Mining Intelligence and News
DRC

Namoya Mine

Click for more information

Categories

Summary

Mine TypeOpen Pit
StatusCare and Maintenance
Commodities
  • Gold
Mining Method
  • Truck & Shovel / Loader
Production Start... Lock
SnapshotNamoya Mine was put on care and maintenance on 2020. Namoya has historically suffered from Mai-Mai attacks, employee abductions — which ultimately pushed Banro into declaring force majeure and selling the asset.

Shomka Capital claim they acquired Namoya through a transaction with Banro and a preventif court procedure. At the same time, Stratégos Group also assert rights to the same assets. A 2025 investigation shows that the Stratégos vs. Shomka vs. Banro/creditors dispute remains unresolved. For an investor or lender, this is a red flag: financing a restart without a clean title and a clearly defined operator is nearly impossible.

Shomka Resources proposed timeline for the Namoya site mobilization to first gold pour in October 2024. There is no publicly verified evidence that Namoya entered commercial production in 2025. On the contrary, the latest analytical sources explicitly indicate continued idling. Therefore, as of November 2025, the mine is not operational.

Owners

SourceSource
CompanyInterestOwnership
Baiyin International Investment Ltd. 34.5 % Indirect
Shomka Capital Limited 65.5 % Indirect
Namoya Mining SA. (operator) 100 % Direct
Shomka Resources Limited, a Hong Kong based resources company is pleased to announce that it has reached an agreement to buy 100 percent interest in Namoya Mining.

Shomka Resources is a JV owned 65.5% by Shomka Capital Ltd and 34.5% by Baiyin International Investments Ltd.

Deposit type

  • Breccia pipe / Stockwork
  • Vein / narrow vein

Summary:

The Namoya deposit includes the Kakula, Kangurube, Muviringu, Mwendamboko, Seketi and Summit deposits.

The Namoya Project lies on the western edge of the Kibaran Mobile Belt (KMB). The KMB is an intercontinental mobile belt which was formed during the Mesoproterozoic between 1.4Ga and 0.9Ga when the supercontinent Rodinia was formed. The KMB is also known as a metallogenic province.

The Namoya Project, even though segmented into separate prospects, boasts one type of gold mineralisation style. The following deposit characteristics have been noted:
-gold mineralisation hosted within quartz veins and quartz stockworks, striking in a northwestsoutheast direction;
- prevalence of tourmaline crystals within the quartz veins;
- deformation structures within the quartz veins, resulting in irregular sheets, nested vein sets, ladder veins and micro-veinlets, characteristic of shearing;
- no granitic intrusions in the immediate area of the Namoya orebody (as a possible source of tourmaline) although quartz porphyry intrusions have been intersected by drill holes at Namoya Summit and Muviringu signifying potential for a deep seated granitic body; and
- sericite/chlorite schists, sometimes with carbonates, indicative of a magmatic and hydrothermal processes.

The deposit characteristics are typical of the intrusion-related, tungsten/tin-associated type. This class of magmatic-hydrothermal deposits occurs within magmatic provinces best known for tungsten and/or tin mineralization. This type of deposit contains a metal suite that includes some combination of bismuth, tungsten, arsenic, tin, molybdenum, tellurium and antimony and contrasts with that found in more widely-developed goldrich porphyry copper deposits.

Reserves

Lock

- subscription is required.

Mining Methods

Lock

- subscription is required.

Heavy Mobile Equipment

Fleet data has not been reported.

Comminution

Crushers and Mills

Lock

- subscription is required.

Processing

Lock

- subscription is required.

Commodity Production

Namoya mine was only one month into production in 2020.
CommodityUnits20202019201820172016
Gold koz  ....  Subscribe25376993
All production numbers are expressed as metal in doré.

Operational metrics

Metrics20172016
Stripping ratio 3.8 3.55
Ore tonnes mined 1,516,045 t2,100,343 t
Total tonnes mined 7,282,882 t9,546,622 t
Annual production capacity 100 koz of gold metal in concentrate

Production Costs

Commodity production costs have not been reported.

Aerial view:

Lock

- subscription is required.