51 / lb   2.25 / lb   2.05 / lb  
Credits (by-product) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe -0.87 / lb   -0.89 / lb   -1.11 / lb  
Cash costs (sold) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 1.63 / lb **   1.36 / lb **   0.94 / lb **  
Total cash costs (sold) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 3.17 / lb   2.97 / lb   2.47 / lb  
Total cash costs (sold) Copper USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 2.29 / lb **   2.08 / lb **   1.36 / lb **  
** Net of By-Product.

Financials

Units2023202220212020201920182017
Capital expenditures M USD 137.7   207  
Revenue M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe 452.2   383.8   178.2  
Operating Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -4.1   34.9   50.5  
Pre-tax Income M USD  ....  Subscribe  ....  Subscribe  ....  Subscribe  ....  Subscribe -5   8   64.9  

Required Heavy Mobile Equipment

Lock

- subscription is required.

EV - Electric

Personnel

Mine Management

Job TitleNameProfileRef. Date
....................... Subscription required ....................... Subscription required Subscription required Sep 2, 2024
....................... Subscription required ....................... Subscription required Subscription required Sep 2, 2024
....................... Subscription required ....................... Subscription required Subscription required Sep 2, 2024

EmployeesYear
...... Subscription required 2023

Aerial view:

Lock

- subscription is required.